The emergency plan must form a complete document system. Usually a complete enterprise-level emergency plan consists of four parts: general plan, procedural documents, instructions and records. Now I will bring you a response plan for heavy rain and flood control in 2022. I hope you like it!

Response plan for heavy rain and flood control in 2022 1

1. Purpose

Possible response In case of special natural disasters, we ensure the normality of urban sewage treatment and ensure the safety of company property and personnel.

2. Scope of application

This solution is suitable for the control process of sewage treatment during heavy rains and floods.

3. Responsibilities

In order to strengthen the leadership of flood prevention emergency work, a factory flood prevention emergency work leading group was established.

4. Flood season duty

According to the level of heavy rain and flood warnings, different administrative duty systems are arranged. Relevant departments arrange emergency repair personnel to make preparations for flood prevention and flood prevention. Relevant personnel will be held accountable for unexcused absences. The flood control emergency response leading group needs to do a good job in logistics support according to different duty arrangements.

To ensure smooth flow of information during flood prevention and control, relevant leaders and responsible persons must keep their mobile phones turned on 24 hours a day.

The specific duty arrangements during flood control and flood prevention are as follows:

During blue warning, duty will be carried out in accordance with the normal management system of the factory;

During yellow warning, rest days In addition to the normal personnel on duty at night, ensure that one person is on duty from the process laboratory department;

During the orange alert, in addition to the normal personnel on duty at rest days and nights, ensure that one person each is on duty for operation and maintenance, and the flood prevention and flood prevention teams are in place;

During a red alert, all members of the flood control emergency team are on duty, and flood control and flood prevention teams are in place.

5. Management regulations

5.1 Preparation stage

5.1.1 During the flood season, each water pump in the water pump room must be in good condition to keep the water level in the water collection well running at a low level. .

5.1.2 Before the heavy rain and flood seasons arrive, emergency repair personnel should inspect and maintain all emergency repair equipment to keep them in good and standby condition.

5.1.3 Before heavy rains or floods arrive, the department using the equipment should inspect the sewage treatment facilities under its jurisdiction to ensure that they are in good condition and have inspection records available.

5.1.4 The trend of weather changes should be understood in a timely manner through meteorological station forecasts, and flood prevention plans should be implemented in a timely manner in accordance with the requirements of superiors.

5.1.5 Before heavy rains or floods arrive, all departments should close doors and windows and check indoor hanging objects and fixed objects for safety hazards.

5.1.6 In accordance with the principle of hierarchical responsibility, reserve necessary flood prevention and disaster relief materials and arrange them reasonably. Reserve a certain amount of emergency materials in key areas for flood control and flood control to meet urgent needs.

5.1.7 Communication preparation, make full use of the internal telephone network in the factory and the public communication network to ensure that the flood control and flood control communication system is intact and smooth, and the command and dispatch instructions are transmitted in a timely manner.

5.2 Process Control

5.2.1 When the water volume is large and the water level in the water collection well is high during the flood season, all water pumps will be turned on.

5.2.2 The process laboratory department adjusts the process operation plan during the flood season based on the actual situation; adjusts the operating conditions in a timely manner during the flood season, and tries its best to ensure that the total effluent meets discharge standards when the water volume is large and the incoming water quality is light. Treat more sewage water to reduce external discharge.

5.2.3 During the flood season, the operation team will strengthen the inspection and monitoring of key equipment and parts such as the inlet and outlet pumps, the reaction pool inlet and outlet gates, and the power transformation and distribution stations, and keep records of the equipment operation status; discover faults and other Abnormal situations should be reported to the equipment department or the flood control leading group in a timely manner. Strengthen on-site inspections, especially on structures, to prevent objects falling from heights in windy weather.

5.2.4 The machine repair team shall arrange the inspection and maintenance work of key production and operation equipment and power substations before the flood season, and do a good job in rainproofing outdoor equipment. We also promptly checked the grounding conditions of the entire plant's machinery and equipment, and promptly rectified facilities with potential safety hazards.

5.2.5 According to the weather forecast, organize operators to inspect each equipment in advance to ensure it is intact, organize forces to dredge the rainwater pipelines in the factory area to ensure smooth flow, and issue early warning information in a timely and effective manner.

5.2.6 In the event of sudden rainfall, all posts should close doors and windows tightly to prevent rainwater from flowing in and affecting the operation of the equipment. The production operation team increased the number of water pumps and lowered the water level in the water collection well until it was at full capacity. When going out on patrol, you must work in pairs and be careful not to slip. The personnel on duty at the substation promptly check whether the lightning protection is functioning; the factory emergency repair team and vehicles are on call and ready to deal with emergencies.

5.2.7 If the instantaneous flow rate is too high and all structures are in overload operation, the superior department should be contacted immediately, and with the approval of the superior department, the primary sedimentation tank override valve should be opened to discharge sewage urgently to ensure The entire plant's structures and processes are running normally.

5.3 Emergency Situations

5.3.1 When the power is interrupted and the process cannot operate normally, the attendant should immediately report to the relevant leader and stay at the post to listen to the leader's instructions.

5.3.2 When heavy rains or floods cause property losses and casualties, personnel on duty should immediately report to relevant leaders and carry out relevant rescue work within their capabilities.

5.4 Late stage of flood control

5.4.1 After heavy rains and floods, personnel in laboratory positions should increase the frequency of incoming and outgoing water quality testing.

5.4.2 Repair damage to equipment and facilities caused by heavy rains and floods to ensure normal operation of each equipment;

6. Rescue and disaster relief

After a major danger occurs, The flood control emergency response leading group should quickly monitor and track the incident according to the nature of the incident, and contact relevant departments immediately.

The flood control emergency response leading group should immediately propose an emergency response plan according to the specific circumstances of the incident and provide it to the company or the relevant departments at the higher level or the local government for command and decision-making.

The flood control emergency response leading group should quickly mobilize the resources and strength of the department to provide technical support; organize flood control and thunderstorm and wind resistance personnel, and quickly carry out on-site disposal or rescue work.

When dealing with major dangers, there should be unified command, functional division of labor, everyone performing their duties, unity and cooperation, rapid response, and efficient handling to minimize losses.

7. Safety protection and medical rescue

The flood control emergency leading group should attach great importance to the safety of emergency personnel, mobilize and reserve necessary protective equipment, disinfectants, backup power supplies and rescue the wounded Necessary equipment, etc., ready for use at any time.

The entry and exit of rescue personnel from the scene will be decided by the flood control emergency response leadership group based on the situation. Before emergency personnel enter a threatened scene, they should take protective measures to ensure their own safety.

The flood control emergency response leading group should promptly issue notices in accordance with the instructions of the local government and superior leadership agencies to prevent people and livestock from entering dangerous areas.

8. Mobilization and participation of social forces

After a disaster occurs, the flood control emergency response leading group can, based on the nature and degree of harm of the event, report to the local government for approval, and conduct mobilization of key areas and key areas with the approval of the local government. Implement emergency control at various locations to prevent further expansion of the situation and its harm; when necessary, the local people's government can mobilize extensive social forces to actively participate in the handling of emergency emergencies.

9. Emergency end

When the disaster is effectively controlled, the flood control emergency leading group may declare the end of the emergency depending on the actual situation.

The materials, equipment, transportation tools, etc. requisitioned and transferred in accordance with the relevant provisions of the emergency response period shall be returned to their original locations in a timely manner after the emergency is over. After the emergency response work is completed, normal life, production, and work order should be restored in a timely manner, water-damaged infrastructure should be repaired, and the losses and impacts caused by emergencies should be minimized.

2022 Heavy Rain and Flood Control Response Plan 2

Preventing severe weather is the focus of school safety work. In order to effectively protect the lives of teachers and students in our school during heavy rain, hail, thunder and lightning, etc. Property safety, ensuring that thoughts, prevention plans are in place, and responsibilities are in place, and the losses that may be caused by heavy rain, hail, and thunder and lightning are reduced to a minimum. According to the requirements of Siqu Town Education Management Middle School and combined with the actual situation of our school, this document is specially formulated plan.

1. Scope of application of this plan

Heavy rain, hail, lightning and other abnormal weather

2. Work objectives

Pay attention to meteorology Forecast, before the arrival of heavy rain, hail, and lightning that affects our town is predicted, combined with the requirements of superiors, effective prevention plans are implemented to ensure the safety of personnel as the first goal, and to reduce the possible losses caused by the arrival of heavy rain, hail, and thunder to a minimum Minimum.

3. Organizational structure

Establish a leading group for defense against severe weather Leader:

Deputy leader:

Members:

4. Work arrangements and plans for preventing severe weather

(1) Preliminary inspection work

1. The person in charge of each school committee should regularly organize personnel to conduct inspections of the areas in charge The work is strictly and meticulously inspected, leaving no blind spots, and any problems are promptly repaired. Each class must carefully conduct class inspections every day, keep abreast of the living conditions of students' families, especially those living in remote areas, maintain contact with parents, and educate students to increase their awareness of disaster prevention.

2. The school office phone number, the phone number of school committee members, and the phone number of the class teacher must be smooth; the logistics office must comprehensively inspect the school’s electrical facilities and lines to ensure the safety of electricity use;

Academic Affairs Office It is necessary to organize professionals to inspect the doors, windows and hanging objects on the school teaching buildings, comprehensive buildings, etc., and eliminate hidden dangers in a timely manner; the Youth League Committee should clear the sewers, open and dark ditches, and flat roof sludge and debris throughout the school. Clean to ensure smooth drainage;

Each teacher should check the hanging objects on doors and windows in his or her dormitory, and eliminate any hidden dangers in a timely manner; Eliminate them; Teacher An Xiangyang should check the hanging objects on doors and windows in the cafeteria, and eliminate hidden dangers in a timely manner; the security personnel should inspect the hanging objects on doors and windows of the school gate and the guard room, and eliminate hidden dangers in a timely manner; the Political and Education Department should inspect the school walls and easy-to-use Conduct inspection and supervision on landslide areas.

3. Once each class encounters a dangerous situation, it must quickly evacuate to a safe area according to the escape drill route in an organized manner. Regularly carry out education on preventing severe weather for students in class to enhance everyone's awareness of prevention and self-rescue and self-protection abilities.

4. In order to prevent the coming of heavy rain, hail, thunder and lightning, all teachers are members of the disaster relief and rescue team against severe weather. They are on call at any time, ready for dispatch, and ready to deal with emergencies at any time.

(2) Duty and reporting system

Each duty room and patrol group must ensure that the personnel on duty are on duty 24 hours a day when heavy rain, hail, and thunder and lightning arrive. School leaders and personnel on duty must ensure smooth communication and keep communication tools open.

When a disaster occurs, school leaders, patrol personnel and personnel on duty should grasp the disaster situation in a timely manner, report the details to the superior department as soon as possible, and truthfully report all losses caused by the disaster.

(3) Logistics support work

Before the arrival of heavy rain, hail, thunder and lightning, prepare various items for storage. Spare rain gear, flashlights and other urgently needed items will be provided to provide logistical support. We also established contact information with Siqu Town Health Center, Safety Supervision Department and other units to ensure timely rescue.

5. Emergency Response Actions

1. Before the heavy rain, hail, and thunder and lightning come, the school security office and dormitory management began to implement a 24-hour duty system. The mobile phones of all members of the leadership team Turn on the machine 24 hours a day, and pay close attention to the direction of heavy rain, hail, and thunder. Inspect the doors, windows, awnings, facilities, wires and electrical equipment in the school, and facilities in dangerous areas such as the school's construction site to eliminate dangers. For facilities that may cause accidents, reinforce those that need to be reinforced and dismantle those that need to be dismantled.

2. Once heavy rain, hail, thunder and lightning come, all outdoor activities in the school will be stopped immediately.

3. When heavy rain, hail, or lightning strikes, organize the emergency evacuation of students in dangerous environments, pay attention to safety, move items outside the classroom into the classroom, and close all doors and windows of the school . Prevent wires from being scraped, causing short circuits that may cause fire or electric shock to people in the room. At the same time, it is necessary to prevent lightning strikes and other accidents.

4. After heavy rain, hail, thunder and lightning, no one in the school is allowed to go out to avoid accidents.

5. After heavy rain, hail, and thunder and lightning, the injured should be rescued in time. The school will fully devote itself to disaster relief and self-rescue work, and promptly report the disaster situation to the superior authority. Ensure normal teaching order in the school.

6. When heavy rain, hail, or lightning strikes, teachers should organize the emergency transfer of students in dangerous environments, pay attention to safety, and close all doors and windows of the classroom. Prevent wires from being scraped, causing short circuits that may cause fire or electric shock to people in the room. At the same time, we must prevent lightning strikes and other accidents from happening, and we must delay the end of get out of class when the time comes to ensure the safety of students.

Responding to severe weather is a comprehensive and arduous task. All relevant personnel must cooperate with each other, support each other, and strive to do their jobs well. Conduct an inspection of the work within the scope of responsibilities, be at the disposal of the severe weather prevention leading group, be on call, work together, and work together to do a good job in disaster relief.

2022 Heavy Rain and Flood Control Response Plan 3

1. Purpose

In order to establish and improve the early warning and emergency response system for public emergencies in property management, Ensure that the property management company can carry out flood prevention, rescue and disaster relief work in an efficient and orderly manner when encountering major floods. According to the requirements of the superior authorities and company leaders, in order to implement the rescue and disaster relief work and ensure a safe flood season this year, combined with the actual situation of our company, Develop this plan.

2. Guiding ideology

Conscientiously implement the spirit of the national, city and county flood control work conference, actively prevent flood disasters, and in order to build a harmonious society, implement "safety first, prevention first" The work policy of "taking priority, standing unremittingly, and going all out to rescue"; unified leadership, careful deployment, coordinated actions, hierarchical management, clear division of labor, scientific dispatch, further strengthen flood prevention responsibilities, effectively grasp all aspects of flood prevention work, and improve and implement various flood prevention measures. Prepare emergency plans, strengthen flood monitoring and early warning and forecasting, improve comprehensive flood and waterlogging prevention capabilities, and minimize the losses caused by floods to households and companies.

3. Main tasks

1. Implement the responsibility system. Earnestly implement various flood control responsibility systems with the project manager responsibility system as the main content, improve rules and regulations, clarify work responsibilities, and assign responsibilities to individuals.

2. Organize the formulation and implementation of emergency plans for flood control. Combined with the actual situation of each department and project, we can fully foresee possible problems and formulate emergency plans for flood control and flood control in a scientific and reasonable manner.

3. All departments and projects should put flood control materials in place so that flood control materials are sufficient, fixed and positioned, and managed by dedicated personnel.

4. Each project must be manned 24 hours a day, with leaders leading the shift, and implement the project manager responsibility system. Ensure smooth flow of information and properly respond to emergencies.

4. Leadership, command and emergency and disaster relief agencies

1. Establish a flood prevention working group

Commander:

Deputy commander:

Members:

2. Establish the company's flood control and flood control rescue commando team

Each project will form its own rescue commando team, and the captain will be the respective project manager (or order maintenance supervisor) .

5. Main Responsibilities

1. Responsibilities of the Flood Control Leading Group

(1) Quickly receive and convey various instructions from the flood control department and superior leaders on flood prevention and disaster relief item instructions.

(2) Deploy and direct the implementation of flood prevention and disaster relief operations. In the event of a dangerous situation, each rescue commando team will be under the command of the flood control leading group.

(3) Understand the basic situation of flood control work in each unit, understand the flood situation and report it in time.

(4) Perform other tasks assigned by superiors.

2. Responsibilities of the flood control and rescue commando team

(1) Receive and report flood control and disaster relief situations.

(2) Directly participate in flood prevention and disaster relief operations.

(3) Coordinate the resettlement and transfer of disaster-stricken households.

(4) Carry out other tasks assigned by the company’s flood prevention leading group.

6. Preliminary preparation work (each project shall be carried out according to the actual situation)

1. Check and dredge the ground and roof drains in advance, clean the septic tank and sewage well, and inspect the drainage main pipe Interface with the municipal pipe network to ensure smooth flow.

2. Check the sewage pumps to ensure that the sewage pumps in important locations (generator room, water pump room, power distribution room) can operate automatically.

3. Repair the backup generator and control circuits to ensure the safety and reliability of the emergency power supply.

4. Check the integrity of the flashlight and check the emergency lighting in the equipment room.

5. Check the community lightning protection system.

6. Check the exterior wall facade, notify residents, tidy up balconies, roof gardens, clear high-altitude shelves and awnings.

7. Prune dead branches of large trees in the community and branches seriously infested with insects.

8. Determine the evacuation routes and locations of emergency vehicles and personnel.

9. The project has a dedicated person who watches the local weather forecast regularly every day and reports important information to the project leader in a timely manner.

7. Key locations and equipment facilities of the project (each project shall be implemented based on actual conditions)

1. Carry out key monitoring of equipment rooms and equipment facilities below the level of the community ( basement, elevator shaft).

2. Office computers, monitoring hosts, gate equipment and other public electrical equipment.

8. Material preparation work (each project shall be carried out according to the actual situation)

1. Prepare spare water pumps, buckets, brooms, and towels.

2. Prepare necessary rain gear such as umbrellas, rain boots, and raincoats.

3. Emergency lighting such as flashlights and emergency lights.

4. Emergency communications such as: walkie-talkie.

5. Medical aid: tourniquet, anti-inflammatory drugs, iodine, and band-aid.

6. Rescue tools and materials such as safety belts, safety ropes, and shovels.

7. Prepare necessary funds.

8. Emergency support vehicles.

9. Emergency measures after floods occur

1. Emergency response to ordinary floods

(1) Strengthen communication with the county flood control department and strengthen flood monitoring and forecasting.

(2) Based on the actual situation of each unit of our company, put forward flood prevention requirements for each department and project, and conduct an organized evacuation of residents.

(3) Take measures to ensure smooth communication of the flood control system.

(4) Supervise various preparations for emergency rescue and disaster relief and inspect their implementation.

(5) Based on the flood control department’s judgment on flood situation trends, strengthen publicity and education on flood prevention to households, quell rumors, stabilize people’s hearts, and maintain normal production and living order.

2. Major flood emergency

(1) After receiving the major flood emergency notice from superior leaders, the flood prevention and relief commando teams of various projects involved in the flood quickly gathered and invested in flood prevention and rescue work.

(2) Organize efforts to complete the evacuation and resettlement of residents, and adopt favorable measures to ensure the basic living conditions of residents as much as possible.

(3) Organize relevant personnel to maintain public order and prevent anyone from taking the opportunity to cause trouble.

(4) Understand the disaster situation, do a good job in publicity, quell rumors and misinformation, and maintain social stability.

Specific emergency measures refer to the above process, combined with the actual situation of the project, and are implemented in accordance with the project's flood prevention emergency work plan.

10. Information summary and reporting

According to their respective division of responsibilities, the project flood control headquarters is responsible for collecting, organizing and researching the analysis and summary of possible flood control information in the jurisdiction, in accordance with early detection, early detection and reporting. According to the principle of reporting and early handling, the situation should be reported to the company's supervisor quickly.

For various flood control emergencies and various hidden dangers that may result, any individual has the right and obligation to report to the company office, and has the right to report the work errors and improper handling of relevant departments, and the submission of flood control information and The processing follows the following principles:

1. Important information is reported immediately. For information that is difficult to accurately grasp due to objective reasons, the basic situation should be reported in a timely manner, and the situation should be understood as soon as possible, and the details will be reported later.

2. General information shall be submitted to the person in charge of flood control of each project according to the management authority of each project.

3. The company's flood prevention working group should report immediately after receiving reports of major flood, industrial, insurance and disaster situations.

11. Others

When faced with major, urgent, unexpected events or situations involving the normal work, business, and living order of residents, cooperate with the customer service center of each project to verbally notify the customer at the nearest location , and do a good job of comforting and explaining customers.

2022 Heavy Rain and Flood Control Response Plan 4

Based on the actual situation of the hotel, this plan is specially formulated for the flood control work in the rainy season of 20__:

1. Flood Control Work Overall goal:

In accordance with the work policy of "safety first, constant preparedness, prevention first, and all-out rescue", we will effectively implement the flood prevention responsibility system and ensure that responsibilities, command, personnel, and materials are in place. In place, measures are in place, and rescue operations are timely to ensure the safety of hotel personnel and property, and all hotel work can proceed normally.

2. Working principles

The hotel’s flood prevention and rescue work follows the principles of “unified management, unified coordination, unified deployment, rapid response, scientific response, and graded implementation”.

3. Organizational Structure and Responsibilities

1. The hotel establishes a leading group for flood prevention and rescue work:

Team Leader:

Responsibilities: Responsible Comprehensive flood prevention and rescue work, responsible for issuing instructions for the activation of the hotel's flood prevention plan.

Deputy Team Leader

Responsibilities: Responsible for the implementation of the hotel’s plan, and responsible for the coordination and command of the hotel’s flood prevention organization.

Members:

Responsibilities: Cooperate with the deputy team leader to be responsible for the flood prevention and rescue work of various departments

There are disaster relief and rescue teams and material supply teams:

Disaster Relief and Rescue Team:

Captain: Zhang Xiaoqi

Vice Captain: Li Hongsheng

Members:

Material Supply Team

Captain:

Team members:

2. The hotel’s flood control telephone operates a twenty-four-hour duty system:

Duty telephone:

< p> Duty personnel work: executed according to the manager’s duty schedule for the month

4. Evacuation plan for disaster relief and rescue personnel in the hotel basement.

(1) During the flood season, all units will strengthen patrols on duty. Personnel on duty must stick to their posts, perform their duties, and maintain smooth communication 24 hours a day. Dangerous situations such as heavy rain or above, water in the basement, etc. must be reported immediately. Go to the hotel flood control and rescue headquarters and organize a disaster relief team to rescue and rescue people.

(2) The disaster relief and rescue team must be ready to participate in flood prevention and disaster relief work at any time.

(3) When water leakage occurs in the basement and tends to expand, the staff dormitory must be evacuated immediately. The evacuation passage is from the stairs at the entrance of the staff canteen to the second and third floors of the restaurant. The key to the evacuation passage is provided by the staff canteen. Director Xu and the manager on duty respectively hold that when initiating the hotel evacuation plan, the manager on duty should open the evacuation passage as soon as possible to ensure that employees can safely evacuate the disaster area.

(4) The manager on duty must strictly manage the keys to the safe evacuation passage and carefully hand over the keys.

(5) When evacuating employees, the principle of giving priority to women should be followed. The manager on duty ensures that the safe evacuation is carried out in an orderly manner and no chaos occurs; male employees are always ready to assist voluntarily while ensuring their personal safety. Rescue.

(6) The hotel should organize no less than one flood prevention drill

5. Other issues that should be paid attention to

(1) Ensure that employees’ living housing does not leak , no water will enter.

(2) Pay special attention to environmental sanitation and insist on daily fly killing and disinfection.

(3) Distribute medicines for heatstroke prevention and cooling, and arrange the time reasonably to ensure that there is no epidemic, food poisoning, or heatstroke.

(4) The hotel’s flood prevention emergency plan shall be supplemented and revised in a timely manner according to the requirements of superiors.

2022 Heavy Rain and Flood Prevention Response Plan 5

1. Organizational Structure and Responsibilities

The hotel has established a flood prevention and typhoon emergency headquarters, and various organizations in the headquarters will be responsible for the arrival of typhoons. Members must immediately prepare for flood and typhoon prevention and be on duty at the hotel. The organizational structure is as follows:

Commander-in-Chief:

Deputy Commander-in-Chief:

Member Units:

2. Typhoon Procedures

(1) Self-inspection preparation before typhoon

1. Front office: collect the banners at the gate, lanterns and other decorations at the gate and POP notice boards; place typhoon information in the lobby or elevator entrance Notice boards, and prepare typhoon reminder cards to be handed over to the housekeeping department for entry into the room; prepare umbrellas and rain gear. Every employee in the front office should understand the typhoon information, answer guest inquiries in a timely manner, prepare emergency lighting at the front desk, and the lobby deputy should be assigned a post In the lobby, do a good job in customer inquiries and pay attention to the situation at the door and lobby in a timely manner to ensure normal business order in the front office.

2. Housekeeping Department, Food and Beverage Department, and Finance Department: Check and close the doors and windows of each room, box, walkway, and corridor; prepare typhoon precautions for guests and notify the housekeeping department to add typhoon reminder cards to the room; Prepare emergency lighting;

3. Switchboard: Responsible for understanding the typhoon situation and promptly reporting to hotel leaders and relevant persons in charge of each department; prepare emergency lighting and intercoms, and check whether the backup power supply of the switchboard is operating normally, and Under the guidance of the department manager, provide emergency services for power outages and provide customer inquiry services.

4. Each department should prepare damaged linens one day in advance for emergency use.

5. The engineering department will conduct a comprehensive inspection of the hotel perimeter, platforms, neon lights, billboards, satellite receivers, doors and windows of various business departments and tenants, and reinforce them with wires, ropes, wooden stakes, etc. Unstable hanging objects should be temporarily removed. Check the underground electrical room and other important parts, reinforce the hotel door, and cut off circuits that may cause short circuits and fires. The pool should be filled with water to ensure the normal supply of water, electricity, and gas to the hotel, and prepare enough sandbags.

6. The general office is responsible for conveying typhoon information to all employees in each department and arranging for the heads of each department to stay in the store on duty.

7. The security department notifies the dormitory security guards to prepare for duty, and cooperates with the engineering department to check whether the sewers and gutters in key areas such as the hotel periphery and roof are unobstructed, and prepare lighting equipment, rain boots, raincoats, safety helmets, and flashlights. , emergency lights, etc.

(2) Re-inspection: The heads of the General Office, Engineering Department, and Security Department will re-examine the preparation status of each department in accordance with the above provisions.

(3) Emergency procedures should be initiated when the wind is strong:

1. The person in charge of the security department and engineering department should stay at the hotel to respond to emergencies at any time and ensure sufficient manpower and material resources. Good repair and remedial work.

2. If there is water seepage in guest rooms, private rooms, linens, wine, and food warehouses, the relevant departments should immediately move the items in the rooms to a safe place, and the engineering department will do a good job of plugging the leaks and draining the water.

3. Rainwater from the front door may flow back into the lobby. The security department and engineering department will pile sandbags at the door to prevent it from flowing in. The PA class is responsible for sending extra manpower to remove the accumulated water.

4. Rainwater from the back door may flow back into the employee elevator. The security department and engineering department will pile sandbags at the back door to prevent it from flowing in. The security guard at the back door is responsible for clearing the accumulated water. If rainwater has flowed back into the elevator, The engineering department should immediately control the elevator to floors above 1F and prohibit the elevator from running to -1F-2F.

5. When the wind is strong, the front and back doors should be reinforced with wooden plugs and wooden boards to prevent the glass doors from being blown away by the wind. During reinforcement, part of the glass doors should be left open to reduce the impact of wind on the glass doors. The front door glass was guarded by the porter and the foreman of the security department. The rear door glass is guarded by security guards at the rear door.

6. When the wind is very strong, the security guard and baggage clerk at the gate should pay attention to falling objects and guide the guests' vehicles to park in the underground garage. If necessary, they must wear safety helmets. The front office should arrange the front desk Put away table lamps, flower pots, etc. to prevent them from being blown over.

7. If there is water in the elevator, the engineering department should immediately start the drainage system to remove the accumulated water. In order to prevent the passenger elevator from being unable to operate if the wind is strong, the restaurant screen should be pushed to the elevator entrance to block it.

8. When encountering a power outage, the engineering department immediately contacts the property office to generate electricity and restore lighting. The Security Department maintains hotel safety and order during power outages. During a power outage, the restaurant's cashier will be guarded by the restaurant management staff, and the front desk's cashier will be guarded by the security department's front door post and 02 or 01. Assistant lobby managers, 01, and 02 should provide passenger elevator services, check whether any guests have been locked out of the elevator, and do a good job of comforting guests who are locked out of the elevator. Floor workers and managers of various departments should disperse to each floor and restaurant to provide good care to guests. Explain and comfort work.

9. When the gutter is blocked, the engineering department and the security department will send people to clear it. The clearing personnel should pay attention to their own safety and must wear safety helmets. If necessary, they should tie up safety ropes. The two of them worked together, one behind the other. Pay attention to whether there is leakage of electrical equipment on the roof equipment layer.

10. When the wind is extremely strong, the office should be responsible for notifying dormitory employees that they are prohibited from going out. Employees who live outside the store should arrange to stay in hotels. Office and department heads should dissuade off-duty employees from leaving the hotel. The office should Make arrangements for food and accommodation for stranded employees.

11. The switchboard is responsible for understanding the typhoon situation through TV and reporting the typhoon situation to the heads of each department in a timely manner. If there is any information about the closure of airports, highways, and bridges, it should be reported to the front office in a timely manner, and the front office should promptly report to the residents. Announcement to store guests.

12. When a typhoon is severe, the hotel’s executive general manager, engineering department manager, and security department manager should stay in the hotel to prepare for emergencies. Whether other department managers stay in the hotel should be based on the hotel’s arrangements. If they leave the hotel Approval should be submitted to the hotel executive.

(4) If there is any damage to the hotel after the typhoon, all departments should summarize and report the damage within two days.