Based on the actual situation, let’s talk about what problems exist in safety production management at the construction site of our unit? How to solve them?

Safety production management system

1. A project manager responsibility system is implemented for construction sites and production safety. Establish and improve the safety organizational guarantee system, formulate and improve the safety production management system, and ensure that personnel are in place and responsibilities are assigned to everyone.

2. The construction site must have good construction environment and operating conditions, and all personnel entering the construction site must comply with construction site safety management regulations.

3. Construction workers must undergo safety production education before taking up the job, and should be professionally trained for special types of work and hold certificates before taking up the job.

4. Necessary reminders, warnings and other safety signs should be set up at the entrance to the construction site and dangerous work areas to avoid possible accidental injuries.

5. The construction site must be protected against fire, electricity, explosion and falling.

(1) Relevant national fire protection regulations must be complied with, and all fire protection facilities must be fully equipped and staffed by dedicated personnel for frequent inspection and regular replacement. Fire sources must be prohibited from entering key fire protection areas such as the storage of flammable materials in oil depots.

(2) The layout of power supply circuits and the use of electricity for construction must comply with regulations and regulations on safe electricity use, and should avoid obstructing normal operations and traffic.

(3) Before blasting operations, it must be reported to the local public security department for approval. The use and management of pyrotechnics products must comply with relevant national regulations. The transportation and storage of pyrotechnics products must be subject to the supervision, guidance and management of the local public security department.

(4) When working at heights, relevant operating procedures must be followed, necessary safety nets or guardrails must be set up, and safety belts and other protective equipment must be used depending on the specific situation.

6. The construction site must resolutely put an end to the "three violations" of illegal command, illegal operation, and violation of labor disciplines.

7. A complete maintenance and overhaul system for machinery and equipment should be established at the construction site to ensure the normal and safe operation of machinery and equipment.

8. It is necessary to strengthen construction safety management during the flood season, establish a flood prevention organization, formulate a complete and feasible emergency plan, organize a flood prevention and rescue team, and prepare necessary rescue materials. Adhere to the 24-hour duty and leadership system during the flood season.

9. If construction is carried out during the flood season, practical safety and flood prevention measures must be taken.

10. Borrow pits and spoil pits shall be processed in a timely manner and maintained as necessary in strict accordance with soil and water conservation design requirements to prevent soil erosion, landslides and other phenomena from occurring.

11. The safety leading group conducts regular and irregular inspections on the safety production of each construction branch, and will stop work for rectification if there are potential accident risks.

12. If a highway project under construction collapses or is scrapped due to negligence, causing casualties or major economic losses, the construction unit must promptly report to the relevant superior department in accordance with regulations.

13. The classification of highway engineering accidents, the reporting time limit and the contents of the declaration shall be implemented in accordance with the "Highway Engineering Quality Accident Grading and Reporting System" of the Ministry of Transport. For major quality and casualty accidents, the construction unit must manage the office and other administrative departments within one hour of the accident. And within 8 hours, the "Highway Engineering Major Accident Express" will be reported.

14. Before starting construction, safety production safeguard measures must be explained in detail in the overall construction organization design.

Civilized construction management system

1. Before the start of construction, the construction organization design should be done well, the overall floor plan should be drawn, and the layout should be reasonable, and the civilized responsibility areas should be clearly divided and clearly marked. At the same time, clear signboards are set up to indicate the project name, project overview, names of the construction unit, design unit, supervision unit, project manager and technical person in charge, start date and planned delivery date.

2. The project department must implement target management, put the construction organization, annual target plan, process handover process, quality targets and management system on the wall, and refine the targets on a quarterly and monthly basis.

3. All managers and construction workers at the construction site must wear badges (job badges) and dress uniformly in accordance with the relevant requirements of the project department.

4. The working roads at the construction site should be kept smooth and marked with road signs.

Machinery, tools and materials should be kept in good condition: machinery and equipment should be kept in good condition, clean and neatly parked; construction materials should be stacked in an orderly manner, stored in a regular and reasonable manner, and signs should be inserted.

5. The appearance of the construction site should be "three clean": the construction site is clean, the living environment is clean, and the construction products are beautiful and clean.

The trenches and ground within the site and construction area must be free of waste materials, garbage and oil pollution. The work must be completed, all materials used, and the ground cleared.

The interiors of office areas, work areas, warehouses and other places should be clean and orderly. Canteens, water supply and drainage, bathrooms and dormitories in living areas should meet fire protection, sanitation, ventilation, lighting and other requirements.

6. Signs should be set up in front of the main structures to indicate the name, construction person in charge, technical person in charge, and side station supervision.

7. The mixing site must be hardened, and materials must be stacked separately. Separation walls must be set up, and signs must be displayed to indicate the name and specifications. For cement, steel, etc., rainproof and moisture-proof facilities must be installed.

8. The main mechanical equipment used on site (excavators, graders, road rollers, bulldozers, etc.) are equipped with "equipment signs" to indicate the name of the equipment, manufacturer, date of installation, usage status, name of the operator, etc.

For the main mixing equipment used in the mixing station, a mix ratio control sign for mixture production and mixing should be set up in the control room.

9. At each construction point on the construction site, there should be a person in charge to direct the construction on site, and technical personnel should be on duty at the main parts. The on-site commanders and technicians should be familiar with the operating process requirements and quality standards.

10. The construction process should be reasonably arranged. Ancillary processes that may cause pollution to the road surface should be carried out in advance or corresponding protective measures should be taken. Construction or stacking of materials on the road surface is not allowed for processes that hinder the bonding between layers.

11. Construction access roads should be maintained daily to ensure "no dust on sunny days and no mud after rain", so as not to affect the normal life, production and traffic of local people.

12. The construction site must be aware of environmental protection. Waste materials generated during construction must not be discarded indiscriminately. They should be transported to designated locations for processing and storage as required. For construction materials that are prone to environmental pollution, effective measures should be taken during transportation, storage and use. measures to prevent or minimize contamination.

13. All construction operations carried out on site must be carried out according to the pre-construction construction operation arrangements, or in accordance with the corresponding relevant regulations, so as to be clear-cut, tense and orderly, and to prevent illegal operations and barbaric construction.

14. After the construction is completed, the temporary land occupation shall be restored, and the local roads occupied during the construction shall be restored.