Construction site management regulations
Construction site safety and civilized construction management system
1. The construction unit should strictly abide by the safe construction, civilized construction and other norms and regulations issued by the national and local governments, and abide by the construction unit's on-site management regulations . The construction unit will invite relevant departments from time to time to conduct inspections in accordance with the "XXX Construction Project Site Civilized Construction Inspection and Assessment Standards" and other requirements. If the civilized construction site standards are not met, the construction unit can order it to stop work for rectification.
2. "Five pictures and one sign" must be set up at the construction site as required, and the content and form of the signs must comply with relevant regulations.
3. The construction site should have appropriate slogans and safety warning signs. Slogans and signboards shall be drawn up by the construction unit, and shall be submitted to Party A's on-site representative for review and approval before implementation. Do not write graffiti or post and hang them at will.
4. The construction site implements closed management. Each construction unit formulates a corresponding gate management system and strictly implements it. Managers and construction personnel at the construction site must wear ID cards to prove their identity. Non-construction personnel are not allowed to enter and exit. Entering the construction site without permission. The content and form of the certificate card shall be drawn up by the construction unit and shall be submitted to Party A for review and approval before implementation.
5. The construction site of this project shall be within the red line of the general plan of the project and the temporary rented land. Before construction, the construction unit must arrange temporary facilities in the area specified by Party A, and shall The general floor plan can only be implemented after it is submitted to Party A for review and approval.
6. The construction unit sets up containment facilities around the construction site. If it is a project under construction on the street or in a residential area, it should set up closed containment facilities for operations. There should be no garbage within 50 meters of the construction site and 100 meters of the entrance and exit. , sewage, and keep the surrounding area clean and tidy.
7. The construction site should ensure that the access roads are smooth, flat, solid, and have room for maneuver. The construction site should have reliable drainage measures. Construction sewage sedimentation should be discharged into the place designated by Party A, and the drainage system should be in normal condition. Use status.
8. The construction unit shall reasonably arrange various temporary facilities in accordance with the general construction layout plan, stack bulk materials, finished products, semi-finished products and construction machinery and equipment, reduce secondary transport and relocation, and shall not encroach on on-site roads and Safety protection and other facilities. Scattered debris and garbage inside and outside the building should be cleaned up in time. Materials and debris must not be stacked on stair steps, rest platforms, balconies and other overhanging structures. On the construction work surface, workers should "clean their feet after finishing the work".
9. The construction unit should pay attention to and strengthen the sanitation and disease prevention work at the construction site; the staff canteen should comply with the standards stipulated in the "Food Hygiene Law of the People's Republic of China" and apply for a "Health Permit" ; Canteen staff must undergo a physical examination and pass the training before taking up their posts; if any infectious disease or suspected infectious disease is discovered, Party A shall be notified of the timely treatment and treatment.
10. Comply with national laws and regulations on environmental protection, and take effective measures to control environmental pollution and harm caused by various dust, waste gas, solid waste, noise, and vibration at the construction site.
11. Strictly follow the provisions of the "Fire Protection Regulations of the People's Republic of China and the State", establish and implement a fire prevention management system at the construction site, set up fire protection facilities that meet the requirements, and maintain them in intact standby condition. Special fire safety measures should be taken when constructing or storing or using flammable or explosive equipment in fire-prone areas. Implement the principle of "whoever does the work is responsible for safety and fire prevention."
12. Comprehensive management of social security must be strengthened at the construction site. The construction organization design should have a plan for security measures and implement a responsibility system for comprehensive management of public security. In the event of a public security emergency, the public security organ must be informed immediately. Reports to the agency must not be delayed or concealed. If you need to recruit migrant workers, you must immediately apply for an "Employment Permit", "Migrant Employment Permit" and temporary residence permit in accordance with relevant regulations. The construction site should be clearly divided into the construction area and the living area. It is strictly prohibited to arrange accommodation for people in the construction project. The sanitation and safety management of the dormitory should be done to ensure that the windows are clear and the floor is clean, daily necessities are stacked neatly, and the safe use of electricity and safety in the dormitory are ensured. Fire Precautions.
13. Management personnel and workers of the construction unit must wear safety helmets at the construction site. The color of the safety helmets should be easy to distinguish; safety belts must be worn when working at heights, so that they can be hung high and used low, and are firm and set as necessary. The safety net must be laid in layers and cleaned in time to prevent falling objects from high altitudes. All personnel, especially operators, are not allowed to get on or off the column stirrups, and the steel frame, regardless of whether it is fixed or not, is not allowed to walk on it. Especially for plate bars, "safety first" must be given.
14. Operators in the construction unit must wear uniform standard construction vests to work, which must be cleaned regularly and there must be no obvious large-area dirt.
15. If the construction unit discovers pipes, cables and other buried objects during earth excavation, it should report them promptly and shall not handle them without authorization. During earthwork construction without grading and excavation depth exceeding 1.5 meters, correct wall protection measures approved by Party A's on-site representative must be adopted; when earthwork is transported externally, a "dregs disposal permit" should be obtained and the surrounding environment should be cleaned. Hygiene; straw mats should be laid within 20 meters of the entrance and exit; during construction, personnel must be dispatched to clean contaminated roads, and the roads must be thoroughly cleaned after construction. If earthwork is stacked on site, it should be 50cm away from the fence and more than 100cm away from the operator. The vertical stacking height should not exceed 1.5 meters; manual excavation should be used within 1m on both sides of the cable.
16. During the main body and decoration construction, the construction unit must erect the outer frame and hang the safety net. The method should be reported to Party A in writing two days before construction, and can only be approved after approval. Implementation, the erection of scaffolding should comply with the "Safety Requirements for Scaffolding Erection", and special attention should be paid to supervision of situations that affect the safety of the scaffolding, such as the arbitrary removal of the connecting wall rods of the outer frame just for the convenience of construction and the loosening of the foundation of the outer frame.
17. The construction unit should perform normal and regular maintenance on on-site machinery and equipment. Vertical transport machinery (such as tower cranes, gantry frames, etc.) must have a license issued by the Labor Bureau before it can be used. For tower cranes on adjacent construction sites, all construction units should coordinate with each other and formulate anti-collision measures to prevent tower crane collision accidents.
18. The project manager or responsible foreman of the construction unit should arrive at the construction site on time every day. If there is an emergency, he should ask Party A’s on-site representative for leave approval. There should be a person in charge at the construction site at all times. If the construction person in charge is not available , a qualified interim person in charge must be appointed. The assessment results of our company's on-site representatives will be used as an important basis to measure the management level of the construction unit.
19. During night construction, the construction unit must have managers on duty, and the list of managers on duty should be reported to Party A.
20. Before construction, each construction foreman shall make a safety technical briefing to the construction workers in writing, keep written records, and accept supervision from Party A’s on-site representatives at any time. Click here to download construction technical information for free
21. The construction unit must strengthen the management and restraint of its on-site personnel. Fights of any nature are strictly prohibited during the performance of the contract. If construction personnel participate in fights, each time they occur, in addition to compensation for the direct economic losses caused to the construction unit, they must also be fined according to regulations.
22. In order to maintain the gardens and environment around the construction site, the construction unit must educate workers to care for every plant and tree, and is strictly prohibited from trampling, polluting, or destroying them.
Construction site quality management system
1. The construction unit must conduct construction and acceptance according to the design drawings, design changes, specifications, acceptance standards, relevant local regulations, and construction unit requirements , the project quality must reach excellent standards.
2. Before each construction unit starts work, the construction site must cooperate with qualified and complete management personnel, establish a complete quality and progress guarantee system, and must have an overall construction organization design and review and approval by Party A. Various special construction plans; construction cannot start without targeted construction organization design.
3. During the construction process, the person in charge and technical personnel on the construction site must make serious technical explanations to the workers, and keep corresponding written records for review.
4. Before the building is excavated, the construction unit must provide Party A with the "Layout Record", which can only be excavated after being reviewed and approved by Party A's on-site representative.
5. The "three inspections" system must be strictly implemented for concealed acceptance of sub-projects. After the construction unit passes the self-inspection, Party A and the supervisor will be notified 24 hours before the formal acceptance, and relevant qualified information will be provided. , can be concealed only after passing the inspection and signing. After the construction unit has carried out the "three inspections" for the acceptance items, if Party A and the supervisor find more than three unqualified items during the inspection process, they have the right to reject the acceptance. If the same situation occurs more than three times, they have the right to request the replacement of management personnel.
6. The construction unit is strictly prohibited from making any changes to the qualified parts after passing the acceptance inspection. Once discovered, it must be re-accepted; important hidden parts should be notified to the quality supervision and design units to participate in the acceptance inspection.
7. When Party A and the supervisor have questions about the construction quality and require the construction unit to retest, the construction unit should actively cooperate. If quality doubts are raised about concealed projects and re-inspection is required, regardless of whether the construction unit conducts acceptance inspection, the construction unit shall strip or drill holes as required, and re-cover or modify them after inspection. If the inspection is qualified, the construction unit shall bear all costs incurred and the construction period shall be postponed. If the inspection fails, the construction unit shall bear all costs incurred and the construction period will not be extended.
8. After the construction of key processes is completed, it must be signed by the supervisor and Party A’s representative (the construction unit shall submit three inspection records, construction disclosure records and other materials to Party A and the supervisor before acceptance). The next step of construction can only be carried out until this part of the project is confirmed to be qualified.
9. During the concrete pouring process, in addition to having a foreman on duty, it is also necessary to ensure that there is someone on duty for each type of work (such as water, electricity, formwork, steel bars, etc.).
10. In order to ensure the construction quality, the construction unit should first submit the construction plan for confirmation based on construction difficulties and common quality problems that are likely to occur. The construction unit may require the construction unit to make construction samples based on the actual situation ( Including masonry, plastering, coating, door and window installation, waterproofing, ceramic tiles, etc.), after the sample is accepted by Party A, the construction unit can carry out large-scale construction according to the sample; after the masonry project starts, the construction unit should follow the instructions provided by the construction unit The house plan has completed the masonry and water and electricity positioning construction standard rooms, and large-scale construction can be carried out after confirmation by the construction unit.
11. If the construction unit fails to perform construction according to the contract for many times, or violates normal construction procedures and construction techniques to carry out brutal construction, or the construction quality, safety, environmental protection, etc. fail to meet relevant requirements, or the construction materials used If the equipment does not meet the requirements, Party A has the right to order the construction unit to suspend construction, and the construction unit must make rectifications immediately. All responsibilities shall be borne by the construction unit.
12. If the area of ??the house built is inconsistent with the construction drawing due to the construction unit's reasons, Party B shall bear the related responsibilities and expenses arising therefrom. As an experienced construction unit, the construction unit should discover obvious errors or contradictions in the construction drawings in a timely manner (such as the construction drawings are inconsistent with the construction drawings, the dimensions are wrong, the functions of the house constructed according to the drawings are obviously unreasonable, etc.) and promptly inform Party A, If the construction unit fails to discover it in time, the cost and construction period loss will be borne by the construction unit.
13. All materials entering the site must provide material certification documents for review. The materials submitted for inspection must pass the test of a laboratory recognized by the local quality supervision station before they can be used on site. Each construction unit Materials should be submitted for inspection and testing in advance, and corresponding quality records should be kept for inspection. If the construction period is delayed due to failure to submit for inspection in time, the construction unit will be fully responsible. Anyone who violates the above provisions or changes the work half way through without Party A's permission will not only be ordered to rework, but will also be subject to financial penalties.
14. Each construction unit shall start rectification within 2 hours after receiving the rectification notice from Party A’s on-site representative and complete the rectification within the deadline. If there are special reasons, it shall notify Party A’s on-site representative in writing It can be extended only with permission.
15. Before mixing concrete or mortar, each construction unit must submit the concrete or mortar construction mix ratio document to Party A. During the mixing process, a construction mix ratio sign must be posted next to the mixer, and a dedicated person must be set up to monitor the measurement. , no exception is allowed at night, and supervisors are not allowed to leave the mixing site. Party A’s on-site representatives will conduct on-site spot checks at any time. Once any substandard work is found, it will be regarded as a major quality accident. In addition to being ordered to rework, compensation will be made depending on the circumstances. Click here to download construction technical information for free
16. Each construction unit must do a good job in waterproofing construction of kitchens, bathrooms, and roofs. When handing over the house to the property company, if there is leakage, it will be handled according to the requirements of each location. With a fine of 10,000 yuan.
Construction site coordination and management system
1. Before entering the site, each unit, including each construction unit and supervision unit, shall provide Party A with the detailed information of on-site managers and team leaders at all levels. The list and contact information, as well as the list of project management team members, can only be arranged to enter the site after Party A has inspected and determined that it has entered into the construction supplementary agreement. Each unit must notify Party A's engineering department in advance when changing management personnel. Party A has the right to decide whether to retain or retire the on-site management personnel based on the actual abilities and levels of the construction and supervision unit.
2. Each construction unit must install a telephone or report a mobile phone number in the on-site office when entering the site, and ensure that it is open 24 hours a day and that the construction site is manned.
3. Supervision company personnel must ensure on-site working time of more than 8 hours a day and ensure smooth communication 24 hours a day. If there are special stages of project construction or emergency construction problems, we should ensure that we go to the construction site to solve them in time.
4. Each construction unit shall submit the corresponding temporary arrangement plan to Party A before temporary construction, and shall submit the relevant construction organization design to Party A 15 days before the official start of construction. After approval by Party A’s Engineering Department Construction arrangements can be made only after signing and approval, and a start-up report must be submitted one day before the official start of construction.
5. Each construction unit must obey the coordination arrangements of Party A’s on-site representatives and the technical guidance and supervision of the supervision company.
6. All coordination arrangements between various units at the construction site, including the construction unit, construction unit, supervision unit, etc., should be communicated in writing. If there are special circumstances that need to be dealt with immediately orally, they must also be dealt with immediately. Complete formal procedures within 12 hours.
7. All on-site documents shall be based on standard printed texts and shall be properly kept. If the text is not standard printed, each unit has the right to refuse to sign for it, and the corresponding impact and responsibility will be borne by the sending party. All documents issued should have a signed receipt.
8. All written documents and notices on site must be signed by the construction unit’s management personnel approved by Party A within the specified time. If there are any objections after signing, they must be raised within the same day, otherwise it will be deemed to be approved and should be completed within the time limit specified in the document.
9. During the construction process, if each unit has management or technical problems that need to be solved through coordination, they must immediately raise them directly to Party A. The written resolution can only be implemented after consultation among the three parties and a written reply from Party A. , do not act without authorization.
10. The various on-site management systems and regulations formulated by the construction unit shall not contradict or conflict with the various management systems formulated by Party A as an attachment to the construction supplementary agreement, and shall be accompanied by the construction team before entering the site. The organizational design can only be implemented after it is submitted to Party A for review and improvement.
11. If the construction unit or supervision unit issues a notice and approves but does not implement it, 500-2000/item will be given.
- Previous article:Is Yan Hehe true?
- Next article:New Year's greetings handwritten newspaper
- Related articles
- Seventh Grade Chinese Language Volume 2 Midterm Exam Papers and Answers
- Skylark's Wish Continuation Composition
- Which department should ban flogging?
- Inspirational quotes about police officers
- Wear a mask and protect yourself.
- Present situation of teachers in Tianjiabing experimental middle school in Jiujiang city
- The difference between Lao Fengxiang and Lao Fengxiang jewelry store
- Can I wear a football scarf at ordinary times?
- 2019 Xi’an May Day activity information summary
- Design plan for parent-child activities in small classes in kindergarten