What are the steps of geotechnical investigation?
See and seriously think about the problem.
Second, raising awareness of the importance of the preparatory work is the key to doing a good job in the preparatory work.
Before a survey team engages in a survey project, it is necessary to make good preparations, which is related to many factors, such as the quality of personnel, equipment and economic strength of this team. However, I believe that in practical work, whether the preparatory work can be made concrete and sufficient to avoid negligence and omission depends on the understanding of the importance of the preparatory work. Defining the importance of preparatory work is to make the on-site investigation work planned and purposeful, avoid shutdown and rework, and is the premise and guarantee to ensure the quality of engineering investigation. Unprepared work is very blind, which easily leads to the waste of project costs.
Third, the content of the preparatory work
Geotechnical engineering investigation can be divided into site selection investigation, preliminary investigation and detailed investigation according to different investigation stages. The contents of its preparation work are determined according to the investigation tasks in different investigation stages, and the contents of its preparation work are different in different investigation stages, so it can be carried out from coarse to fine according to different investigation stages. Generally speaking, there are three aspects to be done, the first is to collect data, the second is to arrange drilling holes, and the third is to conduct on-site reconnaissance and positioning.
(1) The work of collecting data is very important and cannot be ignored. A survey team surveyed a project in a community in Shenzhen. The local area is dominated by river alluvial landform, and there are many artificial pits and ponds. After years of landfill, they have become flat. The survey unit did not seriously collect the original local topography and landforms, nor did it visit nearby residents. It only infers the natural foundation from the drilling results. The actual situation is quite different from the survey report during construction and excavation. All the holes in the original building were arranged on the pit and pond.
The main data to be collected are shown in the following table:
(2) According to the importance of the building and the complexity of the site, determine the location, spacing and depth of drilling holes, sampling and in-situ testing parts of technical holes, etc. Will be arranged. See the table below for drilling layout requirements:
The drilling depth should be determined according to the compression layer of the foundation, and the control hole should be deeper than the compression layer to know whether there is a weak substratum. The exploration hole can be shallower than the compressed layer, and the soil layer can be distinguished.
The foundation width b of small and medium-sized projects is less than B.
- Related articles
- Collection of sanitary slogans for public toilets in schools
- Advertising words about rural areas
- Does the third pedicure shop recruit female students?
- How to make celery scrambled eggs delicious?
- Party History and Campus Slogans
- Shitingzi town leading group
- Slogans about reading
- The activity planning scheme of May 4th Movement.
- Hunan Edition Primary School Grade Two Art Teaching Plan
- Seventh Grade Chinese Language Midterm Exam Paper