Joke Collection Website - Bulletin headlines - Commitment letter for safe construction
Commitment letter for safe construction
With the continuous progress of society, there are more and more cases that need to use letters of guarantee. A letter of guarantee is generally a bill issued by an individual or unit to a superior organization or collective under the condition of guarantee. I believe many friends are very upset about writing letters of guarantee. The following is my safety construction commitment, for reference only. Welcome to reading.
Letter of Commitment on Safety Construction 1 In order to successfully complete the construction task of the sixth bid section (Fengtai No.8 Middle School) of the second batch of 20xx school building safety project, we hereby promise to guarantee as follows:
Article 1 The construction site shall be fenced neatly, and set up frontage and important parts according to the requirements of the construction unit, and ensure safety and beauty. The content of the construction slogan should be recognized by the construction unit. The site layout is reasonable and tidy, free of weeds, stagnant water and peculiar smell, and the roads in the site must be kept clear; All kinds of materials should be piled up neatly, and construction waste should be piled up at fixed points and removed in time. It is forbidden to pile up materials and garbage outside the construction site.
Article 2 Noise and lighting control should be considered in the layout and process arrangement of the construction site, and it should be strictly implemented in accordance with the relevant regulations of Beijing to avoid disturbing people. Special toilets must be set up on the construction site and managed by special personnel. Do not urinate at will. Life, production waste water and construction waste water are unqualified, and shall not be discharged into the school sewer; Don't destroy the trees and green spaces on campus; In the process of earthwork transportation, the procedures should be strictly followed, and it is not allowed to spill inside and outside the school. At the same time, measures should be taken to avoid dust.
Article 3 Foreign construction personnel must hold relevant certificates, and it is forbidden for non-construction personnel to spend the night at the construction site. It is forbidden to gather people at the construction site to play cards, drink and make trouble, and spread obscene articles. Construction personnel are prohibited from walking around in non-construction areas at will, and conflicts with students and faculty are prohibited.
Article 4 Construction vehicles should pay attention to campus traffic safety when entering and leaving Fengtai No.8 Middle School, and must drive slowly. Large machinery should negotiate with the construction unit in advance to avoid the campus traffic peak. When the road construction must be closed, the consent of the construction unit must be obtained, and obvious warning signs should be set at the intersection.
Article 5 Temporary electricity consumption on the construction site must conform to the Technical Specification for Safety of Temporary Electricity Consumption on the Construction Site. The fixed distribution box should be fenced with obvious safety warning signs. Non-professionals are forbidden to connect and disconnect wires to prevent electric shock accidents. It is forbidden to use electric appliances such as electric furnaces on site that hinder safety.
Article 6 Fire fighting equipment such as on-site fire hydrants shall be fully equipped, reasonably located, with obvious warning signs, and it is strictly prohibited to misappropriate them to ensure the smooth flow of fire fighting roads; Smoking is strictly prohibited in the construction site, and there must be a special person responsible for the management of toxic, flammable and explosive materials and hot work in construction.
Seventh site construction personnel must dress neatly, wearing badges, it is forbidden to enter the construction site; You must wear a safety helmet (red is the owner's special color) when entering the construction site, and you must fasten your seat belt when working high above the ground. Workers are forbidden to work under the influence of alcohol, climb scaffolding, and throw objects down when working high above the ground.
Article 8 The installation of scaffolding, foundation pit support, tower cranes, elevators and other large-scale machinery must have a construction plan approved by the superior safety department, and all kinds of construction machinery's certificates, inspection certificates and safety protection devices are complete, so as to prevent all construction safety accidents such as falling objects and earth collapse.
Article 9 The staff canteen must be clean and tidy, free of flies and rats, with complete licenses for operators, and conscientiously implement the relevant provisions on food hygiene and safety to prevent food poisoning for staff; The dormitory of construction personnel should be clean and tidy, and it is forbidden to pull wires at will to keep warm in winter to prevent workers from gas poisoning.
Article 10 The construction unit shall have management personnel specially responsible for on-site safe and civilized construction, who shall conduct regular inspections and make timely rectification when problems are found; Other issues related to safe and civilized construction put forward by the construction unit must be actively cooperated and seriously implemented.
If there is any violation of the above terms, our unit is willing to accept any punishment from the project department and bear all civil or criminal responsibilities arising therefrom.
xxx
Xx,xx,XX,XX
2 China Railway Construction Group Co., Ltd. Safety Construction Commitment Letter:
In order to strengthen the safety management of the construction site and strengthen the safety awareness, according to the relevant national safety laws, regulations, standards and procedures, the construction safety responsibility letter of this project is specially signed. The construction unit is required to consciously abide by and perform the relevant clauses in the responsibility book, and the construction unit shall take full responsibility for the safety accidents caused by violating the clauses in the responsibility book. My unit now solemnly promises to be responsible for the safety management within the scope of this project in accordance with the construction contract. The basic contents of the commitment are as follows:
I. Safety management
1. Before entering the site, our unit should carefully prepare the construction safety measures in the construction organization design submitted to the company and the supervision unit, and the measures should be targeted and operable.
2. In order to establish and improve the responsibility system for production safety, a leading group for production safety and fire prevention on the construction site must be established. The team leader shall be the project manager, and the members shall be the construction team leader, safety officer, construction team leader and subcontract project manager.
3. Strengthen safety education for all construction personnel. Regularly organize construction personnel to learn safety production management regulations, improve their ideological understanding, and always establish safety production awareness. Do a good job in pre-job training for workers and induction training for new workers. Let every worker know the safety technology and operating specifications of his post.
4, the project manager is the person directly responsible for the construction site, directly responsible for the safety production of the construction site.
5. Establish a safety production reporting system. The construction team shall establish a safety production reporting system, and specifically implement the project safety production report, sub-project safety production report, power safety production report, fire safety production report, safety production monthly report, etc.
6, the construction site must make safety warning signs and safety warning signs; Ensure smooth roads on site; Large parts are neatly stacked. The construction site must be equipped with sufficient safety fire fighting equipment according to regulations.
7. Construction personnel consciously abide by the company's various management regulations. If man-made unsafe acts endanger personal and property safety, they must be rectified unconditionally and immediately, accept the inspection and supervision of the functional departments of the company, and resolutely rectify the problems in the "rectification notice" issued by the relevant departments of the company.
8. When the management personnel of the project department of the company find that there are major unsafe factors, they have the right to ask for suspension of work and rectification at any time, and the construction party shall not continue to work illegally.
9. Security issues include but are not limited to the above. If there are any details, please refer to the national laws and regulations and the terms of this undertaking.
Second, the safety protection
1. "Four-way" protection: Stairs, elevator exits, reserved openings and access openings of projects under construction must be protected by temporary guardrails or cover plates.
2. "Five-edge" protection: double railings and safety nets with the height of 1 m must be set on the balcony side, floor side, floor side, runway side and the outside of the unloading platform.
3. Safe passage: Construction personnel and other personnel should set up special safe passages at the entrances and exits of construction or commuting.
4. Work at heights: For related work at heights, reliable internal and external scaffolding and protective nets must be designed and erected with reference to Technical Specification for Safety of Work at Heights in Building Construction, and feasible safety production protection measures should be formulated to ensure the safety of work.
5. Prevention of mechanical injury: Construction machinery should be operated in strict accordance with the construction specifications, equipped with safety devices, strengthened mechanical maintenance and maintenance to ensure the normal operation of machinery, and regular safety inspection of key transportation machinery. Relevant personnel must hold valid certificates and keep operation records.
6, enter the site must wear a helmet.
Third, use electricity safely.
On-site construction electricity should be arranged and arranged according to the requirements of Technical Specification for Safety of Temporary Electricity Use in Construction Sites.
1. Power distribution room: The power distribution room must be designed and installed in accordance with the temporary electricity consumption regulations, and at the same time, trained professional electricians are responsible for it, and the responsibility system is implemented to ensure daily maintenance and use.
2. On-site power facilities: the distribution box should meet the requirements of "three-level distribution and two-level protection", and the wire laying should be installed according to the requirements of "three-phase five-wire system".
3. Power consumption for machinery: The power consumption for machinery shall conform to the provisions of "one machine, one brake, one leakage and one box", and shall be handled by a special person.
4. Lighting for on-site construction: there should be sufficient lighting for night operation, safe low-voltage lighting should be used for construction in special environments such as damp, and special lighting lines should be protected against leakage.
Fourth, fire prevention.
1. Strictly control hot work: In order to prevent fire caused by open flame work, the hot work report should be performed and the open flame work should be strictly controlled.
2. Woodworking room fire prevention: Woodworking room is a key fire prevention area, so it is necessary to clean up sundries in time, prohibit fireworks, make eye-catching warnings and equip with fire-fighting equipment.
3. Fire prevention of material warehouse and reference room: establish fire prevention system, assign responsibility to people, and equip with sufficient fire fighting equipment.
4. Fire prevention in dormitory and office: it is forbidden to use electricity and fire at will, and the person responsible for fire prevention is clearly defined.
5. Do not use electrical appliances for heating or cooking, and do not burn sundries at will.
Five, vertical transportation machinery
1, tower crane installation must have torque limiter, limiter, hook and hoist must have safety devices, wire rope needs regular maintenance;
2, tower crane installation must be strictly accepted, and issued by the safety supervision department inspection rear can use.
3, tower crane command must be the specialist is responsible for, commanders and drivers must hold relevant certificates.
VI. Employment Management
We must know the situation of the workers we use, and we must not take in or use people with unknown identities and irregular identity documents, or use or take in people with unclear history and criminal acts.
Seven, for all kinds of production safety accidents, should be reported in a timely manner according to the relevant provisions. Report all kinds of safety accidents in time, assist in investigation and handling, and strive to reduce losses to a minimum. In case of major safety and fire accidents on the construction site, the performance bond of the construction unit shall be deducted, and the parties concerned shall be severely punished according to regulations; In case of fire or local fire, the construction unit will be fined 5000-50000 yuan, the project manager will be fined 1000- 10000 yuan, the safety officer will be fined 500-5000 yuan, and the party concerned will be fined 1000 yuan, and will be dismissed immediately.
Eight. This agreement shall come into force as of the date of signature.
xxx
Xx,xx,XX,XX
Safety construction commitment letter 3 1, and establish a safety guarantee system. Set up a safety leading group.
2, do a good job in site safety standardization, show certificates, put safety work in the first place, do
There must be measures, systems, organizations, requirements and unified command.
3, the installation personnel must abide by the relevant rules and regulations and public security management regulations. With other people
Live in harmony, pay attention to the environmental sanitation of the construction site and conduct civilized construction.
4, it is forbidden to drink construction, smoking and hot work in the no-fire area.
5. Safety protection articles must be worn when entering the workplace, and aerial workers must fasten their seat belts.
Belt.
6, should pay attention to the safe use of electricity in the construction process, wires must be in an orderly way, can't literally pull.
Spread it. Pull it. All mechanical and electrical equipment should be located in high-lying, moisture-proof and rain-proof places.
The power supply line of mechanical equipment should be well insulated and have perfect zero protection. Electric power
The leakage protection device of the brake box should be reliable.
7. Civilized and safe operation, without damaging the articles in Party A's clean service place. ..
8, should be timely to the cleaning service department and cleaning service department to collect the sewage and garbage, a.
Unified recovery and centralized treatment of sexual consumer goods and packaging materials of toxic and harmful substances,
No secondary pollution is generated.
9. In the process of cleaning and disinfecting the air conditioning system for your company, you are allowed to borrow existing tools.
Equipment, do not provide cleaning supplies and chemicals.
10, according to the working environment, provide employees with personal protective equipment that meets national standards and industry standards, train employees to use it correctly, and supervise its effective use. Violation of the above commitments, accept the corresponding administrative punishment, and bear the corresponding responsibilities. If any safety accident is caused by poor management of safety production, the company is willing to bear all the responsibilities.
Commitment guarantor:
20xx May 6th
Letter of Commitment for Safe Construction 4 Party A: XXX
Party b: XXX
According to "People's Republic of China (PRC) Law on Work Safety", "Regulations on Management of Work Safety in Construction Projects" and relevant laws and regulations, in order to ensure the construction safety of the office building affiliated to Citroen 4S Store, the safety management responsibilities are implemented and clarified. According to the relevant principles of the national contract law, Party A and Party B sign a safety responsibility letter, and the safety responsibilities of both parties are as follows:
I. Party A's responsibilities:
1. Publicize the national policies, laws and regulations on safety in production to Party B, and provide the rules, regulations and management measures for safety in production formulated by the unit;
2. Be responsible for supervising and managing Party B's safety production, checking Party B's implementation of the Safety Production Law and safety production rules and regulations, and correcting violations in time;
3. Be responsible for urging Party B to provide safety education to the personnel entering the site, and hold relevant certificates for special jobs;
4. Urge Party B to establish and improve the safety production guarantee system and provide full-time security personnel (XX) for the construction site.
5. Be responsible for the safety production and civilized construction inspection of Party B's living quarters and construction site, and supervise Party B to rectify hidden dangers and unsafe factors in time.
6. Be responsible for cooperating with relevant departments to investigate and handle Party B's safety accidents. ..
Two. Party B's responsibilities:
7. Earnestly implement the Law of People's Republic of China (PRC) Municipality on Work Safety and the Regulations on the Administration of Work Safety in Construction Projects, abide by Party A's rules and regulations, and carefully organize the construction to ensure work safety.
8. Party B shall establish and improve the safety production management organization, equipped with 1~2 full-time safety officers, and must ensure that there are safety officers on the construction site.
9. Party B must reach the control index of zero casualties in safety accidents.
10, Party B must strictly abide by the relevant regulations on fire safety to ensure that no fire accident occurs;
1 1. Party B must submit the business license, construction qualification certificate, certificate of legal representative, power of attorney of legal person, safety production license, organization, name of full-time safety officer, list of personnel with special types of work and copies of relevant documents to Party A for the record.
12. Party B shall establish a responsibility system for construction safety production and implement safety management on the construction site. Adhere to regular or irregular safety inspection, timely rectify and eliminate hidden dangers and unsafe factors, and make records for future reference.
13. Party B must prepare technical measures for construction safety, and make disclosure step by step and sign for future reference.
14. Party B must strictly implement safe and civilized construction, equip and distribute labor protection articles, and ensure that the operators use and wear them correctly.
15. Party B must educate the operators on safety knowledge and skills, and provide professional training for the operators of special types of work, and obtain the "Operation Certificate for Special Types of Work" before taking up the post.
16. Party B shall formulate an emergency rescue plan for production safety accidents according to the provisions of the Law on Work Safety.
17. In case of casualties, Party B must report to Party A and relevant departments in time, and actively rescue the wounded, protect the scene of the accident and do a good job in the aftermath.
18. All economic losses caused by safety accidents due to Party B's responsibility shall be borne by Party B..
Third, other agreements.
This Safety Responsibility Letter is made in duplicate, one for each party, with the same legal effect.
Party A:
Representative of Party A:
20XX x month XX day
Party B:
Representative of Party B:
20XX x month XX day
The Company strictly abides by the following commitments and guarantees:
1. Establish a safety guarantee system. Set up a safety leading group.
2, do a good job in on-site safety standardization, show certificates, put safety work in the first place, so that there are measures, systems, organizations, requirements and unified command.
3, the installation personnel must abide by the relevant rules and regulations and public security management regulations. Live in harmony with other personnel, pay attention to the environmental sanitation of the construction site and conduct civilized construction.
4, it is forbidden to drink construction, smoking and hot work in the no-fire area.
5. Safety protection articles must be worn when entering the workplace, and aerial workers must fasten their seat belts.
6, should pay attention to the safe use of electricity in the construction process, wires must be in an orderly way, shall not be laid at will. All mechanical and electrical equipment should be located in high-lying, moisture-proof and rain-proof places. The power supply line of mechanical equipment should be well insulated and have perfect zero protection. The leakage protection device of the motor switch box should be reliable.
7. Civilized and safe operation, without damaging the articles in Party A's clean service place. ..
8. Sewage, waste, disposable consumer goods and packaging materials of toxic and harmful substances generated during and after cleaning service shall be recycled in a timely and unified manner, and no secondary pollution shall be caused.
9. In the process of cleaning and disinfecting the air conditioning system for your company, you are allowed to borrow the existing tools and equipment, without providing cleaning supplies and chemicals.
10, according to the working environment, provide employees with personal protective equipment that meets national standards and industry standards, train employees to use it correctly, and supervise its effective use. Violation of the above commitments, accept the corresponding administrative punishment, and bear the corresponding responsibilities. If safety accidents are caused by poor management of safety production, the company is willing to take full responsibility.
Commitment guarantor:
20xx May 6th
Safety construction commitment letter 6 1, quality management is an important link to ensure and improve the engineering quality. Carry out the policy of "quality first, prevention first", strengthen the system of pre-control, inspection and acceptance of engineering quality, find problems in time, correct them in time, and meet the requirements of users.
2. The quality management department should firmly establish the idea that "quality is the life of an enterprise", adhere to prevention first, and carry out technical supervision, process control and quality inspection in every link from construction preparation to completion acceptance, so as to continuously improve the quality level of products.
1), the engineering department should monitor and audit the project quality planning and construction scheme, implement a three-level disclosure system, check the implementation process of the planning and scheme, pay special attention to scientific and technological progress and technological innovation, popularize and apply ten new technologies, and improve the project quality brand.
2) The production planning department should adhere to the requirement of "production must pay attention to quality", make clear the project quality requirements while implementing the production plan, arrange the progress reasonably without affecting the project quality, insist that the quality of the previous process does not meet the requirements and must not be delivered to the next process for construction, always create a good construction and production environment with strict management and reasonable construction progress, and provide excellent products that customers are satisfied with.
3) The materials supplied by the materials department shall conform to the material quality standards, strictly implement the management system of material procurement, acceptance and use, timely understand and master the specifications, performance and application requirements of various materials and new materials needed in the construction site, and provide qualified materials for engineering construction.
4), quality inspectors should hold relevant certificates, should choose a strong sense of responsibility, can adhere to the principle, with high technical level and practical experience. The direct leadership of the full-time quality personnel company shall be relatively fixed and shall not be adjusted at will. If it is really necessary to transfer due to work, it must be approved by the competent department of the company.
5) The number of full-time quality inspectors shall not be less than 5‰ of the total number of employees in the enterprise according to national regulations, and shall meet the requirements and capabilities of enterprise quality management.
6), the project department, team quality management, should fully rely on the masses, in the process of operation to elaborate construction, self-inspection at any time. The project department should have an independent project quality controller. Professional teams should have part-time quality inspectors for self-inspection. Part-time quality inspectors are experienced workers.
7), quality management network under the leadership of the company's general manager, by the chief engineer is responsible for, under the organization of the company's quality management department to carry out all the work. Each technical manager is responsible for quality work, and the technical director is responsible for quality work. The project department has a quality engineer and the team has a part-time quality engineer.
8), quality inspection personnel should regularly participate in the company's quality activities.
9) Total quality management is a scientific quality management method in modern industrial production. All employees of an enterprise should learn and participate in quality management. In order to accumulate experience and develop step by step, a quality management team should be established and activities should be carried out.
XXX
20XX x month XX day
- Related articles
- Slogan of the third grade entrance examination
- Epidemic prevention publicity handwritten newspaper
- How to establish enterprise culture
- What do you mean by trickling into the sea?
- What about Wolff controlled release fertilizer?
- The analysis background of Haidilao supply chain management?
- Summary of fitness activities
- Problems and common sense that should be paid attention to in seaside fishing?
- Kindergarten scientific research work plan
- Anti-child trafficking handwritten newspaper