Consider five key links to promote the construction of key projects

Key construction is the leader of project work. Projects that have entered the provincial and municipal key projects are the projects that governments at all levels must focus on, and they are projects that have a "green light" from landing to completion. As long as the issues raised by owners are reasonable and legal, they must be managed and resolved. This is our basic attitude in focusing on key construction projects. 1. Regarding transportation projects. Based on the current status of our city's transportation infrastructure and the needs of future development, we must establish a rolling development and sustainable development transportation project continuity mechanism around the planning and construction of expressways, railways, airports, and rural roads, so that one plan can be connected with another and one can be built. Successfully build a transportation hub with "depth advancement and continuous development". Specifically, we will talk about two aspects of projects: (1) Expressway projects. Shaosan Expressway will be coordinated by the ## Bureau to solve the problems of land acquisition and forest felling for the power line corridor in the Shaxian Service Area and Jiangle Parking Area to ensure that it will be completed and open to traffic by the end of the year. The Quansan Expressway will be deployed in accordance with the special meeting held by Vice Mayor Zhang Falu on May 17. Relevant units in the counties (cities, districts) and municipalities along the route are requested to speed up preparations for land acquisition, demolition, initial construction approval, etc. to ensure that the project will be completed by July 28 Construction of the Yong'an section of the road started on the same day, and construction of the entire line will begin before November. The Yongwu Expressway needs to be approved for construction work, and preliminary design must be stepped up to start construction by the end of next year. The route of the Yongning Expressway has been determined, and a pre-feasibility study will be launched within the year. (2) Railway projects. The preliminary work of the Xiang-Puzhou Railway is progressing rapidly, and the Ministry of Railways has agreed to start a pre-feasibility study in the second half of the year. Relevant departments at all levels must follow the instructions of Governor Huang Xiaojing to do a solid job in the preliminary work of the project and strive to start construction as soon as possible. At the same time, we must seize the opportunity of the Ministry of Railways to start the transformation of the Yingxia Line, seize the communication with the Nanchang Railway Bureau, the Provincial Development and Reform Commission, and the Local Railway Construction Corporation, strive to participate in the preparation of the technical transformation plan of the Yingxia Line, and do a good job in the rerouting and transformation of the Sanming Section. We are striving for work and planning and building a freight transfer station in Shaxian County. Continue to deepen the preliminary work of the Changyong Railway and strive to start construction during the "Twelfth Five-Year Plan" period. 2. Regarding energy projects. It is necessary to speed up energy development, optimize the energy structure, focus on the construction of large and medium-sized hydropower projects, develop thermal power projects, and actively strive for the deployment of LNG (liquefied natural gas) projects in our city. Construction and renovation projects that need to be focused on include: (1) Street power station projects. This project is a key inspection project in the province, and provincial leaders are paying close attention to it. It is necessary to conscientiously do a good job in the relocation and resettlement of immigrants in the reservoir area, so that the work in the reservoir area and the construction of the power station are basically synchronized. Especially now that we have entered the main flood season, we must do our best to prevent floods in the reservoir area to ensure the safety of immigrants' lives and property. (2) Thermal power projects. Seizing the current favorable opportunity for the development of thermal power projects, Datian County should speed up the construction progress of the Yiyuan Thermal Power Comprehensive Utilization Coal Gangue Expansion Technical Transformation Project, and Yong'an City should do a good job in coordination and dispatching of the resource comprehensive utilization power plant project. Both projects will be completed within the year. Completed basic engineering construction and partial equipment installation. (3) LNG (liquefied natural gas) projects. Relevant municipal departments such as development planning, economy and trade, and construction must work closely together to promote the preliminary work of the project, and actively communicate with companies such as China Fujian and CNOOC to win provincial support and strive to be included in the second phase of the province's overall LNG project and be launched as soon as possible Feasibility study. (4) Power grid reconstruction project. Sanyuan and Meili should assist the Municipal Electric Power Bureau in coordinating compensation with villagers to ensure the smooth implementation of the construction of Sanming's main power grid. Relevant counties (cities) should actively cooperate to help the power department carry out land acquisition and demolition work, reasonably determine compensation standards, and solve problems encountered in the construction and transformation of county power grids. The power department must do a good job in construction design, speed up the construction progress, and ensure the completion of the annual investment task of 230 million yuan. 3. Regarding agricultural projects. It is necessary to follow the path of industrialization to drive agricultural industrialization, starting from special industries such as yew deep processing and beef cattle, and build a cross-strait forestry cooperation experimental zone development platform. Relying on the carrier of the Forestry Fair, we should focus on the strong driving force and great influence. agricultural projects. Specific projects include: (1) Beef cattle industrialization project. The four counties of Mingxi, Ninghua, Qingliu, and Jianning and the Municipal Animal Husbandry and Fisheries Bureau must follow the work requirements of “counties focus on industries, villages focus on bases, villages focus on large households, and department services” determined by the city to do a good job in beef cattle breeding bases, The four important links of beef cattle breeding, pasture cultivation and beef cattle processing enterprises are to continuously expand the market, improve product quality and enhance consumers' sense of identity. Regarding the electricity pricing issue raised by project owners, the power department is requested to implement non-industrial and general industrial electricity prices for agricultural and breeding projects in accordance with relevant support policies. (2) Cross-Strait Forestry Cooperation Experimental Zone Project.

The municipal government, together with the Provincial Forestry Department, has submitted to the State Forestry Administration the overall construction plan for the Cross-Strait Fujian-Taiwan Modern Forestry Cooperation Experimental Zone, focusing on planning and construction of forest product processing, biopharmaceuticals and proprietary Chinese medicine development, forest food processing, and biological diversity within the city. 5 cooperation functional areas including sexual protection, seedling and flower breeding, forest ecological leisure and sightseeing, etc., and launched the first batch of 10 key cooperation projects. The next step is to intensify the application work, strive to be approved before the Forestry Fair, and be awarded the license at the Forestry Fair. After several years of hard work, Sanming will be gradually built into an important base for modern forestry cooperation across the Taiwan Strait. (3) The First Cross-Strait Forestry Fair Project. The Municipal Party Committee and the Municipal Government decided to take advantage of the approval of the Cross-Strait Fujian-Taiwan Modern Forestry Cooperation Experimental Zone to hold the first Cross-Strait (Sanming, Fujian) Forestry Cooperation and Investment and Trade Fair from June 26 to 28 this year. The launch project of the (Sanming) Modern Forestry Cooperation Experimental Zone serves as an important carrier to display the image of Sanming and an important platform for economic and trade activities. At present, in accordance with the deployment of the Forestry Fair’s leadership group, we must promptly formulate work plans, invite important merchants, implement investment projects, and start the exhibition hall layout to ensure the success of the Forestry Fair. After several years of hard work, we strive to gradually build a provincial and even national regional economic and trade activities, and build an exhibition brand with certain influence and popularity. 4. Regarding industrial projects. It is necessary to rely on industrial concentration areas such as Jinshayuan, Nigeyuan and Xiaojiao to highlight major projects, seize leading enterprises, combine regional characteristics, continuously extend the industrial chain, cultivate industrial clusters, and build metallurgical and rolling industry bases, truck and automobile parts. Accessories industry base, forest products industry base. Specific projects include: (1) Three Steel medium and thick plate production line projects. This project started on May 16, and now we need to speed up the progress and strive to complete and put into production in October next year. It is necessary to enhance the linkage, driving force and relevance of the development of leading enterprises, try to increase the product links of industrial clusters in our city, and attract more downstream products to Sanming, lengthen the industrial chain, enhance agglomeration, and strive to achieve greater success by 2008. Many industries have entered the ranks of industrial clusters with an output value exceeding 10 billion yuan in the province. (2) Yongan Automobile Factory Truck Project. Among the three industrial clusters, the machinery industry is the weakest and lacks leading enterprises with strong driving force. To make the machinery industry bigger and stronger, we must focus on projects such as trucks and extend the industrial chain of trucks and auto parts. The truck project has been included in the provincial automobile industry's "Eleventh Five-Year Plan" development plan, and the institutional relationship of Yong'an Automobile Factory has been straightened out. The Municipal Economic and Trade Commission and Yong'an City must study how to make leading machinery enterprises bigger and stronger, and pay close attention to land acquisition and storage. work, increase investment, speed up progress, and step up preparations for investment promotion activities for automobiles and spare parts in June. (3) Daya Wood Industry Project. The city should continue to increase coordination efforts and focus on helping to solve two problems: First, assist in the supply of raw materials. At present, the Municipal Forestry Bureau has started the supply of raw materials and the construction of raw material bases in Shaxian, Jiangle, and Meile, and has adjusted the logging quota of 30,000 cubic meters to supply the Daya Wood Industry Project. The next step is to continue to provide materials. The second is to speed up the construction of 110KV substations. The Municipal Electric Power Bureau, Shaxian County, and Jinshayuan Management Committee must cooperate closely to speed up the construction progress and strive to complete the substation construction in September. (4) Jiangle Hongshi, Yongan Jinyinhu, Yongan Moucheng, and Datian Xinyan cement production line projects. The annual planned investment is 260 million yuan, and the owner must increase investment. In addition to putting a production line of Lehongshi into operation, the other three projects must be completed and put into operation within the year. 5. Regarding business projects. It is necessary to introduce powerful trading companies such as Fuzhou Yonghui, develop large projects integrating commerce, trade and exhibitions, build logistics distribution centers, and form a regional market. At present, the focus is on the Science, Technology and Culture Convention and Exhibition Center project. 6. Regarding urban construction projects. It is necessary to intensify the development of urban clusters, speed up the expansion of urban areas from the south to the north and to the west, and use the development and construction of Jinsha Park as a breakthrough to speed up the construction of central cities and promote the integration of cities and counties. Mainly focus on two tasks: (1) Urban real estate projects. The goals for urban real estate projects this year are to exceed 600 million yuan in investment and to exceed 200,000 square meters in completed area. This goal and task should be implemented into specific projects one by one as soon as possible, the work progress should be arranged month by month, and the responsibilities should be detailed one by one. The Municipal Construction Bureau will collect problems existing in the construction of key projects, and the municipal government will hold a coordination meeting for key real estate enterprises in the urban area to study and solve them one by one. (2) City-county integrated conceptual planning. In accordance with the deployment of the Standing Committee of the Municipal Party Committee, we must continue to do a good job in the preparation and revision of the city-county integrated conceptual plan, extensively solicit opinions and suggestions from the urban area, Shaxian County and all walks of life, and submit them to the municipal government for review and the municipal committee for approval as soon as possible. 7. Regarding social undertaking projects.

In accordance with the requirements of the city and county integration and city alliance development strategies, we must strengthen the overall planning of social undertakings projects, rational layout, prioritize, start from the most urgent aspects, start from the most favorable places, and strengthen the business philosophy , use market mechanisms to integrate resources based on the entire system, implement asset replacement, and accelerate the pace of construction. In June, a joint meeting of city and county (district) heads will be held, attended by me and the main leaders of Yongan, Melie, Sanyuan, and Sha counties, to focus on studying the overall layout of social undertakings projects. It will be implemented starting from the "Eleventh Five-Year Plan" and strive to build a number of social undertaking projects that are representative and influential in the province after five years of hard work. (1) Sanming University project. This is a key inspection project determined by the province and a major project in the field of social undertakings. To speed up the construction progress, the Municipal Electric Power Bureau and other units must solve the problem of high-voltage line migration involved in the project construction as soon as possible, and hurry up the construction to ensure delivery and use on schedule. (2) Municipal First Hospital outpatient building project. At present, the progress is relatively fast. We must pay close attention to preliminary work such as drawing design and strive to start construction within the year. (3) Infectious disease area projects of the Municipal First and Second Hospitals. It is necessary to increase coordination efforts, do a good job in mass work, and strive to start construction as soon as possible. Yong'an City must also step up relevant work in accordance with provincial requirements to ensure that construction starts within the year. (4) Projects in the cultural field: Sanming Theater will be opened on National Day this year; the Wanshouyan Cultural Relics Park Site Museum project will start on August 28 and will be completed within the year. (5) Taining Global Geopark Facility Construction Project. Regarding funding issues, ICBC and Agricultural Bank of China should speed up progress and give priority to providing project fund loans. Regarding the construction of the highway from Taining to Wuyishan, the section from Taining Chengguan to Zhukou has been implemented, and the section from Zhukou to Shaowu has been included in the city’s “11th Five-Year Plan” key highway plan and traffic readiness highway plan. The Municipal Transportation Bureau and Taining County We should continue to work hard to strive for the project to be included in the National Warfare Highway Subsidy Plan and strive for the early implementation of the project. In the process of promoting the implementation of key project construction, we must not only strengthen the scheduling of specific projects, but also pay attention to the following five key links: First, continuity. Only when there are projects can there be development, and only when there are rolling projects can there be sustainable development. To grasp the initiative of the project, we must do a good job in continuation work. It is necessary to further improve the continuity mechanism for project development planning, deepening the preliminary stage, starting construction, and completing and putting into production, so as to form a rolling development pattern in which one batch is put into production, one batch is under construction, one batch is started, one batch is reserved, and one batch is planned every year. At present, the most important thing is to start from project solicitation and development, boldly use imagination and creativity, and ensure good project reserves. First, we must focus on the nine major support system reserve projects in the West Coast Economic Zone. In accordance with the requirements of Governor Huang, we will focus on expanding the reserve of productive projects, expand the reserve of projects that are connected to the provincial key industrial clusters, and actively report and connect to the top, striving to have more projects enter the provincial key project plate. Second, we must reserve projects for the trade fair based on the results of the “6·18” project. Further clarify the positioning, use the platform to actively integrate, have more contact with universities, scientific research institutes, and overseas institutions, better promote Sanming, showcase enterprises, and more effectively do project collection, promotion, docking, and transformation. The total number of docking projects and the total investment amount of contract projects in each county (city, district) must be ensured to complete the actual number of the previous session, and strive to increase by more than 20% compared with the previous session, and at the same time complete more than 2 overseas docking projects, so as to achieve this year's "6·18" Various tasks continue to rank among the best in the province. Third, we must reserve projects around the “11th Five-Year Plan”. Take projects as the core of the "Eleventh Five-Year Plan", strengthen work connection and project docking with superiors, generate a number of infrastructure, energy, industrial development, social undertakings and other projects through special planning, and strive to have more projects listed in the national and provincial We will improve the area planning and industrial layout and increase the proportion of our city’s projects in the province’s “Eleventh Five-Year Plan”. Second, submit for approval. Whether a good project can be approved and implemented as soon as possible depends largely on our approval work and our subjective efforts. First, the channels must be smooth. It is necessary to adapt to the new approval requirements after the reform of the investment system as soon as possible, and understand what projects are subject to approval, verification, and filing, what are the procedures for approval, what approval requirements and preconditions are set, and what application materials are required. At the same time, the project construction, financing, implementation and other plans must be thoroughly demonstrated and carefully scrutinized, so that problems are considered first and modifications and improvements are made first, laying the foundation for the smooth submission of the project for approval. Second, the report must be effective. We must carefully study the policies of the country and the province. What projects are needed by the country and the province, we will work on those projects when we report; what issues the country and the province consider, we will reflect on when we report. Through effective communication and reporting, Effectively improve the project selection rate.

Third, tracking should be compact. When running a project, we must do everything possible, keep an eye on it, attack with all our strength, and shorten the project approval time as much as possible. Even for projects that have been confirmed, we cannot take it lightly. We must always keep abreast of the progress of the project, understand the latest trends, and ensure that we run diligently, fast, accurately, and successfully. Especially for large projects, early funding must be guaranteed, and a dedicated team must be responsible, followed by dedicated personnel, and handled on a special basis. Third, elements. The focus is still on solving the "three difficulties" of project land use, financing and demolition. One is the issue of land use. Liu Keqing, director of the Provincial Department of Land and Resources, gave a clear answer when he held an office meeting in Sanming: This year, for 19 provincial key projects involving land in our city, the province will cover all land use quotas; for general industrial project land, the province will first give it to Sanming. 5,000 acres. If it is not used up, we will consider adding an additional 1,000 acres; for social project land, we will prioritize it. In principle, we will first support public welfare projects such as urban road reconstruction. For commercial projects, we must implement bidding, auction, and listing; for hydropower station projects, it is required that every If the area of ??submerged cultivated land with an installed capacity of 10,000 kilowatts is less than 500 acres, it will not be approved; in principle, all urban land use projects will be liberalized. Departments at all levels must pay close attention to research and implement preliminary work on project land use to ensure that the project land meets the conditions for approval; they must pay close attention to the connection, prepare relevant materials with high quality and high standards, and submit them in a timely manner; they must pay close attention to implementation to ensure that funds are in place early and the project is early Construction, early completion, early results. At the same time, it is necessary to make good use of the approved land use quotas to ensure that projects are implemented, and to withdraw or postpone the approval of new land use quotas for the approved and unused land. The second is financing issues. From January to April, the city's loan balance increased by 3.5% year-on-year, and the growth rate decreased by 23.3 percentage points compared with the same period last year. It is hoped that financial institutions will further increase their support to local governments, especially key projects, consolidate and expand the results of bank-enterprise docking, establish a bank-enterprise coordination mechanism with regular contact, communicate in a timely manner the production and operation status of enterprises and project investment intentions, and provide information for project construction. Timely and necessary credit support. It is necessary to conscientiously implement the incentive measures for financial institutions to support regional economic development, and encourage financial institutions to increase effective credit investment in key projects in our city. The third is the issue of demolition. The current stage coincides with the adjustment of national land policies. Because some people have too high expectations for compensation, the progress of land acquisition has been delayed and project construction has been affected. Therefore, it is hoped that all levels and departments must carry out the demolition work in detail, early and thoroughly, publicize the necessity and policies of land acquisition and demolition into the hearts of the people, cash in the resettlement fees that need to be compensated according to regulations into the hands of the people, and take action We should use emotion, understand with reason, and understand with benefit, so as to actively promote relocation and requisition according to law, effectively safeguard the legitimate rights and interests of the demolished people, and let the people consciously and voluntarily support key construction. Fourth, progress. Only when there is progress can there be image, efficiency and effectiveness. First, we must grasp the progress of the project. Key projects must first ensure progress requirements, achieve key construction, key support, and key guarantees. If the construction progress cannot meet the requirements, the key project management must be withdrawn; for preparatory key or general projects that progress quickly and all aspects of management are in place, It can be upgraded to a key project. Through the implementation of rolling management, timely adjustments, and methods of entering and exiting, we can ensure that the project can be launched as quickly as possible and the construction can be started as soon as possible. All counties (cities, districts) and municipal departments must strengthen the dispatch of key projects and strive to achieve a 10% increase in fixed asset investment in the first half of the year. Second, we must pay attention to the start and completion of construction. Starting from this month, the commencement, completion, and commissioning ceremonies of a number of projects will be held on the 28th of every month. For major projects, the main leaders of the four teams will cut the ribbons, and for the remaining projects, the leaders in charge will cut the ribbons to further reflect the effectiveness of the project work and create a faster pace of key construction. A strong atmosphere of advancement. Third, we must focus on quality and safety. It is necessary to adhere to the connection between project progress and investment progress, project quality and safety guarantee to promote each other, and focus on key projects and clean government projects together to achieve the "five synchronizations" of quality, progress, investment, safety, and clean government. Especially during the flood season, it is necessary to implement various safety precautions and strengthen the rectification of hidden dangers to ensure construction safety. Fifth, responsibility. The effectiveness of key construction depends to a large extent on our sense of responsibility. To what extent we can be responsible, to what extent difficulties can be solved, and to what extent key construction can be advanced. First, we must implement the responsibilities of project competition activities. Carrying out project competition activities is an effective carrier to promote the construction of key projects. All participating units must further clarify their goals and responsibilities and further increase their efforts in accordance with the task requirements issued by the municipal party committee and municipal government. In July, a half-year review of the investment promotion work of municipal departments will be carried out. Assessment and rewards. Second, we must implement coordination and scheduling responsibilities.

Key offices at all levels should establish a regular feedback mechanism for provincial and municipal key projects, collect and summarize the progress of key projects across the city and problems that need to be coordinated and resolved every two months, and have the leaders in charge of the municipal government coordinate and dispatch relevant issues. At the same time, with reference to the practices of provincial key offices, we will promptly study and formulate a points system for supervision of key projects, supervise the resolution of existing problems in key constructions, and include the results in the departmental project competition assessment scope. Third, we must implement hierarchical management responsibilities. Further divide the scope of responsibilities of each department at all levels to ensure that whoever manages the project is responsible for it, and whoever is responsible for solving it ensures that the leadership and scheduling of key construction are in place, the target responsibilities are in place, and the coordination and division of labor are in place. Fourth, we must implement the responsibility for effective services. Serving key construction means serving the overall situation and serving development. From leaders to departments, from agencies to grassroots, they must serve project generation and development, serve to solve project problems, and provide supporting services for the entire process of project establishment, approval, preparation, and production, etc., to provide a strong guarantee for the smooth advancement of key constructions. . ? (This article is the key points of the mayor’s speech at the city’s mid-year scheduling meeting for key construction projects on May 24. The title was added by the editor) ?

The article "Promote the construction of key projects through five key links" is written by Collected and organized, the copyright belongs to the author, please indicate the source when reprinting!