Joke Collection Website - Bulletin headlines - The next work plan of the Water Conservancy Bureau is 3
The next work plan of the Water Conservancy Bureau is 3
Next Work Plan of Water Conservancy Bureau 1 Water Conservancy Work in Year I and xxxx
In xxxx, under the care and guidance of X Municipal Bureau, our bureau actively practiced the concept of water control in the new period, promoted urban and rural water conservancy construction as a whole, solidly implemented various flood control measures, focused on strengthening water conservancy service management, and completed various tasks in time, which strongly supported and guaranteed the stable economic and social development of the city. According to the notification requirements, the work summary and work plan of xxxx are briefly reported as follows.
First, be brave in taking responsibility, be good at doing things, and make new breakthroughs in our annual work.
(1) The construction of key projects was accelerated in an all-round way. Intensify the efforts to attack the No.1 proposal of the Municipal People's Congress, promote it with high quality and strictly implement it. The construction of the project has achieved remarkable results, providing a solid water conservancy support for six stability and six guarantees. Completion of Shangjiuweigang Pumping Station and its supporting river course project. The pumping station has played an important role in the flood season, and the landscape greening project has been fully completed. Implementation of urban storage and drainage capacity improvement project, the new eight-Wei port gate station passed the completion acceptance. The communication project between Nanhe River and Xihe River in Taoyuan Road of River Management Office was implemented, and X box culvert was built. At present, the project has been completed. Promote the construction of water system communication project in xx town project area and xx area, a key county for small and medium-sized river regulation, with a total of XX kilometers of river regulation, all of which have passed the completion acceptance. Implementation of rural river silt dredging renovation project, completed the river dredging xxx kilometers.
(2) A comprehensive victory was achieved in flood control and drought relief. The first is to strengthen the implementation of flood control responsibility. Strictly implement the chief executive responsibility system for flood control work, and clarify the flood control responsibilities and responsible persons of all units. Comprehensively and carefully investigate the hidden dangers of flood control, compile the list of responsibilities, formulate flood control plans and measures, and eliminate risks. Strictly implement the xx-hour patrol system, and the city dispatched xx rescue teams and x.x million patrol personnel to ensure the safety of the dike. The second is to increase the repair of water conservancy facilities. Organize and implement the emergency project of flood control and emergency rescue at xx of Yangtze River dike to ensure the safety of our city in flood season, with a capital of xxx.x million yuan. Organize an underwater survey of the coastline of the Yangtze River and the surrounding area of Mazhou Island within xx.x kilometers, and implement special treatment according to the survey results last year. The third is to improve emergency response capabilities. Reserve woven bags, geotextiles, wood, stones, emergency pumps, lighting equipment and other flood control materials to ensure emergency use in flood season. Organize flood control emergency drills to improve the actual combat capability of disaster emergency response. After the emergency response of the Yangtze River flood control started, our bureau moved the flood control headquarters forward to the front line of the levee, and the levee inspection team in X area fought day and night, * * * found and effectively disposed of the leakage point xx of the levee, which was fully affirmed by the ministries and agencies.
(3) The river length system has achieved remarkable results. First, the responsibilities of the river chief are fully compacted. Around the comprehensive management of black and odorous water bodies in urban areas, several working meetings on river length system were held to comprehensively consolidate the responsibility of river management. Jointly organized by the Municipal Commission for Discipline Inspection, the Government Office, the performance of office and the Civilization Office, X special inspections of river length system were carried out, and X inspection reports were issued to promote the rectification of outstanding problems of more than xxx river lengths. Second, the improvement of rivers and lakes has been comprehensively promoted. We will carry out special rectification actions against the two violations of the backbone rivers and lakes, and xxx will pass the X-level acceptance and cancellation. Complete the special rectification of two illegal projects in xxx city, namely, the river head and the town river, and pass the X-level acceptance. The third is to strengthen the effectiveness of problem inspectors. Strengthen tracking and supervision, and urge the rectification of assigned problems. Throughout the year, a total of xx person-times were visited by the municipal river chiefs and township river chiefs, and xx copies of supervision orders were completed.
(4) The level of water conservancy management has been effectively improved. First, pay close attention to shoreline improvement. Complete the clean-up and rectification of the xx shoreline utilization project in Jingjiang section of the Yangtze River, and pass the review and acceptance by the Yangtze River Committee and the ministries and agencies. Participate in the demolition of Huangpu, Yongye and Yongtai, and vacate the production coastline of x.xx kilometers. The second is to strengthen dike management. Normalization will promote the rectification of illegal activities within the scope of dike management, * * * stop and dismantle xx illegal construction, dismantle xx piles, plow and plant xxx mu of miscellaneous trees and weeds, and repair xx kilometers of dike roads. A new round of delineation of the management scope of rivers, lakes and water conservancy projects in the city, measurement of the river range line of xx kilometers, installation of xx signs, and burial of xx boundary markers. The third is to optimize water regime scheduling. Continue to strengthen the dispatch of clean water sources, effectively guarantee the basic ecological flow of rivers, and the water quality of the sections above the provincial level in the city is basically stable at Class III water standards. The water intake and drainage of the sluice stations along the Yangtze River adopt the method of ×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××× The comprehensive reform of agricultural water price has been carried out in an all-round way. The whole city has completed the reform with an area of xx million mu, which has been verified by the ministries and agencies. Establish xxx farmers' water cooperation organizations and install xxxx sets of metering and timing facilities for irrigation stations. Implement the second round of water conservancy project management scope delineation, and complete the field surveying and mapping work of xx km secondary rivers and xx irrigation areas such as Qinglong Port, Qiwei Port, Danhua Port and Yupo Port.
2. The next work plan of the Water Resources Bureau. Xxxx year work summary
(1) Steady progress was made in key water conservancy projects.
Actively promote the preliminary work of water conservancy projects, and complete the project proposal, feasibility study report and the preparation of agricultural irrigation water supply security planning in xx city. Make every effort to advance the construction progress of key projects, complete the investment of x.x million yuan, start the construction of water-saving reconstruction projects in five medium-sized irrigation areas, including Datong Reservoir, and complete the upstream regulation project of Xinbaita River, the Chuanqiao Irrigation Station project and the reinforcement project of X small reservoirs. Complete the completion and acceptance of Qinlan River regulation project, Changxing Phase I and Phase II station and waterway reconstruction project in Jinniu Lake New Area.
(2) Consolidate and improve rural drinking water safety.
Complete the pipe network extension project of xx Town and xx Town with an investment of xxx million yuan. Carry out re-investigation and dynamic cleaning of the drinking water safety problems of the poor, boost poverty alleviation and solve the drinking water safety problems of xxx households with difficulties. Further improve the supervision and management system of rural drinking water projects, strengthen the operation and management guidance of water plants, carry out the training of water quality testing personnel to ensure the accuracy and effectiveness of water quality testing, inspect large water plants every month, and promptly notify the rectification requirements to ensure the normal operation of water plants.
(3) Flood control and drought relief are solid and effective.
Conscientiously implement the responsibility system for flood control and drought relief, and clarify the main body and responsibility of management and protection of various water conservancy projects. Scientifically dispatch water sources, replenish water xxxx ten thousand square meters in advance for drought resistance, dredge water diversion channels xx kilometers, and complete the task of summer sowing. Carry out pre-flood inspection, sort out hidden danger points xx of water conservancy projects and organize acceptance cancellation. Revise xxx scheme for dispatching various water conservancy projects and improve xxx emergency plan for flood control and emergency rescue. Organize training and drills on flood control and emergency rescue, improve the flood control level and emergency response capability at the grass-roots level, and ensure smooth flood control in the city.
(4) The Jianghu long-term system exists in name only.
Actively create provincial-level demonstration rivers and lakes in Baita River urban section, continue to clean up the four chaos in rivers and lakes, dismantle X illegal shipyards, standardize more than xxx fishing boats, remove more than xxx cars of river garbage, dismantle xx shacks, and clean up X planting sites. Clean up xxx rural ditches and ponds, x.x million tons of domestic garbage, and build xxx households in disorder. Rectify the xx problems assigned by the Ministry of Water Resources and the directors of xx and X cities, and organize unannounced visits to the work of street chiefs in various towns.
(5) Further standardize the management of water resources.
Strictly implement the dual control management of the total amount and intensity of water resources, and comprehensively issue the water plan for xxx water users. Re-approve x users who have exceeded the approval. Strengthen the capacity building of water resources monitoring, and all xx water users who use X million cubic meters of groundwater and X million cubic meters of surface water have installed online monitoring equipment. Further improve the water resources planning system, formulate comprehensive water resources planning, and complete the post-evaluation of water resources planning of xx Town Chemical Industry Park and High-tech Zone. Increase the collection of water resources fees, implement monthly collection, and collect water resources fees of more than xxx yuan. Carry out preparatory work for the establishment of water-saving society in the county, and actively promote the construction of water-saving carriers such as water-saving organs, water-saving residential quarters and water-saving enterprises.
(VI) The management of the water conservancy industry has been gradually improved.
Strengthen the supervision of soil and water conservation and complete the rectification of illegal production and construction projects in xx. Strengthen the maintenance of water conservancy projects in water management units and invest xxx million yuan. Dam safety appraisal was conducted for Chuanqiao Reservoir, Jiao Jian Reservoir, Datong Reservoir and Shiwan Reservoir. Pay close attention to the safety production management in the water conservancy industry, and no safety accidents occurred throughout the year. Promote the work of popularizing the law during the Seventh Five-Year Plan, deepen the special struggle to eliminate evils, strengthen water law enforcement, and mediate and investigate more than xx cases of water violations. Carry out supervision in internet plus and strengthen the construction of credit system in water conservancy industry. Conscientiously implement the tasks assigned by the municipal party Committee and the municipal government, focusing on the civilization creation of water conservancy system, joint creation of three cities, straw burning ban, double support, publicity, letters and visits, comprehensive management, family planning, investment promotion, trade union assistance, house expropriation, and working committees.
In the past 3 1 year, under the correct leadership of the municipal party committee and municipal government, with the care and support of the Municipal People's Congress and the CPPCC, and under the careful guidance of the superior water conservancy department, the Municipal Water Conservancy Bureau has done a lot of work in flood control and drought relief, drinking water safety, water ecological civilization construction, water conservancy project supervision and self-construction, and all the cadres and workers in the water conservancy system have made concerted efforts to make new achievements. The work summary of xxxx and the work plan of xxxx are as follows:
I. Work progress in xxxx year
(1) Jiang Anning
1. The defense mechanism is more perfect. The city has firmly established the idea of flood control, flood fighting and disaster relief, improved the flood control and drought relief command system, and strictly implemented the flood control mechanism of early warning to townships, planning to villages and responsibility to people. In specific work, we should pay attention to three aspects: organizing leadership, consulting and judging, and mobilizing the masses; Pay attention to three dependencies, namely, relying on laws and regulations, relying on the combination of military and civilian, and relying on advanced technology; Implement six points, namely, forecast and early warning, publicity, power preset, emergency response, relocation and supervision and inspection.
2. The defensive measures are more comprehensive. Always adhere to the defense goal of putting people's life safety first and the defense policy of combining prevention with rescue, and constantly consolidate the flood control engineering measures and non-engineering measures in our city. First, strengthen engineering measures, carry out pre-flood inspection and hidden danger investigation, complete the rectification of X safety hazards, and strive for municipal funds of xxx million yuan; Implement the design fee of xx million yuan for reservoir management; Strive for the Municipal People's Government to solve xxx million yuan for dam safety appraisal, and the dam geological survey is currently under way; Complete the dam seepage control construction of Dianziping Reservoir with a total investment of xxx million yuan; Complete the recent flood control project of the key reach (xx) of the Qingjiang River, with a total investment of xxxx million yuan and a river length of x.xxxkm;; Xiaoxi River and Gao Qiao River Regulation Project, with a total investment of xxxx million yuan; The second is to improve non-engineering measures. X county-level mountain torrent disaster early warning platforms have been built in the city, including xx automatic rainfall stations, X automatic water level stations, xxx simple rainfall stations, X image monitoring stations and xxx wireless early warning broadcasts. The arrival rate of equipment has reached over xx%. This year, the * * * meter has released major meteorological forecasts and real-time water and rain information for xx times and xxxx articles.
3. The defense effect is more significant. Under the correct leadership of the Municipal Party Committee and the Municipal Government, and with the strong support of the National Water Conservancy and Flood Control Sub-headquarters, good disaster prevention and mitigation benefits have been achieved through early warning, scientific dispatch, safe transfer and active disaster relief. The city reduced the inundation of cultivated land by x.xxxx million mu, avoided the reduction of grain production by x.x million tons, reduced the number of people affected by floods by x.xx million, rescued people trapped by floods by x.xx million, avoided casualties by X. XX million, realized the economic benefit of disaster reduction by xxxxx.x million yuan, and successfully achieved the two guaranteed goals of flood control and drought relief.
(2) Green mountains and green waters are covered with splendid scenery.
1. Ecology of long-term purified water in rivers and reservoirs. Our city comprehensively promotes the long-term system of river reservoirs, pays special attention to the protection of the Yangtze River, protects a river, adheres to the harmonious and green development of people and water, strengthens the management and protection of rivers, and gradually promotes the long-term system of river reservoirs in the city. First, the Implementation Plan for Full Implementation of the Length System of Rivers and Reservoirs in xx City (xxxx-xxxx), the Implementation Plan for Demonstration Construction of Clear Water Defence War in xx City and the Implementation Plan for Incorporating Small and Micro Water Treatment into the Length System of Rivers and Reservoirs were formulated, which refined the tasks, promoted the upgrading of the Length System of Rivers and Reservoirs, and established a unified zoning system, construction system and assessment system for water ecological environment management in the whole city. The second is to solidly implement the x+x (three-level river chief and three-person management) system, and urge river chiefs at all levels to increase the intensity and frequency of river patrol. At present, municipal river chiefs inspect rivers xx times, township river chiefs inspect rivers xxx times, clean rivers xxx times, and solve river problems xx times. The third is to establish a long-term management system, and all xx reservoirs in the city implement the long-term management system. The annual funds for river length system, reservoir length system, reservoir flood control duty and water quality inspection are xxx million yuan and xxx million yuan respectively. The fourth is to complete the ecological restoration project of xx hydropower station and the ecological flow monitoring of xx hydropower station. The city's Xx hydropower stations were cleaned up, and the Comprehensive Evaluation Report on Cleaning and Rectification of Hydropower Stations in xx City was compiled, which was rated as rectification class xx and exited class X.. At present, the rectification plan of one station and one book for hydropower station is being compiled. It has effectively guaranteed the life and health of rivers and promoted the scientific, reasonable and orderly development and sustainable utilization of hydropower resources in our city.
2. Take measures to strictly control water resources. First, increase the publicity of water laws and regulations. Make full use of the commemorative activities of China Water Week on World Water Day, dispatch mobile publicity vehicles to broadcast water laws and regulations in xx towns and villages in the city, * * * distribute more than xxxxx publicity materials of various water-related laws and regulations, hang xx publicity banners, and send more than xx water-saving short messages of love the water to the people of the city. Second, seriously formulate water resources planning. Complete the Water Supply Source Planning of xx City, the Sand Mining Planning of Yujiang River Basin of xx City, the most stringent water resources management implementation plan of xx City, the water source protection planning of xx City, the analysis report on the pollution capacity of water functional zones of xx City and the water resources bulletin of xx City in xxxx year, fully and timely grasp the development, utilization, protection and water ecology of the whole city, and provide reliable basic information for the planning and decision-making of the government and relevant departments. Third, strict water resources management. In xxxx, there are X water users with administrative license, and the annual licensed water consumption is xx.xx million mx. The water intakes of the first water plant and the second water plant are included in the national online monitoring, and the water intakes of the branches of xx Co., Ltd. and the water intakes of the south and north main canals of Changhong Reservoir and Fujiaba Reservoir are included in the provincial online monitoring, and the water intakes of X water users and X irrigation area are monitored in real time, and the total water intake is within the target control range. Water functional areas are restricted from receiving pollution, and xx water functional areas are monitored every month. The fourth is to prevent soil erosion. Complete the comprehensive soil erosion control project of sloping farmland in xxxx, and the soil erosion control area of sloping farmland in Dongfeng project area is xxx.xxhmx, with an investment of xxxx million yuan; Xx.xxhmx, the prevention and control target of soil erosion, was added in xxxx, and the annual control task was completed in early xxxx.
3. Strictly enforce the law to prevent water pollution. Severely crack down on illegal activities involving rivers and wading, strictly examine and approve soil and water conservation plans, and provide guarantee for the protection and restoration of the ecological environment. Strengthen daily inspections and law enforcement supervision, check the rivers, reservoirs and water sources in the city, totaling more than xxx person-times, check the river course for xxx kilometers, and investigate and deal with water violations for xx times, including stopping illegal acts on the spot for X times, putting on record for xx times, closing the case for xx times, and issuing xx copies of notices ordering to declare water and soil conservation plans. Xx items of administrative examination and approval are accepted, xx items of water and soil conservation schemes for construction projects are approved, xx items of water and soil conservation schemes are approved, X items of commitment water and soil conservation scheme report forms are accepted, and X items of water and soil conservation facilities are independently accepted and reported; Adhere to the rectification task of feedback from the central environmental protection inspector for a long time, take the lead in handling xx pieces of feedback from the provincial environmental protection inspector, and have sold X pieces, and take the lead in handling X pieces of rectification task of feedback from the central ecological environmental protection inspector; The water conservancy fee is xxx.xx million yuan, of which the water resource fee is xxx.xx million yuan and the compensation fee for soil and water conservation is xxx.xx million yuan, accounting for xxx.xx% of the annual collection task.
(C) Industrial poverty alleviation benefits people's livelihood
1. The bottom line for project construction to ensure people's livelihood. One is to complete the construction project of xxxx Jiu Waterworks in Southwest China, with an investment of more than 10,000 yuan. The second is to complete the short board project of drinking water safety in xxxx-xxxx, with an investment of x.x billion yuan. The third is to organize the safe clearing of drinking water. More than xx cadres and workers from all over the country evaluated and inspected the villages with zero clearing of drinking water safety reported by towns and villages, comprehensively found out the villagers' water use situation, and solidly promoted the work of making safe drinking water stronger and bigger and sprinting to zero clearing. At present, the task of clearing xxx villages in the city has been completed. Fourth, the policy document of two exemptions and one supplement for drinking water safety and the implementation plan of rural water supply project in xx city were issued. The fifth is the construction of immigrants under construction. Complete the compensation for land acquisition and demolition of xxx households and X villagers' committees of Xiakoutang Power Station, with a total area of xxxx.xx mu, including land area of xxxx.xx mu and water area of xxx.xx mu; Completed the relocation of xx households with xxx people, with a construction area of xxxx.xx㎡ and a production resettlement population of xxx people. Sixth, post-migration support work. Complete the project planning, project construction, implementation management, inspection and acceptance of support funds for large and medium-sized reservoirs in the later period of xxxx; In xxxx year, the original People's Republic of China (PRC) late large and medium-sized reservoir relocation support direct subsidy funds issued xxx.xx million yuan.
2. Poverty alleviation in the village to implement hot people's livelihood. Our bureau * * * involves X resident poverty alleviation villages and selects xx resident team members. At the same time, X team members were added to xx village in xx town, and agents were paired to help xx cadres. Over the past year, the sharp knife class has guided the development of tea planting in xxxx mu, driven poor households in xxxX, and built a tea factory with more than xxx yuan from the cooperation project between the east and the west. Carry out ex situ poverty alleviation and relocation of xx households, and complete the renovation of dangerous houses of xxx households. At the same time, actively guide the construction of regimental roads and toilet renovation in Laowuji village, vigorously publicize the knowledge of pest control, formulate village rules and regulations on environmental sanitation, and make every effort to promote poverty alleviation in the village. Xx drinking water safety projects were implemented throughout the year, covering xxx poor households, which solved the problem of unsafe drinking water for xxxx people and all of them have been put into use. At the same time, our bureau invested xx.x million yuan for the construction of village-level supporting facilities and other facilities.
(4) There are practical measures for industry supervision.
1. Hold the bottom line of safety production. In order to ensure the safety and controllability of water conservancy construction projects in our city, our bureau adopted the work plan and key points of safety production; Hold regular work meetings on production safety to convey the spirit of superior documents; Conduct regular safety inspections and hidden dangers investigation for rural hydropower stations, flood control and drought relief, rural drinking water and other projects; In the spring of xxxx, we will carry out centralized renovation of the campus and surrounding environment to promote the construction of a safe campus in the city; Focus on the special actions of fire safety inspection to prevent risks, ensure safety and ensure troops X; Xxxx organizes the national water conservancy safety production knowledge network competition to improve the professional knowledge level of all staff; Organize safety production month activities; Carry out a series of measures such as special inspections and rectification actions, and strive to achieve the goal of zero accidents in engineering construction. Up to now, * * * has arranged various kinds of safety inspections in xx batches, inspecting X-blocks of rural hydropower stations, drinking water projects, projects under construction (Fuxing, Xiaoxihe) directly managed by the Municipal Bureau, and tourist drifting X-blocks, and found out more than xx items of potential safety hazards and existing problems, which have been comprehensively rectified in place.
- Related articles
- Who is the chairman of Leju Trading Group?
- Sentences telling college students the importance of mental health (4 sentences in a collection)
- Introduction to the first-class qualification standards of contracting enterprises specializing in airport air traffic control engineering and terminal weak current system engineering?
- How about Bank of Beijing? Is it safe?
- What happened to Princess Yongxing's adultery in history?
- How to do well the party building work of government organs in the new period
- Monthly summary of production safety in sewage treatment plants
- Improvement of green campus handwritten newspapers
- How about Henan Coleman Heating and Ventilation Equipment Co., Ltd.?
- The slogan of the centenary of the old man