What are the safety assurance measures for water source projects in water plants? Below, Zhongda Consulting will give you a detailed introduction for your reference.

(1) All personnel of the project management department shall implement various laws and regulations of the state and the Anhui xxx municipal government regarding production safety, social security and environmental protection, as well as the company's rules and regulations.

Conscientiously implement the safety production policy, strengthen the safety production responsibility system, strengthen safety education for employees, formulate and implement individual safety technical measures and safety operation rules, and ensure safe production and civilized construction.

(2) Strictly implement the ISO9001:2001 standard that the company has certified.

(3) The company and the project manager sign a responsibility letter for safe and civilized production and environmental protection, clarifying various rewards and punishment responsibilities.

(4) The project manager assigns a full-time safety supervisor to be responsible for the safe and civilized production and environmental protection of the project.

(5) The project manager signs a responsibility letter for safe and civilized production and environmental protection with the safety supervisor and relevant personnel to clarify their respective scope of responsibilities and corresponding reward and punishment measures.

(6) Before caisson excavation and pipe jacking construction, it is necessary to prepare confidential underground facilities and verify that the telephone poles and other cables, water pipes or other municipal facilities discovered during the construction must be Take necessary protective measures to prevent displacement and damage.

(7) Carry out environmental monitoring and protection work to protect existing underground and above-ground facilities, and go through relevant procedures before construction.

(8) The installation of temporary power lines on site must be arranged in accordance with the requirements of the "Technical Specifications for Safety of Temporary Power Use at Construction Sites", and necessary zero connection protection devices must be installed. The lighting lamps and hand-held lamps used on each working surface must be of safe voltage, that is, 36V. No one should operate electrical equipment with wet hands or wet clothes.

(9) Various construction machinery and equipment must be operated and driven by skilled and experienced personnel, and inspection, maintenance and repair work before, during and after use must be carried out in accordance with relevant regulations.

(10) When intersecting operations occur under special circumstances, reliable protective measures must be set up to isolate the working surface, and full-time safety inspection personnel must be appointed to be responsible for coordination and inspection between each working surface.

When a dangerous situation occurs, immediately order relevant personnel to take emergency measures or leave the working surface.

(11) Operators of special types of work must hold certificates to work, and unlicensed personnel are not allowed to work at will.

(12) All personnel must participate in training on construction methods and relevant safety operating rules before taking up their posts.

(13) Mechanical equipment used in construction must be carefully inspected before use, and can only be used after trial operation.

(14) Do a good job in environmental monitoring and protection during pipe jacking construction to control surface settlement within the settlement range allowed by the construction unit. Relying on monitoring data and data feedback, the excavation range, depth, water level in the well, etc. of the caisson, as well as the jacking force, speed and other construction parameters in the jacking pipe are continuously optimized to reduce surface subsidence and reduce disturbance to the soil. . Avoid blind construction and risky construction.

(15) A power outage must be ordered and a power outage warning sign must be hung. The power outage order must be withdrawn when closing the circuit breaker. Only when it is confirmed that no one is working on the line can the warning sign be taken off to transmit power.

(16) At least two people should work when overhauling electrical equipment, and take protective measures.

(17) Pipe jacking machine head operators, welders, electricians, surveyors, mud workers, etc. must learn the pipe jacking method and relevant safe operation rules, and work with certificates after passing the training. .

(18) Conscientiously implement the relevant regulations and methods for the construction management of urban roads and underground pipelines. Before construction, actively learn about the pipeline situation from relevant units, go through relevant procedures, coordinate the treatment plan, and ask the relevant authoritative departments to carry out the work. Monitor and take effective measures if problems are discovered.

(19) Establish a special liaison group with an engineer to assist Party A in solving various problems encountered during construction.

(20) During the construction of the water intake head and the construction of underwater immersed pipes and pile foundations, detailed measures should be taken to ensure the safe passage of the Yangtze River waterway, and eye-catching signs and regulations should be set up in accordance with the regulations of the waterway department.

(21) During construction in the rainy season, sufficient water pumping equipment should be prepared. In order to ensure power supply, own generators should be provided to ensure drainage needs.

(22) Public security and fire protection work adheres to the guiding ideology of "prevention first, ensuring key points" to ensure safety during the construction process. The management department has established a security work leading group to uniformly lead the public security and fire protection work of this project. Each project team has set up part-time security officers to work on a divided basis to coordinate work.

(23) Equipped with various fire-fighting equipment and designated personnel for inspection.

(24) Measures should be taken to prevent electric shock and explosion during electric and gas welding.

(25) Take measures to reinforce the levee to eliminate potential safety hazards of the Yangtze River levee.