Joke Collection Website - Bulletin headlines - Notice of rectification order

Notice of rectification order

Notice of rectification order (selected 5 articles)

Sometimes relevant units conduct inspections and find problems and require rectification and issue a notice. The notice generally refers to the notice. It is a document that circulates and publicizes relevant information in written form. The content of the notice generally contains the target of the notification, main matters, signee, date, etc. Below is the notice of rectification order that I compiled. You are welcome to check it out.

Notice of Rectification Order Part 1

After inspection, it was found that the following safety hazards existed at the construction site:

Reason: On April 6, 202x, you and The formwork support erection of the second floor of the x factory building has been carried out; the support height is 5.5 meters and is a high support system. After inspection by our company, we found that the high support erection was not consistent with the special construction plan. In addition, the high support formwork erected on site had great safety hazards. Our company has repeatedly urged your company’s construction site managers to intensify inspection and rectification efforts in response to the technical requirements related to the special plan for work release. So far, your company has not implemented the rectification measures against our company’s rectification requirements. Instead, it continues to allow workers to carry out high-support formwork erection. process.

Considering the importance of the problem, our company solemnly requests your company; after receiving the notice, your company must organize staff to carry out rework and reinforcement work according to relevant requirements, and then notify our company to organize staff to carry out preliminary work. Only after passing the inspection can the next step of construction process be entered.

If your company insists on continuing the construction without rectification, our company will not accept the high support formwork and notify the district safety supervision station personnel to intervene. Our company will not be responsible for any related losses and liabilities caused during this period.

Hope! The construction unit will make relevant rectifications after receiving the notice, and strengthen construction site management, personnel management and technical level learning, thereby improving the sense of responsibility of the management personnel!

Limited to 202x Complete the rectification before April 12, 2018, and submit an application for rectification review to our unit.

x Bureau

x month x day, 202x

Notice of Rectification Order 2

Xincheng Real Estate Development (Wuxi) Co., Ltd. Company:

I, ID number, signed the "Commercial Housing Sales Contract" with your company on I have purchased a unit-numbered house in Building B, Shangjin City, a real estate residential project developed by your company (hereinafter referred to as the "House"). I have paid your company the entire house price of RMB x yuan through the down payment and bank loan. , and paid off the loan in one lump sum in __ month of X year, releasing your company’s loan guarantee liability. Because your company failed to deliver a house that met the statutory and agreed conditions within the contract period, that is, before April 30, 20__, it constituted a serious breach of contract. We hereby issue this time-limited rectification notice to your company and explain the reasons as follows:

1. The house delivered by your company does not meet the legal conditions for house delivery

1. Your company refuses to issue a house certificate Proof of qualified acceptance - "Residential Project Quality Household Acceptance Record" and "Project Completion Acceptance Record Form", first of all, in accordance with Article 2 of the Wuxi Residential Project Quality Household Acceptance Management Measures (Trial), the term "residential project quality" as mentioned in these Measures Household acceptance refers to the inspection and acceptance of each residential project in accordance with the reviewed and qualified construction drawing design documents, national project quality acceptance specifications, Jiangsu Province's "Common Quality Control Standards for Residential Projects" and other relevant technical standards before the unit project is completed and accepted. Special acceptance of the public parts of household and unit projects. These measures shall apply to household-based quality inspection and acceptance of residential projects and their supervision and management within the administrative area of ??this city.

Article 5 The "Residential Project Quality Acceptance Record by Household" shall be handed over to the residents together with the "Residential Project Quality Guarantee" when the house is delivered.

However, your company failed to issue the "Household Quality Acceptance Record of Residential Projects".

Secondly, the "People's Republic of China Urban Real Estate Management Law (Amendment)" stipulates that the design and construction of real estate development projects must comply with relevant national standards and specifications. The real estate development project can only be delivered for use after it is completed and has passed the acceptance inspection.

Article 17 of the "Urban Real Estate Development and Operation Management Regulations" stipulates: "A real estate development project can be delivered for use only after it has been completed and has passed the acceptance inspection; if it has not been accepted or has failed the acceptance inspection, it shall not be delivered for use; after the real estate development project is completed, the real estate development project shall not be delivered for use." The development enterprise shall submit an application for completion acceptance to the real estate development authority of the local people's government at or above the county level where the project is located. The real estate development authority shall, within 30 days from the date of receipt of the application for completion acceptance, organize a review of matters involving public safety. The project quality supervision, planning, fire protection, civil air defense and other relevant departments or units shall conduct acceptance inspection." Order No. 78 of the People's Republic of China and the Ministry of Construction of the People's Republic of China and the Ministry of Construction on April 7, 20__, "Interim Measures for the Administration of the Completion Acceptance Filing of Housing Construction Projects and Municipal Infrastructure Projects"

Article 4 stipulates that "the construction unit shall Within 15 days from the date of completion acceptance of the project, in accordance with the provisions of these Measures, it shall be filed with the construction administrative department of the local people's government at or above the county level where the project is located." Article 6 stipulates that "the filing authority receives the completion acceptance filing submitted by the construction unit. After verifying that the documents are complete, the document acceptance should be signed on the project completion acceptance record form." According to this, "commercial housing has passed the acceptance inspection" means passing the completion acceptance and obtaining the "Project Completion Acceptance Registration Form". Now your company refuses to produce proof of acceptance of the above-mentioned house, indicating that the house does not meet the conditions for delivery and use, and the buyer has the right to refuse to accept the house.

2. The "Residential Quality Guarantee" issued by your company is incomplete and lacks the completion acceptance time, the quality warranty department's response time limit, the reasonable service life of the project, etc.

3. The "Residential Instructions" issued by your company is incomplete, and the residential performance certification level is missing. In particular, the residential energy-saving form content as a contract document lacks relevant data such as heat transfer coefficient and shading coefficient.

Article 8 of the contract stipulates: "The seller shall, before April 30, 20__, in accordance with the relevant regulations of the state and local people's government, meet the following 1st condition (that is, the commercial house passes the acceptance inspection ), and the commercial house that complies with the provisions of this contract will be delivered to the buyer for use."

Article 11 of the contract stipulates: "After the commercial house meets the conditions for delivery and use, the seller shall notify the buyer in writing to handle the delivery procedures. When the two parties conduct acceptance and handover, the seller shall present the supporting documents specified in Article 8 of this contract. If the selling documents are not provided or the supporting documents are incomplete, the buyer has the right to refuse the handover, and the seller shall be responsible for the resulting late delivery. bear".

According to the provisions of the above laws and regulations and the contract, the buyer believes that because your company failed to produce statutory and agreed supporting documents when delivering the house, the buyer has the right to refuse to take possession of the house. The liability for breach of contract resulting from late delivery shall be borne by your company.

(2) Problems in the house

1. Please see the attachment for the house inspection quality standards and house inspection results.

2. The air-conditioning unit cannot be installed

3. There is a lack of external window shading. According to the relevant content of the "Residential Instruction Manual" issued by your company, there are other forms of shading for external windows in residential energy-saving modes. According to Article 35 of the Energy Conservation Law of the People's Republic of China and the State, construction, design, construction and supervision units of construction projects shall comply with building energy conservation standards.

For construction projects that do not meet building energy conservation standards, the construction department shall not approve the start of construction; if construction has already started, it shall be ordered to stop construction and make corrections within a time limit; if it has been completed, it shall not be sold or used.

The construction authorities should strengthen supervision and inspection of the implementation of building energy-saving standards for construction projects under construction.

Article 36 When selling a house, a real estate development enterprise shall clearly disclose to the purchaser information such as the energy-saving measures and the warranty period of the insulation project of the house sold, in the house sales contract, quality guarantee letter and instruction manual. stated, and shall be responsible for its authenticity and accuracy.

According to the "Implementation Opinions on Further Strengthening the Energy Conservation of Civil Buildings in Our Province" Su Jianke [20__] No. 206

(19) Energy-saving design must fully consider the building, structure, and materials , equipment, environment and other factors to carry out system optimization and technology integration. The site selection, layout, orientation, spacing, floor height, etc. of the building should be reasonably planned and designed.

The application of energy-saving doors, windows and insulating glass should be actively promoted; the use of non-energy-saving glass curtain walls and glass windows is strictly prohibited; external sunshade measures must be taken for exterior windows and the use of bay windows is restricted; in addition to the above regulations, public buildings should also limit the transparency of roofs The area of ??the atrium, reasonable design of indoor space and height.

In summary, the buyer believes that your company's failure to deliver a house that has passed the acceptance inspection in compliance with the contract conditions and legal conditions before April 30, 20__ has constituted an overdue period. For this reason, the buyer has the right to refuse to accept the house that does not meet the delivery conditions and require your company to rectify the parts that do not meet the agreement within a time limit. Those that can be rectified must be rectified, such as external shading and other issues. The parts that cannot be rectified must be replaced by other methods (such as cash or other compensation). Starting from May 1, 20__, within a time limit of 60 days, your company will rectify the above problems. After the rectification is completed, your company will be required to issue a written notice of completion of the rectification to the buyer with your company's official seal. The resulting delay in delivery will be borne by the seller. Corresponding compensation will be charged according to legal regulations, contract stipulations and actual delivery date. Property fees are calculated from the actual delivery date. In accordance with the principles and spirit of legal fairness, justice and openness, it is hoped that the seller will take a positive attitude, excellent service awareness and professional quality, and fulfill its legal and contractual obligations and responsibilities to properly solve the problem; Party B reserves the right to use all legal means to safeguard the The right to own rights and interests; all losses caused by the seller's inaction, negative actions and illegal activities shall be borne by the seller.

Notice hereby!

Buyer: (Signature)

May X, 20__

Notice of Rectification Order Chapter 3

Supervision registration number: No.:

___Provincial___ Technology Co., Ltd., __Aluminum Products Co., Ltd.

The factory building constructed by your unit , the office project found the following major safety hazards after inspection:

1: No construction contract, supervision contract, safety supervision filing, quality supervision filing, construction permit related procedures,

2 : The erection of scaffolding does not meet the requirements. The factory building is erected with a single row of steel pipes. The connecting wall points are not placed as required by the "two steps and three spans". There are no sweeping poles. The frame does not exceed the working surface. The bamboo poles are not laid. The safety net is not stretched inside. Protection is not in place.

3: The gantry has not been inspected and is ordered to stop using it immediately.

4: The temporary power consumption is not set up according to the requirements of "three-phase five-wire system" three-level power distribution, two-level protection, one machine, one gate, one box and one leakage.

5: Temporary protection is not in place, and some workers do not wear safety helmets correctly. In accordance with relevant regulations such as the Construction Law of the People's Republic of China, the Work Safety Law of the People's Republic of China, the Regulations on Safety Management of Construction Projects, and the mandatory standards for project construction, your unit is hereby ordered to: □ Immediately Stop construction at the site. □Immediately stop the entire project for rectification. During this period, your unit should take effective measures to prevent safety accidents. After the rectification is completed, fill in the "Application Report for Resumption of Construction Project Construction" and report it to our station. Construction can only be resumed after receiving the "Notice of Resumption of Construction Project Construction" issued by our station. Notice is hereby given. Security inspector:

Xinghua City Construction Safety Inspection Station construction unit signee:

Telephone supervision unit signee:

Telephone construction unit signee:

p>

Notice of Rectification Order Part 4

Project Department:

After inspection, your department has the following safety hazards during the project construction process. Please wait until you receive this After notification, rectification should be made conscientiously and promptly:

1. Failure to establish a safety management organization or provide full-time safety production management personnel in accordance with regulations.

2. Project managers, safety officers and other safety production management personnel are not on site to supervise the construction of sub-items.

3. Project leaders, full-time safety production management personnel, operators or special operations personnel engage in relevant work without safety education and training or without passing the assessment.

4. Failure to prepare safety technical measures, temporary power supply plans for the construction site or special construction plans in the construction organization design, or the construction organization design has not been approved.

5. The technical requirements for safe construction were not explained in detail before construction or were not signed and confirmed by both parties.

□Special operations personnel are assigned to work without receiving special safety operation training and obtaining special operation qualification certificates in accordance with regulations.

6. Failure to provide employees with labor protection supplies that comply with national standards or industry standards.

7. Failure to set up obvious safety warning signs at dangerous parts of the construction site or failing to set up fire escapes, fire water sources, fire fighting facilities and fire extinguishing equipment at the construction site in accordance with relevant national regulations.

8. The construction site is not laid out in accordance with the company’s CI information requirements.

9. Temporary buildings at the construction site do not meet the requirements for safe use, such as bamboo sheds, asbestos tiles, and linoleum. □ No special protective measures have been taken for adjacent buildings, structures and underground pipelines that may be damaged due to construction.

10. No closed enclosure is implemented at the construction site of the construction project or the enclosure setting does not meet the specification requirements.

11. Failure to comply with relevant environmental protection laws and regulations results in dust, waste gas, waste water, solid waste, noise, vibration and construction lighting at the construction site causing harm and pollution to people and the environment.

12. The canteen and drinking water sanitation are poor; there are no first aid measures and first aid equipment.

13. Scaffolding materials that do not meet the requirements are used at the construction site.

14. The foundation of the floor-standing scaffolding poles is uneven and unreliable; there is a lack of bases and pads; there are no sweeping poles or drainage measures.

15. The number of ties between the scaffolding frame and the building structure is insufficient; the ties are not strong and irregular.

For the above hidden dangers, please complete the rectification and follow up investigation within _ days after receiving the notification.

Signing person:

Signing time:

Note: This form is made in triplicate, with one copy kept by the project department and two copies kept by the company

< p> Notice of Rectification Order Part 5

Mining Company:

On June 24, 20__, the town government issued an investigation to your company for prospecting and mining of quartz mines in the fourth group of Longtan Village. Conduct safety production inspections in the working area. After an on-site inspection, it was discovered that your company has many potential safety hazards. The safety hazards and rectification opinions are now notified as follows. Please make rectifications carefully.

1. Potential safety hazards

1. Safety knowledge is not properly publicized, and there are no warning slogans or signs in dangerous operating areas.

2. The safety production management system is imperfect. There is no public safety management system in the working area and no safety production records.

3. There are no safety warning signs or road signs on dangerous sections of roads in the mining area; the access road for workers to and from is steep and there are no safety protection measures.

4. The reinforcement measures for the mining cave entrance are incomplete and there is a risk of collapse; there are no safety protection measures in the temporary mining area and there is a risk of landslide.

5. The workers’ living area is close to the mining area and is located at the entrance of the cave or downstream of the ravine. There is a lack of safety precautions and there are potential safety hazards.

6. The workers’ dietary hygiene conditions are poor and the facilities are crude, posing potential food hygiene and safety hazards.

7. The fire prevention, flood prevention and safety production plans in the mining area are not perfect.

2. Opinions on rectification

1. Strengthen the publicity of safety production knowledge. Strengthen daily safety education for workers. Improve workers' self-safety awareness through publicity.

2. Make fixed warning signs and safety slogans at construction sites, sites, and roads to create an atmosphere for safety production publicity and education.

3. Reinforce holes and roads with potential safety hazards in accordance with technical standards. Drainage ditches must be built above the cave entrance to prevent landslides or collapses.

4. Improve workers’ accommodation conditions. Outside the mining operation area, choose a safe location and build worker sheds to meet the basic safe accommodation conditions for workers (2-month rectification period).

5. Improve workers’ dietary conditions and pay attention to dietary hygiene. Improve food poisoning prevention measures.

6. Establish safety production inspection log. Personnel in charge of production safety must insist on inspecting key areas, sites, and roads every day, and deal with hidden dangers in a timely manner if they are discovered.

7. Adhere to the system of leaders leading the team down the well; establish a registration system for workers entering and leaving the well.

8. Improve the safety system, identify full-time safety officers, clarify responsibilities, strengthen monitoring and inspection, and keep safe production records.

9. Improve fire prevention, flood prevention, production safety and other related plans.

10. Strengthen guard management and refuse irrelevant personnel from entering the mining operation area.

11. Complete relevant licensing procedures in a timely manner.

Your company should attach great importance to the above safety hazards and suggestions for rectification, study them carefully, formulate rectification measures as soon as possible, and rectify them item by item. Except for item 4, all rectification opinions must be rectified before April 24, and the rectification status must be reported to the town government.

Yingpan Town People’s Government

June 24, 20__