Summary of supervision work for half a year

In the supervision work, we need to constantly sum up our own work, so as to sum up experience for the later work and improve efficiency. The following is a summary of the supervision work in the past six months. Welcome to reading.

Summary of supervision work for half a year I

How time flies! Half a year's work will soon become history again The first half of 20XX is coming, and the second half of 20XX is coming. A new beginning means a new starting point, new opportunities and new challenges. Determined to make persistent efforts and go up a storey still higher? We must strive to open up a new situation in our work. In the second half of the year, we will better complete the work, foster strengths and avoid weaknesses, which are summarized as follows:

In the first half of the year, the total length of rural roads such as Mengjiazhuang line, Tiangong camp line and Xiaoshizhuang line was 3.223 kilometers, and the supervision work of the hospital maintenance and the excavation of the west small line of the Transportation Bureau was completed. In the process of supervision, have we increased? Warm service? Strength, make more reasonable suggestions and strengthen? Prior supervision? Let the construction unit take fewer detours and eliminate the quality problems in the bud, which has played a great role in ensuring the smooth completion of the project.

In the process of digging and mending the western line, the concealed works were inspected by the side station and the usual return visit, and the sampling inspection reached or exceeded 20%. Some quality problems existing in the construction process of the construction unit will be found and corrected in time, and a notice will be issued to ask them to correct, so as to ensure the quality of the project. During the supervision of cement surface in Mengjiazhuang and Tiangongying, our supervisors prepared cement concrete samples on site and sent them to the laboratory for maintenance, which provided quality and technical guarantee for the smooth progress of the project.

In the second half of the year, it is planned to complete the new construction project (2.202km) north of Education Road, complete the greening of Sixth Front Line, West Small Line and Old Front Line, and complete the excavation and supervision of 29 rural roads such as Hengjing Branch Line, West Small Line, Tianwang Line, Old Front Line, Tianwang Line and Huixin Line.

In the past six months, despite some achievements, there are still some shortcomings. In the second half of the year, the tasks will be more and heavier. Faced with the reality of small manpower and large working area, we will, as always, complete the work in a down-to-earth manner. At the same time, in view of shortcomings and positions

Requirements, strengthen three aspects:

First, strengthen the study of political theory and professional knowledge, constantly update and supplement new knowledge and theories, and improve their political quality and professional ability.

The second is to strengthen the sense of pioneering and enterprising, actively and effectively carry out work, and effectively improve the innovation ability and work efficiency.

Third, strengthen the organic combination of theory and practice, constantly adapt to the requirements of the new situation, and make greater contributions to the transportation industry.

Summary of supervision work for half a year II

The first half of 20XX year is over. Looking back on the past, my work has both joys and sorrows. In order to facilitate my future work, I hereby sum up my work experience and lessons this year, improve my overall quality and find a better working method, so as to work harder in the second half of 20XX.

I. Work this year

Since the beginning of the year, I have been working as a supervisor in Wu Nan Branch, studying hard and understanding the site situation. I have supervised the construction of retaining piles in Taishan Road Station, Zhiquan Road Station and Wu Nan Section.

At present, 50% of the excavation and support between the five districts in the southern district have been completed, and these three projects are the work sites that must be inspected every time. Therefore, in the usual construction, due diligence and strict quality control have withstood the test in the usual inspection, and the work assigned by the superior leaders has been well completed.

Patrol and inspect the managed construction site every day, supervise scientifically, and earnestly perform their duties. Conduct on-site supervision under the guidance of the chief supervision engineer; Regularly check the manpower, materials, main equipment and their use and operation put into the project by the contractor, and make inspection records; According to the design drawings and relevant standards, check and record the contractor's construction process and procedures, and record the inspection results of processing, manufacturing and process construction quality; Timely supervise the construction quality of key parts and key working procedures in the process of engineering construction, point out problems in time, and fill in inspection records and supervision notices; Truthfully record supervision diary and related supervision records in daily supervision work.

Two. Problems in the work in the first half of the year

A year's work is always a bit bumpy, and it is inevitable to encounter quarrels with the construction team and the construction unit in violation of drawings and construction specifications during on-site construction. In the process of supervision, each construction site shall be supervised according to the Entrusted Supervision Contract of Construction Project, Construction Contract of Construction Project, design drawings, national standards and relevant laws and regulations. Many problems in the construction were found in the inspection, but under the leadership of the chief supervision engineer, these problems have been implemented and rectified.

Three. Summary of experience in the first half of the year

1. As a supervisor, first of all, we should learn and implement the spirit of instructions in the documents of the superior leaders; Master the new specifications, be familiar with the construction drawings, and strengthen their own business knowledge.

2. Strictly abide by the company's internal regulations and abide by the law.

3. Acceptance shall be conducted in strict accordance with the design, specifications and acceptance criteria during construction, so as to ensure the project quality, safety and civilized construction to satisfy the owner.

Summary of supervision work for half a year III

In April of XX, entrusted by the owner, the Xinjiang Project Supervision Department of Luoyang Zhongyuan Supervision Company was responsible for the supervision of industrial construction in Hubei (office building, expert reception building, supply and marketing building), Wu Jian in Nantong (1#-4# apartment building), Ye Si in China (the factory building was changed into a comprehensive building) and other projects in the factory front area. According to the nature of supervision work and the requirements of the owner, the supervision department has formulated supervision rules, supervision plans, side-by-side supervision plans, supervision parallel inspection plans and supervision post responsibility system.

The office of supervision department is located in the construction site of Hubei Province to help and solve all kinds of problems in project construction in time. According to the requirements of the owner's unit, the supervision department will swipe the card to sign in at work and maintain the attendance rate of all staff. Even on holidays, all professional supervisors can consciously perform their duties and successfully complete the supervision task. The supervision work in the first half of this year is summarized as follows:

1, project image progress, progress payment approval

Gong Jian, Hubei Province completed the steel binding and concrete pouring of the basement (1 ~ 26 axis) and the first floor of the office building, and completed the progress payment of 22.69 million yuan. The expert reception building started on April 6 this year. At present, the work of foundation cushion, anti-corrosion of foundation pile caps, foundation backfilling, binding of independent columns and a layer of steel bars, formwork installation, etc. has been completed, and the project progress payment is 8.39 million yuan. Supply and marketing building started in April this year 19. At present, the anti-corrosion work of foundation cushion and foundation pile cap has been completed, and the project progress payment is 16 1.8 million yuan.

Nantong Wu Jian 2# apartment building resumed work on April 6 this year. According to the requirements of the owner, it has been accumulated.

Take the initiative to grasp the project quality and image progress, and complete the bathroom waterproofing, wall tile pasting, floor tile paving, ceiling, water and electricity installation; Stainless steel railings and stair handrails; Roof waterproofing, interior and exterior wall painting, door and window installation and other projects. On May 3rd1day, the preliminary inspection and acceptance of 2# apartment building was carried out, with a total construction area of 6919.16m2 and a total building height of16.20m, with four floors and a frame for the main structure. The approval of the project is16.96 million yuan. The quality of the project has been evaluated by Kuitun Quality Supervision Station, the employer and our supervision department, and the conclusion is qualified.

After the 3# apartment building resumed work on April 1 this year, it completed the construction projects such as floor heating, floor tile laying, bathroom tiling and roof waterproofing. The progress payment is approved as 6 184600 yuan.

After the apartment building 1# resumed work in April this year, the main body acceptance was completed. At present, the progress payment for plastering the interior wall is 2 147300 yuan.

After the 4# apartment building resumed work in April this year 1, the main body acceptance was completed. At present, the progress payment for plastering the interior wall is 2 147300 yuan.

2, engineering quality, safety and civilized construction site

1. The office building, expert reception building and supply and marketing building undertaken by Hubei Industrial Construction Company have completed the basement and first floor construction project. After on-site follow-up inspection and sampling inspection by our supervision department, Kuitun Quality Supervision Station and the owner unit, the on-site engineering quality meets the design and specification requirements.

2. During the daily inspection, the professional supervisors cooperate with the general contractor to solve the problems found on site in time, issue supervision notices to the construction nodes that do not meet the design and specification requirements for rectification, and adjust the construction personnel who do not obey the management.

In terms of safe and civilized construction, management personnel and construction personnel have achieved certificates. All kinds of construction machinery and equipment (tower crane, steel bar straightener, bending machine) keep normal operation. The site office, steel shed, woodwork shed and finished product protection shed are arranged reasonably, and the raw material stacking marks are clear. The installation of "five cards and two pictures" and various safety signs meets the requirements, and the door head, colored board construction fence, access to the construction site, colored flags, various publicity slogans, slogans and signs are installed in an orderly manner. On the whole, the sensory effect and image of the construction site have fundamentally improved to a new level. Newly-entered construction personnel should carry out three-level safety education in time. Before every day's operation, the monitor should make a speech and make technical disclosure of construction.

3, raw materials approach and witness inspection

All construction units shall timely inspect the raw materials entering the site, witness and sample the building materials according to the specification requirements, and send them to Kuitun Quality Inspection Station for technical appraisal. Construction materials meet the design and specification requirements.

Attend the regular meeting of supervision and engineering on time, implement the schedule and quality requirements put forward by the meeting, rectify and reply to the supervision notice in time, and synchronize the information with the construction progress.

4, grasp the management work

In the construction of No.2 apartment building, Nantong Wu Jian actively implemented the construction progress required by the owner, deployed construction management personnel to strengthen the management in the construction process, well coordinated the various processes, educated the construction personnel to strengthen the protection of finished products, and ensured the engineering quality to meet the design and specification requirements.

Pay attention to quality, and do three stops and one inspection in construction management, that is, steel bar anchorage, steel bar lap installation in place, after the completion of beam, plate and ladder steel bar, stop the construction of next working procedure first, and then proceed to the construction of next working procedure after inspection.

Grasp management and improve the management system. From safe and civilized construction to strict requirements in all aspects of engineering construction, 37 supervision notices were issued by various professional supervisors in the first half of the year. Most of them can be rectified and replied in time.

Adhere to the system of supervision meeting and engineering meeting on Friday, solve the problems that need to be solved in time, put forward the requirements for solving the safety, civilized construction and quality problems in the regular meeting within a time limit, and check the implementation in the next regular meeting to ensure the progress and engineering quality meet the requirements.

According to the characteristics of the construction site, various professional supervisors insist on daily inspection and on-site work to ensure that every construction site will arrive and follow the key procedures throughout. Ensure the engineering quality meets the requirements.

Step 5 coordinate work

Safety professional supervisor (HSE) is responsible for the three-level safety education and safe and civilized construction of all construction units. When there is a shortage of stow-wood in the internal scaffolding, take the initiative to go to the refinery project site for help, and borrow three stow-wood to solve the urgent need in engineering construction.

The supervision department actively strengthens the business contact with the owner unit. For newly started projects, the construction unit can be organized to start construction first according to the intention of the owner's unit leader, and then all kinds of application materials can be completed quickly.

6, conscientiously sum up, and constantly improve the level of supervision

Management is not strong enough: this may have a lot to do with each manager's personality; There are also some weaknesses in the management system; Without ready-made experience, we advance in groping and lack confidence. Two veteran supervisors who have worked in professional posts for decades are particularly hard-working. I not only insist on daily on-site inspection and handling problems, but also have rich supervision experience. I found the problem acute and handled it easily, which played a guiding role for our supervision department and was fully affirmed by the construction unit and the owner unit.