Joke Collection Website - Bulletin headlines - Several points for attention in KTV decoration construction
Several points for attention in KTV decoration construction
A, KTV decoration construction matters needing attention
1, to avoid the quality problems of KTV decoration and construction.
(1) ground elevation, generally in the bathroom, washroom, bathroom, etc. Mainly because the floor epithelial standard is too high; The waterproof layer is too thick; If the pressure felt concrete is too thick, the floor elevation should be carefully checked during construction, and the thickness of each construction should be strictly controlled to prevent it from exceeding the height.
(2) The flooding is too small or the local slope is reversed, the installation elevation of the floor drain is too high, the basic treatment is uneven, and there are pits, resulting in local water accumulation; Poor slope finding at the grass-roots level leads to too small or inverted slope.
(3) The ground is uneven, there is a small height, the thickness of bricks is inconsistent, there is no strict selection, or the brick surface is uneven, or there is no leveling and compaction when paving, or there are too many people, which is not conducive to maintenance. To solve this problem, we must first choose the right brick, and the substandard and irregular bricks must not be used.
(4) kicking and hollowing on the surface,
The main reasons for the hollowing of the surface layer are that the grass-roots are not clean, water is not permeable and early dehydration is caused. The master here was premature, and bonding mortar failed to reach the strength and was vibrated by external force, so that the block and the bonding layer were separated into empty drums. (5) When the black edge is less than the whole brick, mortar shall be used to repair it, instead of cutting half a block or small strips to form a black edge, which will affect the impression. The solution is to cut and lay bricks according to the rules.
2. Protection of finished KTV decoration products
(1) The completed project should be well protected, such as the door frame and door bolt should be nailed to protect the iron sheet to prevent knocking; Materials should be transported in narrow trucks to reduce collisions, and feet should be wrapped in rubber, plastic or cloth.
(2) When cutting bricks, the following boards should be padded.
(3) When working on the surface of the paved cylinder brick or cement brick, it is forbidden to throw heavy objects such as steel and iron pieces on the ground.
(3) It is forbidden to pollute the surface during the construction of paint slurry.
3. Building safety
(1) When using the portable electric cutting machine, the grounding wire and the leakage protection switch should be connected, and the trial operation should be carried out before use.
Only after passing the inspection can it be operated. (2) When working in the dark at night and expanding construction, 36V low-voltage running lights should be used for lighting.
(3) When the derrick and double cages are used for vertical transportation, the loading and unloading signals should be contacted, and the loading and unloading operations can be carried out only after the cages are balanced.
Second, the wall tile technology
1, process
Grass-roots treatment → hanging vertically, setting square, finding rules → pasting ash cake → plastering bottom mortar → elastic line framing → arranging bricks → soaking bricks → tiling bricks → jointing and wiping the joints of face bricks.
2, concrete wall operation method
(1) Basic treatment: wall leveling, steel brushing, watering and wetting.
(2) Hang vertically, set square, find rules and paste ash cakes: according to the specifications and sizes of ceramic tiles, make ash cakes at fixed points.
(3) Wipe the bottom mortar, brush a layer of 107 glue cement slurry, add 10% water, wipe the bottom mortar, and water it for maintenance the next day.
(4) The elastic lines are arranged in rows of bricks.
(5) soaking bricks, inlaying decorative tiles,
(6) Tile jointing and seam wiping
Third, the floor tile project
1, clean up the grassroots and find the law.
Clean up the base, and the surface mortar skin should be shoveled and swept clean.
Clean the mortar dirt on the concrete floor. 2. Sweep plain cement slurry together
On the cleaned base, thoroughly water it, sprinkle it with plain cement, and then sweep it evenly with a broom. The size of the pulp sweeping area should be determined according to the speed of priming and spreading ash, and it should be spread with sweeping.
3, around the room from +50cm below the horizontal line screed to the bottom gray epithelial elevation, paste the ash cake.
4, file, floor tile
Check the clearance size of the laid room, find a good square, and pop up the founder vertical control line on the leveling layer. When laying floor tiles, the dimensions should be arranged in the vertical and horizontal directions of the room, and the joint width should not be greater than 1cm. When the size is less than the multiple of the whole block, you can cut half a brick for the corner.
Fourth, the wooden sound-absorbing board wall construction technology
1, keel
During wall construction, the keel should be installed according to the design and construction drawing, and the keel should be leveled. The keel surface should be smooth and level, without corrosion and deformation. The arrangement size of the keel must adapt to the arrangement of the sound-absorbing board.
The wooden keel spacing should be less than 300mm, and the light steel keel spacing should be no more than 400 mm, and the installation of the keel should be perpendicular to the length direction of the sound-absorbing board. 2. Install sound-absorbing board
The sound-absorbing board follows the principle from left to right and from bottom to top; The gap is upward; When installed vertically, the notch is on the right side; If some solid wood sound-absorbing boards have requirements for patterns, each facade should be installed from small to large according to the pre-programmed numbers on the sound-absorbing boards.
3. Fixation of sound-absorbing board on keel
(1) Wooden keel is installed with nail. The sound-absorbing board is fixed on the keel at the tongue and groove with nail, and the nail must be 2/3? The above-mentioned embedded wooden keels shall be evenly distributed and have a certain density, and the number of nails connected with each sound-absorbing board and each keel shall not be less than 10? A.
(2) Light steel keel adopts special installation connectors.
Sound-absorbing plates are installed horizontally with notches facing upwards, and accessories are installed, and each sound-absorbing plate is connected in turn. The sound-absorbing board is vertically installed,
If the notch is on the right, install it from the left in the same way. At least 3mm should be left at the ends of the two sound-absorbing plates? Gap. Five, wallpaper construction technology
1, construction process
Construction procedure for pasting foamed wallpaper: draw vertical lines → cut paper → seal water → brush glue → paper wall → seam → catch up with bedding face → arrange paper seams → brush glue face.
2, wallpaper construction technology
(1) When drawing vertical lines, wait for the primer to dry before drawing vertical lines. The starting position should start from the internal corner of the wall and be smaller than the wallpaper 1 ~ 2 cm.
(2) Paper-cutting: This process is very important and directly affects the quality of wall pasting.
Stuffy water: Foamed plastic wallpaper can expand to about 1cm after absorbing water. If the dry wallpaper is put on the wall immediately after painting, there will be many wrinkles and it will not survive. So first soak the foamed wallpaper in the sink, shake off the excess water after taking it out of the sink, and let it stand for 20 minutes to fully expand the wallpaper.
(4) Glue-brushing: Glue-brushing on the back of the wall and wallpaper at the same time.
(5) Sticking: It is the most important process in the wallpaper pasting project, which directly determines the quality of the wall.
3, local repair method (after waiting for paper wall glue dry)
(1) paper edge "opening": due to uneven gluing or premature drying of glue solution, it can be re-glued and compacted after gluing.
(2) There are bubbles on the paper: We can use our paper cutter to cut the bubbles, squeeze out gas or excess glue, and then flatten and compact them. (3) Stubble exposed at the joint: If stubble exposed at the joint is caused by drying shrinkage, latex paint can be used to find color.
(4) Wrinkles appear on the paper surface: the paper web can be lifted and pasted again before the adhesive is dry.
(5) Wallpaper damaged by collision: lines and colors can be hollowed out and filled, and patterns, patterns and gaps should be matched.
Six, interior wall latex paint
1, construction process
Paint construction should be carried out after the installation of indoor doors, windows and lamps. Make the ceiling first, then the wall, and finally the color separation line.
2, the construction method
( 1)? Basic treatment, remove dust and other attachments on the surface of the basic unit.
(2) Priming (except wood and painted surfaces). If the wall is loose and absorbent, glue can be evenly applied to the cleaned base once or twice. Don't miss painting, and don't brush too much to cause flowing or accumulation.
(3) sealing the wood base, and evenly coating the alkyd varnish thinner on the wood base with paint.
(4) Blow putty,
Dry the primer thoroughly, first fill in the obvious unevenness with putty, and then smooth the sand. The finished putty should be stirred evenly before use, and water can be added to adjust when the putty is thick; The smoothness of the base is not enough, and the potholes or wooden base need to be filled with putty.
(5) Brush the surface coating, dilute it with water according to the proportion required in the product manual and stir it evenly.
Seven, paint engineering
1, common paint construction
(1) Before construction, the paint surface shall be polished and the nail head shall not be exposed.
(2) When painting various surfaces, the grade shall comply with the design requirements, according to JGJ73-9 1? Implement the main working procedures specified in Code for Construction and Acceptance of Building Decoration Engineering.
(3) Mixed-color paint engineering should be free of spots, sagging and wrinkled skin, and the surface color should be consistent and smooth.
(4) Paint works shall have clear wood grain, basically the same color, no brush lines, no brush leakage, peeling and spots.
(5) When the door leaf is painted, the top surface of the upper rail and the bottom surface of the lower rail shall not leak paint.
2, construction technology (similar steps as above)
Eight,? Construction of light steel keel ceiling
1, keel installation
According to the requirements of ceiling design elevation, the elastic line should be clearly defined on the surrounding walls, and the allowable deviation of elevation is 25? ㎜。
2, cover panel construction
This project adopts gypsum board and gypsum board ceiling cover panel, which is connected by nails.
Nailed cover panels generally have decorative layers on their surfaces, so when installing, apart from smooth surfaces, gaps should be left between plates, and a small corner should be removed at the edges of plates to facilitate joint filling and putty hanging.
Nine,? Construction technology of joinery decoration
1, joinery decoration construction
Mainly when selecting materials, not counting the cost. Do you want to choose AA? A-class products should be painted before installation. Wipe the surface of wooden ornaments with a clean cloth dipped in water, check whether the color difference and grain are uniform, and understand the color, material properties, water absorption, oil permeability and the situation before painting.
The painting was done in the factory.
2, wooden decorative wall smallpox construction
Make sample drawings according to the drawings and site dimensions, and deliver them for confirmation.
The ceiling on the wall should be arranged and drilled and buried in a solid position.
Wood blocks shall be treated with anticorrosion and fire prevention as required.
The meticulous and important part is completed by a carefully selected professional veneer team.
Select and make decorative panels, and pay attention to the fact that the colors and patterns of panels in the same construction area are basically close.
Ten, wooden floor construction technology
1, the basic process of wood floor decoration
Grassroots cleaning → painting primer → elastic line and leveling → drilling and installing embedded parts → installing rough floor, leveling and planing → nailing floor, leveling and planing → nailing skirting board → planing and polishing → painting and waxing.
2, strengthen the wooden floor construction technology
Clean the grass-roots level → spread plastic film mats → stick composite floors → install skirting boards.
3. The construction technology of three-dimensional paving method is as follows
Grassroots cleaning → elastic thread → drilling and installing embedded parts → floor moistureproof and waterproof treatment → installing wooden keel → padding insulation layer → elastic thread, nail rough floor → leveling and planing → nail wood floor, leveling and planing → installing skirting board → planing → painting and waxing.
XI。 Stair engineering
1, according to the horizontal line, center line (reticle) and pre-arranged numbers, lay standard lines on the left and right sides of the corridor (road closure), and then lay stay wires.
2, before the shop is stuck, the grass-roots level should be watered wet, and then brush plain cement slurry (water cement ratio is about 0.5). Cement slurry should be spread with the brush, and there should be no air drying.
3. The paving sequence should be hung line by line from the middle to two places, and the gap width should not be greater than 1mm when the design is not required.
4, 24 hours after the completion of the shop is stuck, check the brick surface without cracks, empty drum, with dilute cement (color and floor tile harmony) to fill the seam brush, and then wipe with a dry cloth until there is no residual ash, stains, paved floor tile pedestrians and stacked items are prohibited within two days.
5. Brush the floor tile with water before sticking the skirting board, and cut the external angle interface into a 45-degree angle. And the grass-roots level will be watered evenly, and the plain cement slurry will be brushed and rubbed.
Twelve, bathroom wall engineering
1, brick selection
Generally, several specifications are selected according to the gap of 1mm, and the materials are planned in batches according to the wall column area and room size after selection. Brick selection requires founder, flatness and integrity of edges and corners, and the color of tiles of the same specification should be consistent.
2, basic treatment and wipe the base ash
Thirteen, electrical installation construction technology
1, pipeline
(1) Laying steel pipes, and the inner and outer walls of steel pipes shall be treated with anti-corrosion; The steel pipe shall be free of folds and cracks, iron filings and burrs, and the cut-off opening shall be smooth and the nozzle shall be smooth.
(2) Laying a metal hose, and the wire protection tube between the steel pipe and the electrical equipment and appliances adopts a metal hose or a flexible metal wire protection tube; The length of the metal hose should not be greater than 2m; Metal hoses should be laid in dry places that are not easily damaged by machinery, and should not be directly buried underground or in concrete.
Metal hose should not be untwisted and loose, and there should be no joint in the middle. When connecting with equipment and appliances, special joints should be adopted, and the joints should be sealed and reliable; The joints of liquid-proof metal hoses shall be well sealed.
Step 2 connect wires
Pipe threading, pipe threading should be carried out after plastering, painting and ground engineering of buildings; Before threading, the water and sundries in the conductor protection tube should be removed; Different circuits, different voltage levels and AC and DC lines shall not be worn in the same tube; Unless there are special provisions in the following types or designs; The wires of the same AC circuit should be threaded in the same steel pipe.
There should be no joints and nodules on the wires in the pipe, and the joints should be located outside the junction box; The total area of wires in the pipe, including insulation layer, should not be greater than 40% of the empty area in the pipe; When the conductor penetrates into the steel pipe, a conductor protector should be installed at the nozzle to protect the conductor; In the vertical nozzle that does not enter the junction box, the nozzle should be sealed after threading.
3, lamps and lanterns
Lamps and accessories should be complete, without mechanical damage, deformation, paint stripping, lampshade cracking and other defects; In the substation, lamps and lanterns should not be installed directly above high and low voltage distribution equipment and buses; Outdoor installation of lamps and lanterns, the height from the ground should not be less than 3m? ; When installed on the wall, the height from the south is not less than 2.5m For the lamp holder with switch, the switch handle should not have exposed metal parts.
4、? Socket, switch
Single-phase two-hole socket, facing the right hole phase line of the socket; The left hole or the lower hole is connected with the zero line. Single-phase three hole socket, the right hole facing the socket is connected with the phase line; The left hole is connected to the zero line.
The grounding wire or zero wire of single-phase three-hole, three-phase four-hole and three-phase five-hole sockets should be connected to the upper hole. The grounding terminal of the socket should not be directly connected with the neutral terminal.
For hidden sockets, special boxes should be used. There should be no gap around the special box, and the cover plate should be straight and close to the wall.
The above is the relevant introduction of this article. I believe you will have a simple understanding of this after reading it. If necessary, follow the 1 home network for more information.
3, local repair method (after waiting for paper wall glue dry)
(1) paper edge "opening": due to uneven gluing or premature drying of glue solution, it can be re-glued and compacted after gluing.
(2) There are bubbles on the paper: We can use our paper cutter to cut the bubbles, squeeze out gas or excess glue, and then flatten and compact them. (3) Stubble exposed at the joint: If stubble exposed at the joint is caused by drying shrinkage, latex paint can be used to find color.
(4) Wrinkles appear on the paper surface: the paper web can be lifted and pasted again before the adhesive is dry.
(5) Wallpaper damaged by collision: lines and colors can be hollowed out and filled, and patterns, patterns and gaps should be matched.
Six, interior wall latex paint
1, construction process
Paint construction should be carried out after the installation of indoor doors, windows and lamps. Make the ceiling first, then the wall, and finally the color separation line.
2, the construction method
( 1)? Basic treatment, remove dust and other attachments on the surface of the basic unit.
(2) Priming (except wood and painted surfaces). If the wall is loose and absorbent, glue can be evenly applied to the cleaned base once or twice. Don't miss painting, and don't brush too much to cause flowing or accumulation.
(3) sealing the wood base, and evenly coating the alkyd varnish thinner on the wood base with paint.
(4) Blow putty,
Dry the primer thoroughly, first fill in the obvious unevenness with putty, and then smooth the sand. The finished putty should be stirred evenly before use, and water can be added to adjust when the putty is thick; The smoothness of the base is not enough, and the potholes or wooden base need to be filled with putty.
(5) Brush the surface coating, dilute it with water according to the proportion required in the product manual and stir it evenly.
Seven, paint engineering
1, common paint construction
(1) Before construction, the paint surface shall be polished and the nail head shall not be exposed.
(2) When painting various surfaces, the grade shall comply with the design requirements, according to JGJ73-9 1? Implement the main working procedures specified in Code for Construction and Acceptance of Building Decoration Engineering.
(3) Mixed-color paint engineering should be free of spots, sagging and wrinkled skin, and the surface color should be consistent and smooth.
(4) Paint works shall have clear wood grain, basically the same color, no brush lines, no brush leakage, peeling and spots.
(5) When the door leaf is painted, the top surface of the upper rail and the bottom surface of the lower rail shall not leak paint.
2, construction technology (similar steps as above)
Eight,? Construction of light steel keel ceiling
1, keel installation
According to the requirements of ceiling design elevation, the elastic line should be clearly defined on the surrounding walls, and the allowable deviation of elevation is 25? ㎜。
2, cover panel construction
This project adopts gypsum board and gypsum board ceiling cover panel, which is connected by nails.
Nailed cover panels generally have decorative layers on their surfaces, so when installing, apart from smooth surfaces, gaps should be left between plates, and a small corner should be removed at the edges of plates to facilitate joint filling and putty hanging.
Nine,? Construction technology of joinery decoration
1, joinery decoration construction
Mainly when selecting materials, not counting the cost. Do you want to choose AA? A-class products should be painted before installation. Wipe the surface of wooden ornaments with a clean cloth dipped in water, check whether the color difference and grain are uniform, and understand the color, material properties, water absorption, oil permeability and the situation before painting.
The painting was done in the factory.
2, wooden decorative wall smallpox construction
Make sample drawings according to the drawings and site dimensions, and deliver them for confirmation.
The ceiling on the wall should be arranged and drilled and buried in a solid position.
Wood blocks shall be treated with anticorrosion and fire prevention as required.
The meticulous and important part is completed by a carefully selected professional veneer team.
Select and make decorative panels, and pay attention to the fact that the colors and patterns of panels in the same construction area are basically close.
Ten, wooden floor construction technology
1, the basic process of wood floor decoration
Grassroots cleaning → painting primer → elastic line and leveling → drilling and installing embedded parts → installing rough floor, leveling and planing → nailing floor, leveling and planing → nailing skirting board → planing and polishing → painting and waxing.
2, strengthen the wooden floor construction technology
Clean the grass-roots level → spread plastic film mats → stick composite floors → install skirting boards.
3. The construction technology of three-dimensional paving method is as follows
Grassroots cleaning → elastic thread → drilling and installing embedded parts → floor moistureproof and waterproof treatment → installing wooden keel → padding insulation layer → elastic thread, nail rough floor → leveling and planing → nail wood floor, leveling and planing → installing skirting board → planing → painting and waxing.
XI。 Stair engineering
1, according to the horizontal line, center line (reticle) and pre-arranged numbers, lay standard lines on the left and right sides of the corridor (road closure), and then lay stay wires.
2, before the shop is stuck, the grass-roots level should be watered wet, and then brush plain cement slurry (water cement ratio is about 0.5). Cement slurry should be spread with the brush, and there should be no air drying.
3. The paving sequence should be hung line by line from the middle to two places, and the gap width should not be greater than 1mm when the design is not required.
4, 24 hours after the completion of the shop is stuck, check the brick surface without cracks, empty drum, with dilute cement (color and floor tile harmony) to fill the seam brush, and then wipe with a dry cloth until there is no residual ash, stains, paved floor tile pedestrians and stacked items are prohibited within two days.
5. Brush the floor tile with water before sticking the skirting board, and cut the external angle interface into a 45-degree angle. And the grass-roots level will be watered evenly, and the plain cement slurry will be brushed and rubbed.
Twelve, bathroom wall engineering
1, brick selection
Generally, several specifications are selected according to the gap of 1mm, and the materials are planned in batches according to the wall column area and room size after selection. Brick selection requires founder, flatness and integrity of edges and corners, and the color of tiles of the same specification should be consistent.
2, basic treatment and wipe the base ash
Thirteen, electrical installation construction technology
1, pipeline
(1) Laying steel pipes, and the inner and outer walls of steel pipes shall be treated with anti-corrosion; The steel pipe shall be free of folds and cracks, iron filings and burrs, and the cut-off opening shall be smooth and the nozzle shall be smooth.
(2) Laying a metal hose, and the wire protection tube between the steel pipe and the electrical equipment and appliances adopts a metal hose or a flexible metal wire protection tube; The length of the metal hose should not be greater than 2m; Metal hoses should be laid in dry places that are not easily damaged by machinery, and should not be directly buried underground or in concrete.
Metal hose should not be untwisted and loose, and there should be no joint in the middle. When connecting with equipment and appliances, special joints should be adopted, and the joints should be sealed and reliable; The joints of liquid-proof metal hoses shall be well sealed.
Step 2 connect wires
Pipe threading, pipe threading should be carried out after plastering, painting and ground engineering of buildings; Before threading, the water and sundries in the conductor protection tube should be removed; Different circuits, different voltage levels and AC and DC lines shall not be worn in the same tube; Unless there are special provisions in the following types or designs; The wires of the same AC circuit should be threaded in the same steel pipe.
There should be no joints and nodules on the wires in the pipe, and the joints should be located outside the junction box; The total area of wires in the pipe, including insulation layer, should not be greater than 40% of the empty area in the pipe; When the conductor penetrates into the steel pipe, a conductor protector should be installed at the nozzle to protect the conductor; In the vertical nozzle that does not enter the junction box, the nozzle should be sealed after threading.
3, lamps and lanterns
Lamps and accessories should be complete, without mechanical damage, deformation, paint stripping, lampshade cracking and other defects; In the substation, lamps and lanterns should not be installed directly above high and low voltage distribution equipment and buses; Outdoor installation of lamps and lanterns, the height from the ground should not be less than 3m? ; When installed on the wall, the height from the south is not less than 2.5m For the lamp holder with switch, the switch handle should not have exposed metal parts.
4、? Socket, switch
Single-phase two-hole socket, facing the right hole phase line of the socket; The left hole or the lower hole is connected with the zero line. Single-phase three hole socket, the right hole facing the socket is connected with the phase line; The left hole is connected to the zero line.
The grounding wire or zero wire of single-phase three-hole, three-phase four-hole and three-phase five-hole sockets should be connected to the upper hole. The grounding terminal of the socket should not be directly connected with the neutral terminal.
For hidden sockets, special boxes should be used. There should be no gap around the special box, and the cover plate should be straight and close to the wall.
The above is the relevant introduction of this article. I believe you will have a simple understanding of this after reading it. If necessary, follow the 1 home network for more information.
- Previous article:Dalian BBQ Restaurant Popular Ranking
- Next article:How to write 1000 words every day?
- Related articles
- Research on the current situation of green hotels at home and abroad
- Details of St. Paul's Church (London Church, UK)
- Can plums be put in the refrigerator?
- 192 1: Our task is about to begin.
- Nouns followed by preposition to
- How about Shishi Tianfu Middle School?
- Does Ningxia Yellow River Rural Commercial Bank have a deposit insurance logo?
- Come on Wuhan, come on Anshan, I am a soldier and I am on the front line, I will not fade away when I retire!
- Warm reminder text messages for hot weather
- How to classify the products of China’s textile industry? What kinds are there?