Joke Collection Website - Blessing messages - The current situation of heavy rain in Yichang is 6.28.

The current situation of heavy rain in Yichang is 6.28.

August 20 th

In the past three hours, there has been more than 60 mm of precipitation in Yichang and its surrounding areas. It is predicted that in the next three hours, the heavy precipitation in Wu Jia District, Xiling District, Tingqu District, Dianjun District and Hi-tech Zone will continue to be accompanied by lightning, with gusts of 7-9, with high meteorological risks such as mountain torrents, geological disasters, floods in small and medium-sized rivers and waterlogging in urban and rural areas.

National defense guide

1. The government and relevant departments should do a good job in emergency rescue of rainstorm according to their duties;

2. Stop the assembly, suspend classes and suspend business;

3 do a good job in the prevention and rescue of mountain torrents, landslides, mudslides and other disasters.

August 2009, 65438

Affected by the recent continuous rainfall in Sichuan and Chongqing, the "No.5 Flood of the Yangtze River in 2020" has been formed in the upper reaches. At 8: 00 on August 19, the Three Gorges Reservoir put 69,500m3/s into storage and 47,600m3/s out of storage. At present, the water levels of Yichang Station, Hongxigang Station, Yidu Zhicheng Station and Zhijiang Qixing Station in our city exceed the fortification level. Due to the influence of the Yangtze River jacking, the gate station of Zhijiang Commune at the exit of Zhang Ju is too fortified. It is predicted that the water inflow will reach 74,000m3/s at 8 o'clock on the 20th.

In view of the large amount and long duration of upstream inflow, according to the provisions of Yichang flood control emergency plan, the Municipal Defense Office decided to start flood control level IV emergency response on August 19. The Municipal Defense Office requires that all member units of the flood control index of counties and cities along the Yangtze River should attach great importance to the flood process in accordance with the emergency response requirements and earnestly strengthen the organization and leadership of flood control work. All kinds of flood control responsible persons at all levels should perform their duties on the job, carry forward the spirit of not being afraid of fatigue and fighting continuously, organize forces to carry out strict defense in accordance with the provisions of the plan, and do a good job in patrol dike inspection, dike defense and emergency rescue, especially for historical dangerous sections and buildings that pass through dikes, and implement rescue teams and materials to ensure timely rescue. At the same time, it is necessary to strengthen the duty on duty and report relevant information in time.

June 65438, 2007

Yichang Meteorological Observatory released the rainstorm red warning signal on August 7, 2020 14: 25: At present, there has been precipitation of more than 90 mm at Xujiazhuang Station in Yuan 'an, and it is expected that the heavy precipitation in the old county town of Yuan 'an will continue in the next three hours, accompanied by lightning, with gusts of 7-9, with high meteorological risks of urban waterlogging, mountain torrents, geological disasters and floods in small and medium rivers. Please pay attention to prevention.

Yichang Meteorological Observatory issued a yellow lightning warning signal on August 7, 2020 12: 42: It is estimated that there will be lightning activity in Dianjun District, Yiling District, Zigui, Xingshan, Yuan 'an and Changyang in the next 6 hours, with local rainfall of 30-50 mm and gusts of 5-7. Please take preventive measures.

July 25(th)

From the night of July 25th to the night, there was heavy precipitation in our city, accompanied by strong convective weather such as lightning, strong wind and short-term heavy precipitation. Among them, there are heavy rains and local rainstorms in Zigui, Yiling, southern Yuan 'an and western Wufeng, and there are small to moderate rains and local rainstorms in other areas.

According to statistics, from 08: 00 on the 25th to 08: 00 on the 26th, the city's accumulated rainfall was ≥ 25mm127th station, ≥ 50mm 43 station and ≥ 100mm 9 station; The maximum accumulated rainfall 183.8 mm and the maximum hourly rainfall (6 1.8 mm) all occurred at Gongjiaping Station in Wufeng.

July 20(th)

According to the latest meteorological data analysis, it is expected that Yichang will turn cloudy to showers on the 20th, light rain will turn cloudy on the 20th, and there will be some showers on the 22nd. According to the consultation opinions, emergency headquarters Meteorological Disaster Office decided to terminate the Class IV emergency response of meteorological disasters at 0: 00 on July 20th.

July 65438, 2007

According to the Regulation on Flood Numbering of Major Rivers in China, the Hydrological Bureau of the Yangtze River Water Resources Commission of the Ministry of Water Resources issued in July 17 that "No.2 Flood of the Yangtze River in 2020" was formed in the upper reaches of the Yangtze River.

Emergency headquarters, Yichang Meteorological Disaster, issued a notice to start the Class IV emergency response of Yichang Meteorological Disaster.

Yichang Meteorological Disaster emergency headquarters Member Unit, Meteorological Disaster emergency headquarters of each county:

From the early morning of July 16 to the daytime of July 17, there was a general rainstorm in the western counties and cities of our city, and there were heavy rainstorms in some towns and villages in Wufeng and Changyang, and some heavy rainstorms. According to the analysis of the latest meteorological data, it is predicted that there will still be heavy rain in our city from the night of 17 to 18, with local heavy rain, long precipitation duration and large accumulated rainfall. According to the consultation and judgment of emergency headquarters Office of Meteorological Disasters, emergency headquarters of Meteorological Disasters decided to start the Class IV emergency response of meteorological disasters on July 7th 16: 00.

After the meteorological disaster level IV emergency response is started, all localities and units should earnestly perform their respective duties and carry out emergency response work. In view of the long-term rainy weather in the early stage, this precipitation has a large cumulative rainfall, a wide range of influence and a long duration of heavy precipitation. Suggestion:

First, strengthen the defense against secondary disasters such as collapses, landslides, mudslides, flash floods, floods in small and medium-sized rivers, and urban and rural waterlogging that may be induced by heavy precipitation, and pay special attention to preventing the superimposed influence of heavy precipitation in Wufeng, Changyang and Zigui counties and cities;

Second, do a good job in the safety of water conservancy facilities such as Tang Wei and reservoirs;

The third is to strengthen the management of scenic spot safety and traffic and shipping safety;

Fourth, pay attention to prevent the hazards of strong convective weather such as short-term heavy precipitation, lightning and strong winds.

Yichang Meteorological Disaster emergency headquarters

July 12

At noon 12, Yichang Flood Control and Drought Relief Headquarters upgraded the flood control level IV emergency response to level III emergency response.

Since entering Mei on June 8, Yichang City has been hit by eight rounds of heavy rainfall continuously, and the average accumulated rainfall in the city is 540. 1mm, which is 80% more than that in previous years, ranking first in the past years, and many places in the city have been seriously affected.

At 8: 00 on July 12, the water level of the Three Gorges Reservoir was 15 1.03m, which exceeded the flood limit by 6.03m; the water level on the shore of Jiao Ling Lake was 4 1.75m, which exceeded the warning level by 0.75m. ..

12 At 8: 00 on July, among the 459 reservoirs in the city, 44 reservoirs exceeded the flood season limit, including large reservoirs 1 reservoir, 4 medium-sized reservoirs and 39 small reservoirs. Seven medium-sized reservoirs were flooded or overflowed. According to the weather forecast, there will be frequent precipitation in Yichang in the coming week, with more rainy days and more accumulated rainfall. In view of the continuous heavy rainfall, rivers, lakes, canals and ponds are at a high level, the soil saturation stability in hilly areas is reduced, and the flood control situation in the city is grim.

The provincial flood control index started the flood control level II emergency response on July 9 15. According to the Emergency Plan for Flood Control and Drought Relief in Yichang City, through research, the municipal defense index upgraded the flood control level IV emergency response to level III emergency response on July 12. All localities and units should quickly implement the flood control and drought relief responsibility system with the chief executive responsibility system as the core in accordance with the flood control level III emergency response requirements, further refine the flood control response measures, go all out to do a good job in consultation and judgment, monitoring and early warning, hidden danger investigation, risk avoidance transfer, emergency rescue and disaster relief, and fully respond to the heavy rainfall process to ensure the safety of people's lives and property.

July fifth

Yichang launched a Class III emergency response to meteorological disasters.

At present, precipitation of more than 50 mm has occurred in and around the city, Yiling District, Zigui County, dangyang city, zhijiang city and Changyang County. This morning, Wufeng, Zhijiang and Dangyang issued rainstorm yellow and rainstorm orange warnings respectively.

June 28(th)

Heavy rain suddenly fell in Yichang. What is the current disaster situation? What emergency measures did Yichang take to deal with the rain and disaster?

There are about 30 places in the urban area with serious water accumulation, and all of them should be handed over to the auxiliary police for duty.

At present, the rainfall in Yichang city is gradually weakening, and some water accumulation points are stepping up drainage. Disaster: Affected by this round of heavy rainfall, disasters occurred in Changyang, Yuan 'an, Yiling, Xiling, Wujiagang and Dianjun in the main cities. The continuous heavy rainfall has also caused serious water accumulation in more than 30 places in the urban area. Some underground garages were flooded and some shops were flooded. After the disaster, all the police and auxiliary police in Yichang, more than 1 100 people, took to the road to maintain traffic order and assist relevant units to rescue vehicles entering the water; Yichang's urban management and sanitation department also opened the manhole cover on the street to clean up the accumulated water as soon as possible. At present, the major water accumulation points have basically retreated.

The power is continuing to be repaired, and the recovery rate of 906 stations has reached 77%.

In terms of electricity, heavy rain caused serious water accumulation in many sections of Yichang city, landslides and flash floods occurred in many places, and many distribution rooms and switchgear were flooded. * * * caused power failure at 1 35kV line, 29 10kV line and 1 130 station. State Grid Yichang Power Supply Company quickly launched an emergency response in accordance with the city's flood control requirements. As soon as the rainstorm stopped, State Grid Yichang Power Supply Company immediately put into 4 1 emergency repair team, with a total of 263 person-times. Patrol the fault point, solve the problem of water accumulation, deteriorate and damage the equipment, clear the tree barrier ..... The emergency repair personnel waded in the rain to restore power supply. As of today 18: 30,1/kilovolt lines and 906 substations have been restored, with a recovery rate of 77.32%.

All counties and urban areas should do a good job in disaster safety prevention.

Emergency response: Before this heavy rainfall, Yichang Municipal Party Committee and Municipal Government had made detailed plans and preventive arrangements according to the requirements of the provincial party committee, provincial government and provincial defense office. During the period of heavy rainfall, the main responsible comrades of counties, townships and villages are on the front line of emergency rescue and disaster relief. Affected by the rainstorm, there are 13 provincial roads in the city, which have all been rushed through within 3 hours; The six damaged 10 kV conductors have all been recovered. Mountain areas, reservoir areas, mining areas, construction sites and tourist attractions have all taken safety precautions such as ground disasters. At present, the city's rescue and relief work is being carried out in an orderly manner, and the overall situation is controllable.