Tender standard for civilized construction site

⑴ Set up "six cards and one map" on site, that is, project introduction card, construction card, excellence planning card, safety production measures card, fire protection card, civilized construction measures card and construction site layout plan.

⑵ Project introduction card content: The main contents include the general situation of the project, the number of major projects, the name of the construction unit, the name of the design unit, the name of the supervision unit, the name of the construction unit, the commencement date and the completion date, etc. (3) Construction signs: the main content is to introduce the relevant situation of the project management department and the organizational structure of the project department, including the name of the main person in charge, the quality inspection engineer, the safety officer, the person in charge of public security and the emergency contact telephone number.

(4) Excellence planning card: the main contents are the goal of Excellence and the technical measures of Excellence organization.

5] Safety production measures board: the main contents are measures taken to ensure safety production, on-site safety management regulations and requirements, etc.

[6] Fireproof board: The main contents include measures, regulations and requirements such as fire control management, construction site safety protection and guard management, and fire emergency measures.

(7) Civilized construction measures board: The main contents include the layout requirements and measures for living facilities, production facilities, sanitary conditions, environmental protection measures, labor competitions, etc. On the construction site. ⑻ Construction site layout: The main content is to show the general layout of the construction site, indicating the resident positions of the project department and construction teams, the positions and names of main buildings, construction roads and fire control facilities, etc.

(9) The font of the above picture cards is beautiful, regular and orderly. Project introduction card, merit plan card, safety measures card, construction sign, construction site plan and construction image progress chart are arranged in a column, which is located in an eye-catching position on the construction site. If the construction unit has special requirements, it shall abide by its relevant provisions. (1) Team is strong. The project team adheres to the principle of grasping two civilizations together, attaches importance to the creation of civilized construction sites, and stresses learning, politics, honesty, hard work, unity and cooperation, honesty, democratic style, high prestige and strong organizational ability. Party organizations play a good role as the core and fortress, conscientiously implement the regulations and systems of higher authorities, and implement effective measures.

The team is excellent. Excellent thinking, daily study and education, construction personnel love the site, stress morality, diligence and dedication; Excellent technology, combined with construction to pay close attention to business technical training, construction personnel can master the operating skills of this position; Good style and discipline, sound management rules and regulations, construction personnel obey orders, obey orders, can fight tough battles and have no crime.

(3) The site is clean and tidy. The living space is reasonably arranged with complete facilities, the kitchen, bathhouse and toilet are clean and hygienic, the dormitory is uniform, and the conference room, library and entertainment and sports venues are arranged in an orderly manner; The management of the construction site is standardized, the signs are complete, the specifications are unified, the management of mechanical equipment and materials meets the requirements of standard implementation, and the site is often tidied up and kept clean.

(4) Strong encouragement. The construction mobilization education was timely, the slogan was loud, the labor competition achieved remarkable results, party member took the lead, the construction workers were highly motivated, and the on-site working atmosphere was strong.

5] time limit for a project guarantee. It can optimize the construction organization design, rationally allocate production factors, complete the physical workload beyond the plan, and the project progress is among the best among the participating units, meeting the construction period requirements and satisfying the owners.

[6] The product quality is high. The quality objectives of the project are clear, the phased planning is concrete, the quality system is sound, the control measures are strict, and the ISO9002 quality standard is seriously implemented. The qualified rate of the first inspection and evaluation of the unit project is 100%, and the excellent rate of the unit project is over 85% for the railway comprehensive project, over 80% for the highway project, over 40% for the housing construction project, and other projects have reached the level stipulated by the industry (contract).

Once the safety standards are met. The site safety organization is sound, the system is perfect, the responsibility lies with people, education is always unremitting, inspection is serious, prevention is effective, safety protection conforms to the construction norms and standards, there is no work-related death, serious injury and major mechanical equipment accident, no fire accident, no serious pollution and nuisance, no food poisoning and infectious diseases. Become effective. Strengthen the contract management, strictly control the cost, carefully calculate everywhere, the project is not over-funded, the staff salary is paid on time, and the contracted profit index can be exceeded. (1) Leaders attach importance to it and take effective measures. The leadership of the unit has a strong sense of "creation", can incorporate the creation work into the work plan, often conduct research and layout, is willing to invest, has institutions and personnel responsible for the creation work, has detailed creation plans and specific steps and measures, and has inspection and appraisal.

(2) Solid education and in-depth activities. Strengthen ideological and political work and carry out various kinds of education in a targeted manner, so that employees have a strong sense of creation. The goals, measures and requirements created are deeply rooted in the hearts of the people. The founding activities are vigorous and down-to-earth, all the staff are enthusiastic and have a strong sense of "creating the first class and striving for the first".

(3) remarkable achievements and outstanding performance. Each work area must carry out activities to create a civilized construction site, with no dead ends, strict project management system and high management level, and must create a good reputation inside and outside the company to make management at the leading level.