Ministry of Communications 1 Construction Contract Party A:
Party B:
In order to ensure the quality and quantity of road hardening project completed on schedule. Party A and Party B sign the following contract through consultation.
1. Project name: Road hardening and fitness square project.
Second, the project content: cement hardened pavement is about _ _ m;; The fitness square is about _ _ _ square meters (including laying colored bricks, paving kerbs and building cultural walls) as a part of the cement pavement.
Three. Duration: from _ _ _ _ to _ _ _ _ _, * * days.
Four. Contract price: RMB _ _ Yuan only (__.00 Yuan).
5. Contracting method: Party B contracts the project and materials.
The unit price and settlement method of intransitive verb project: the cement hardened road is RMB per square meter according to the finished concrete area; RMB _ _ _ yuan per square meter for laying colored bricks, RMB _ _ _ yuan per linear meter for paving kerbs, RMB _ _ _ yuan per linear meter for cultural walls (_ _ _ cm in width and _ _ _ m in height), and RMB _ _ _ yuan per square meter for concrete hardened ground. During the construction period, Party A will not pay the advance payment. After the project is completed, Party A will pay 80% of the total project price to Party B. If the project is qualified, the remaining project funds will be paid in one lump sum.
Seven, construction requirements and quality standards:
1, pavement width _ m, thickness _ m.
2. Party B shall ensure the quality and quantity according to Party A's construction requirements, and shall not cut corners. Accept the supervision of Party A and complete the project on schedule.
3. The foundation is rolled and leveled, and C20 concrete is poured. The protoplasm is sealed to ensure the smooth road surface. The width is consistent.
4. Before laying colored bricks, concrete cushion with a thickness of __cm should be poured to ensure that the colored bricks are smooth. The cultural wall and the road are evenly jointed along the lime, and the height is consistent.
Eight. Other agreed matters:
1. The project quality shall be supervised by Party A, and Party B shall be responsible for completing it on time.
2. Party A shall assist Party B to solve the interference in the construction. During the construction period, Party B shall set up engineering signs to ensure the safety of pedestrians.
Nine. This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature and seal.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Construction Contract II of Party A of Ministry of Communications:
Party B:
According to the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, and following the principles of equality, voluntariness, fairness, honesty and trustworthiness, both parties reached an agreement on the construction of this project and signed this contract for mutual compliance.
I. Projects
1. Project name: concrete road construction project.
2. Project location:
3. Contract scope: concrete construction. (Including lime powder, soil mixing, compaction, concrete locking, joint cutting, etc. )
4. Contract method: contract cleaner (with all tools), contract quality, contract duration, contract safety, contract civilized construction and acceptance.
5. Contract price: per square meter 13 yuan (about 230m in length, 8m in width and 20cm in thickness, according to the actual settlement, about 1840m2), and the total price is about _ _ _ _ _ _.
6. Quality standard: qualified
7. Duration: The project started on August 16 and was completed on September 1 5 days.
Second, Locke's architectural technology
1, Luoping: bulldozers leveled Luoping, and manual stringing cooperated with leveling;
2, 3: 7 lime soil paving is carried out in two steps, each step is 15, and lime soil paving is common: bulldozer paves 3: 7 lime soil, which is leveled manually and stirred by mixer;
3. Rolling: use a heavy vibratory roller to stabilize the pressure by static pressure or light vibration, and then strongly compact;
4. Maintenance: After passing the rolling inspection, spray water for maintenance, and the maintenance time shall be no less than 5 days;
5. Concrete lock: supported by 20cm high channel steel on both sides of the road, c20 concrete pouring, vibrating by vibrator, vibrating by paver, lifting slurry, spreading, and machine plastering twice;
6. Curing: covering the film for curing for not less than 6 days;
7. Slotting: After the concrete strength reaches 80%, slot cutting shall be carried out with a depth of 5cm and a spacing of 6 m..
Three. Rights and obligations of both parties
Main work of Party A
1, responsible for site leveling and water and electricity connection;
2. Project coordination, management and acceptance;
3. Pay according to the contract.
Main work of Party B
1. Within 2 days after the signing of this contract, Party B will enter the site to complete the construction preparation.
2. Be responsible for the construction safety within the construction scope of this project. Party B shall strictly implement safety protection measures in accordance with relevant regulations, and bear the responsibility for accidents caused by improper safety measures and the expenses arising therefrom;
3, to do a good job in the custody of on-site equipment and materials. Make site construction records and cooperate with Party A in quality inspection;
4, responsible for the acceptance of construction projects.
Fourth, the settlement and payment of the project price
1, according to the actual area, 13 yuan/m2;
2. After the roller is leveled, 5000 yuan will be paid after mixing and rolling lime soil, and 5000 yuan will be paid after paving concrete roller. After the acceptance of the project, 95% of the total settlement price of the project will be paid, and the remaining 5% of the quality deposit will be paid. The warranty period is three months. If there are quality problems caused by Party B during the warranty period, Party B will repair them for free. If Party B fails to arrive within two days, Party A will deal with it, and the expenses incurred will increase by 65,438.
Verb (abbreviation of verb) Safe and civilized construction
1. Party B shall carefully organize, conduct civilized and safe construction according to the management regulations and management system of the project construction site; Party A has the right to stop Party B from violating the site management system until it is fined and the contract is terminated.
2. Party B shall be responsible for all safety accidents and quality accidents in the construction process, and bear corresponding economic responsibilities, legal responsibilities and all corresponding economic compensation.
Completion acceptance of intransitive verbs
Party B shall notify Party A to organize the completion acceptance before the project meets the completion acceptance conditions. After receiving the notice, Party A shall promptly organize relevant personnel to carry out acceptance, and give approval or put forward rectification opinions within a time limit after passing the acceptance. Party B shall rectify as required and bear the expenses caused by its own reasons.
Seven. responsibility for breach of contract
1. If the construction period is delayed due to Party A's reasons or irresistible reasons, the construction period will be postponed and the expenses will not be counted.
2. If Party B fails to complete the project on time within the time limit specified in the first paragraph of Article 7 of this contract, Party B shall pay a penalty of 300 yuan/day to Party A for each day of delay, and bear all losses caused to Party A therefrom.
3. If the quality of the project fails to meet the quality standards agreed in this contract due to Party B's reasons, Party B shall unconditionally rework, rectify, repair or take other remedial measures to meet the contract quality standards, and all expenses arising therefrom, including the expenses for reinspection, shall be borne by Party B, and 5% of the total project cost of Party A shall be compensated as liquidated damages. If the contractor fails to improve the engineering quality of Party B within 7 days after Party A puts forward the rectification requirements, Party A has the right to arrange another unit to complete the corresponding rectification work, and all expenses and losses arising therefrom shall be borne by Party B. ..
Eight. Entry into force and termination of contract
1. This contract shall come into effect after being signed by the legal representatives of both parties or their entrusted agents;
2. The conclusion date of this Contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3. After Party A and Party B have fulfilled all their obligations under this contract and Party B has delivered the completed project to Party A, this contract will be terminated after paying the completion settlement price.
IX. Contract Quantity
1. The original of this contract is in triplicate, each party holds one copy, and the financial copy has the same legal effect;
2. For matters not covered in this contract, both parties may sign a supplementary agreement separately.
Party A: (official seal) _ _ _ _ _ Party B: (official seal) _ _ _ _ _ _
Handler: _ _ _ _ _ _ _ Handler: _ _ _ _ _ _
Tel: _ _ _ _ _ Tel: _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Third Contract of Ministry of Communications: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _
According to the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, Party A subcontracts the rural road construction project from the ancient city of Saisishi Town to Mazatang Village to Party B, and Party B is responsible for the contracted construction. Following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the construction matters of this construction project, and defined the rights and obligations of both parties, and entered into this contract through consultation.
I. Overview of the Project
Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1, the subgrade is 5km long and the pavement is wide.
3, 5 meters, the total decoration area is _ _ _ _ _ _ square meters, and the bid price is _ _ _ ten thousand yuan.
2. The road surface is 5 kilometers long and the desertification road surface is wide.
3, 5 meters, thickness 15 cm, total desertification area of _ _ _ _ _ _ square meters, the bid price of _ _ _ _ ten thousand yuan.
3. Four culverts have been laid, and the culverts are deep.
3, 5 meters, the tender price is _ _ _ ten thousand yuan.
Project content: subgrade treatment, sand surface, small bridge and culvert, shoulder cultivation.
Second, the scope of project contracting
Scope of contract: all contents of construction design.
Third, the project price and payment method
Total contract price (in words: _ _ _ _ _ _ _ _ _ _ _): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The project price shall be paid in installments according to the progress of the project, and the final accounts shall be made after the project is accepted. Party A shall deduct 5% of the total project price as quality deposit, and pay it to Party B after the project is completed without quality defects.
Four. Rights and obligations of both parties
1. Party A shall provide the drawings, and Party B shall carry out the construction according to the drawings and technical specifications of the highway reconstruction project, and ensure the quality is qualified.
2. Party B must start work within 3 days from the date of signing the contract.
3. Party A has the right to supervise and manage Party B's construction, and Party A shall inspect and accept Party B's construction according to the construction progress, and the construction of the next working procedure can be carried out only after it is qualified.
4. Without the consent of Party A, Party B shall not change the project manager, otherwise, Party A has the right to terminate the contract.
5. Party B shall not subcontract the project without the consent of Party A. Otherwise, once verified, Party A has the right to terminate the contract and will not bear any legal responsibilities arising therefrom.
6. During the construction period, Party B shall ensure the construction safety. In case of work-related injuries and other safety accidents, Party B shall be responsible. If Party B's construction causes damage to the property or personal of the state, collective and individual, Party B shall be responsible for compensation.
7. Party A is responsible for coordinating and handling disputes in the construction process.
8. All taxes and fees required for the construction shall be borne by Party B. ..
Verb (abbreviation of verb) liability for breach of contract
1. Party B must complete the project on time, otherwise, Party B shall pay RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. If Party B terminates the contract midway, Party A will not compensate for the investment in the previous construction, and the project price allocated by Party A will be returned by Party B. ..
3. If Party A's acceptance of the project quality is unqualified and needs to be reworked and repaired, Party B will unconditionally rework and repair it until it reaches the required standard, and the losses shall be borne by Party B..
4. If Party A terminates the contract without reason and causes losses to Party B, Party A shall be responsible for compensating Party B for the losses. If the quality of the project does not meet the standard and needs to be reworked and repaired, and Party B refuses to rework and repair, then Party A has the right to terminate the contract and terminate the contractual relationship, and the investment loss shall be borne by Party B, and the project price allocated by Party A shall be returned by Party B. ..
VI. Term of the Contract
Commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
The total number of calendar days in the contract period is _ _ _ _ _ _.
Seven, quality standards
Engineering quality standard: qualified.
Eight, the contractor promises to the employer to carry out construction and completion in accordance with the contract, and undertake the project quality warranty responsibility within the quality warranty period.
Nine, the employer promises to the contractor to pay the contract price and other payments in accordance with the time limit and manner agreed in the contract.
X. Entry into force of the contract
This contract shall come into effect after being signed and sealed by both parties.
Party A (signature): _ _ _ _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Phone number: _ _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ Phone number: _ _ _ _ _ _ _ _ _ _ Phone number
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Ministry of Communications Construction Contract 4 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Through consultation, Party A and Party B reach an agreement on the construction of this project and conclude this contract for compliance.
I. Projects
1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Project location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
3. Contract scope: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
4. Contracting method: The contractor does not include materials, quality, transportation, construction period, safe and civilized construction and acceptance. Party B shall be responsible for the construction machinery.
5. Contract price:
Pavement hardening is RMB _ _ _ _ _ _ _ _ yuan per meter. Including joint cutting, maintenance, template removal and other work related to pavement construction. (The settlement shall be subject to the actual measurement after completion).
6. Duration: It will be completed in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. Such as aggregate, cement and other raw materials. If it cannot be put in place, the construction period will be postponed. It rained for three days, and the construction period was postponed.
Second, the technical requirements
The pavement is _ _ _ _ _ _ _ cm thick, _ _ _ _ _ _ cement concrete pavement, and _ _ _ _ _ _ _ _ meters wide.
Third, the construction and quality requirements
Strictly control the road width. , flatness, vertical and horizontal slope, material quality, and construction according to the requirements of supervision and specification. The cushion must be compacted, otherwise all losses caused by rework shall be borne by Party B. ..
Four. Rights and obligations of both parties
1, rights and obligations of employers
The employer is appointed as the on-site representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Authority: Supervise and control the quality, progress and on-site project quality in the construction stage, and participate in the relevant work of project completion acceptance.
2. The main work of the employer:
Responsible for on-site coordination;
3, the rights and obligations of the contractor
Name of project leader:
On behalf of the contractor, the person in charge of the project is fully responsible to the owner for this project.
4, the main work of the contractor:
Responsible for the construction safety within the construction scope of this project. The contractor shall strictly implement the safety protection measures according to the relevant regulations, and bear the responsibility for the accidents caused by improper safety measures and the expenses arising therefrom; Do a good job in the custody of on-site equipment and materials. Make records of on-site construction, and cooperate with the owner and supervision unit for quality inspection.
Verb (abbreviation of verb) payment of project price
After the construction of this project, it will be paid in installments to _ _ _ _ _% of the total price according to the progress. The remaining amount shall be paid within 30 days after the project is completed and accepted. (The taxes and fees shall be paid by Party A).
Party A:
Party B:
Time:
Owner of the Ministry of Communications (full name) Construction Contract 5:
Contractor (full name):
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, both parties reached an agreement on the construction project and concluded this contract.
I. Overview of the Project:
The hardening area of road hardening project is about _ _ _ _ square meters. The project includes subgrade leveling, cement pavement pouring and so on. , the budget is about _ _ _ ten thousand yuan.
Second, the contract period:
The project was completed before _ _ _ _ _ _.
Third, the quality requirements and reward and punishment measures:
1, to ensure that qualified (organized by the two committees of the village to invite professionals to accept), safe production and civilized construction must be achieved.
2. The main roads in the village are constructed according to the cement concrete pavement standard of Grade IV highway, and the quality target is qualified.
(1) cement concrete grade C25 grade, thickness 15cm, bending and tensile strength above 4.5Mp
(2) The main materials in construction should be tested for various physical performance indexes, among which the coarse aggregate must be crushed stone, which meets the relevant national standards. According to the index of materials and the actual label of cement, choose the best mixture ratio (cement should have factory certificate and quality certificate); During the construction, the test shall be carried out in strict accordance with the Test Specification for Cement Concrete in Highway Engineering, and unqualified materials shall not enter the site for construction.
(3) Anti-skid measures such as transverse napping or machine pressing groove should be taken for the pavement, and its friction force should meet the requirements of construction specifications. When connecting with other structures, the pavement should be smooth, so that there is no water on the edge of the pavement.
(4) After concrete paving, it shall be maintained according to the requirements of construction specifications; The appearance of concrete pavement is free of peeling, marks, cracks, exposed stones, lack of edges and corners. , in line with the specifications and process requirements.
(5) Engineering files and test data shall be submitted to _ _ _ _ village committee for future reference.
3. Reward and punishment measures: The contractor must construct in strict accordance with relevant codes and standards to ensure the quality of the project. If the project quality is not up to standard, it must be reworked unconditionally and bear the rework losses. The warranty period is one year.
Four, the way of project contracting:
The contractor and materials, the settlement of the completed project is based on the contract price, and the contract unit price is 15CM thick cement pavement slab, and the unit price is 40 yuan/m2; The engineering quantity should be settled according to the facts.
Verb (abbreviation for verb) Terms of payment:
50% of the pavement hardening project is completed, and 20% of the contract price is paid; After all the projects are completed and accepted, 90% of the total project price will be paid after the superior funds are in place, and the performance bond will be returned; Withhold 10% as the project quality deposit, and the quality deposit will be paid within 1 month after the quality guarantee expires.
Six, the contractor to provide the performance guarantee to the employer, the guarantee way is:
The performance bond is RMB, which will be refunded after the project acceptance.
Seven, reward and punishment measures:
1. The project was completed before _ _ _ _ _ _. Except for force majeure, the penalty for delaying the construction period is 100 yuan per day.
2. After winning the bid, the contractor shall submit to Party B a detailed list of the project management team when bidding for this project, and require the project manager to be on duty for no less than 20 days every month. Without the prior consent of the employing unit, those who are found to be absent from the post without authorization during spot checks shall be fined 100 yuan per person per day in addition to being ordered to arrive at the post. In addition, after the signing of the project contract, subcontracting is not allowed, otherwise it will be regarded as abandonment, the performance bond will not be returned, and the project will be re-tendered.
3, the contractor must accept the employer's supervisor supervision, accept the rectification opinions.
Eight, safety responsibility:
1. Before construction, the Employer shall be responsible for cleaning up the crops within the construction scope; During the construction period, the Employer shall be responsible for handling disputes related to policies.
2. During the contractor's construction, the blaster must hold relevant certificates (three members and three certificates are complete) and go through relevant formalities such as safety insurance. For accidents such as personal safety, traffic safety and group disputes caused by the contractor, all responsibilities and economic compensation shall be borne by the contractor.
Nine, this project bidding documents as an attachment to sign the construction contract, the contractor shall abide by laws, regulations and relevant policies of the construction industry.
X. The responsibility and obligation of project quality warranty shall be implemented according to the Regulations on Quality Management of Construction Projects issued by the State Council 20xx65438+1October 20th and other relevant laws and regulations.
1 1. This contract is made in triplicate, one for the contractor and the employer, and one for the office.
Twelve. Entry into force of contract
Time of contract conclusion: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Contract signing place:
This contract shall come into effect after being signed and sealed by both parties.
Employer: (official seal)
Contractor:
On behalf of:
Domicile:
Telephone:
Telephone:
Date:
Date:
- Previous article:What are the specialties of Nantong?
- Next article:List of Top Ten Buildings in Zhuhai Real Estate
- Related articles
- Don’t forget your original intention and forge ahead—Record of the housing delivery work at Chongqing BBMG Dacheng Xincheng No. 2 Land
- The glory of the king pupils' lines
- The Mu Us Desert is about to disappear. Why?
- Father-daughter movement slogan
- The comments of fan support groups are often controversial. Which star support groups often drag their feet?
- The police informed the students that they were beaten at the school gate. What information is worth paying attention to?
- What is the umbrella frame quotation?
- One-way lane dividing line
- The more advertising slogans for footwear promotion, the better?
- A nifty and interesting copy sent by a blind date (22 selected sentences).