Joke Collection Website - Blessing messages - Has Zhengzhou subway resumed operation? The latest news of Zhengzhou subway.

Has Zhengzhou subway resumed operation? The latest news of Zhengzhou subway.

The recent rainstorm and epidemic situation have brought a lot of influence to Zhengzhou. Prior to this, some lines and stations of Zhengzhou Metro were shut down. Now everyone is more concerned about whether Zhengzhou subway has resumed operation. Let's take a look at the latest news about Zhengzhou subway.

The latest news of Zhengzhou Metro 1 Line

At 5: 04 on August 4th, the Office of the Leading Group for Epidemic Prevention and Control in COVID-19, Zhengzhou issued the document 12, and the four stations of 1 Line Erqi Square Station, Zhengzhou Railway Station, Medical College Station and Greentown Square Station were within the street jurisdiction of the closed control area, and all stations were immediately closed. From 6: 00 on August 4th,

Line 1 No-load operation is suspended.

Line 2, suburban line

On August 3rd 15: 0 1, the Office of the Leading Group for Epidemic Prevention and Control in COVID-19, Zhengzhou issued the Notice on Adjusting the Closed Area (No.202 11). According to the regulations, the areas east of songshan road, west of Zijingshan Road, south of Longhai Road and north of Huancui Road are adjusted to be closed areas. Since the six stations of Longhai East Road Station, Erligang Station, Nanwulibao Station, Huazhai Station, South Third Ring Station and Matun Station of Metro Line 2 are in the closed control area, the stations will be closed immediately, taking into account the characteristics of no-load operation of Line 2 Phase I and suburban lines.

Starting from August 3rd 16:00, the no-load operation of the first phase of Line 2 and suburban lines will be suspended.

Zhengzhou Metro Group Co., Ltd. will go all out to co-ordinate epidemic prevention and control and subway operation recovery, and start no-load operation as soon as conditions permit.

Line 3

At 05: 03 on August 4th, the Office of the Leading Group for Epidemic Prevention and Control in COVID-19, Zhengzhou issued the document Notice on Adjusting the Closed Control Area (No.202112). According to the document, the residential areas of Renhe Road Street, songshan road Street, Huaihe Road Street, Jianzhong Street, Hua Fu Street, Fengzhang Street, Daxue Road Street, Wulibao Street, Yimalu Street, Jiefang Road Street, Dehua Street and Gong Ming Road 12 streets in Erqi District are closed control areas, and the notice number is1.

As the Erqi Square Station and People's Park Station of Zhengzhou Zhongjian Shenzhen Railway Line 3 are located in the street jurisdiction of the above-mentioned closed area, the stations will be closed immediately. In order to implement the epidemic prevention and control requirements of "no entry and no gathering" of personnel in the closed control area, the first phase of Line 3, which was originally scheduled to start at 06: 00 on August/KLOC-0, has been postponed due to the epidemic prevention and control requirements.

Zhengzhou Zhongjianshen Rail Transit Co., Ltd. will go all out to co-ordinate epidemic prevention and control and subway operation recovery, and start no-load operation as soon as conditions permit.

The latest news of Zhengzhou's traffic restrictions At present, Zhengzhou City, Zhongmou, Xingyang, Xinzheng, Xinmi, Dengfeng and Shang Jie are not restricted, and gongyi city resumed motor vehicle restrictions on August 9.