Joke Collection Website - Public benefit messages - When will Guangzhou Metro 18 Line be opened?
When will Guangzhou Metro 18 Line be opened?
Guangzhou Metro 18 Line
When will Guangzhou Metro 18 Line be opened?
Opening hours:
The first section of Guangzhou Metro 18 Line (Xiancun to Wanqingsha) started operation on September 28th 14:00.
Website:
The lines are all underground stations, starting from Wanqingsha, Nansha District, Free Trade Zone, passing through Hengli, Panyu Square and Nancun Wanbo, connecting Shaxi, Longtan and Modiesha in the north, and ending in Xiancun.
Train reminder:
This line announced the express train schedule.
At the express station of 18 line, the express timetable is announced by electronic guidance equipment, so that passengers can know the departure time of the express train in advance.
Station information reminder
Information such as the arrival of the express train, whether the next train is an express train, etc. are posted on PIDS (Subway TV), platform LED, station broadcast and platform network diagram to remind passengers to pay attention to the information about the express train.
Train information reminder
The train PIDS and the train broadcast indicate whether the train is an express, and the on-board LED display will also give a prompt. When it is green, this train is an express.
When people take the 18 line, if the destination is not the express station but they miss the express train, they can get off at the next express station and take the local train instead. It is worth noting that there are various platforms on 18 line. Passengers should pay attention to the guiding signs of the station and follow the guiding instructions.
Guangzhou Metro 18 line opened.
202 1 National Day Guangzhou Metro Arrangement
During the National Day of 20021,tourists mainly went shopping. Affected by citizens' travel habits and tourists coming to Guangzhou, it is expected that the passenger flow of subway network will increase significantly compared with normal days. Guangzhou Metro will start with transportation organization, passenger service, equipment guarantee and personnel service, so as to comprehensively improve the quality of passenger service and ensure citizens' safe travel.
Operation time adjustment:
_ 202 1 September 30 10, 1,1October 5-7 10, Guangzhou Metro service hours extended1hour.
_ From September 30th to June 7th 10, Haizhu Rail Transit 1 Line Guangzhou Tower Station 19:00 stops operating (subject to the notice from the station), and other stations and time periods maintain normal operation.
National Day subway passenger flow:
Affected by the peak hours of citizens leaving work, returning home and short-distance travel, it is expected that the peak passenger flow will appear on the day before the National Day holiday (September 30), and the online passenger flow will reach 6,543,800+006,000;
On the National Day (65438+1 October1), the passenger flow is expected to be about 9.46 million.
During the holidays (65438+1 October1to 7), the average daily passenger flow is about 7.49 million.
Arrangement of rush hour and capacity:
_ The day before the festival (September 30th)
According to the previous data, due to the superposition of commuter passenger flow and travel passenger flow, the subway network will usher in the peak passenger flow on the day before the festival (September 30th), and some lines will enter the evening peak ahead of schedule, including 1, 2, 3, 3 North, 4, 5, 6, 7, 8, 14, 2 1.
The express trains on 14 Line 12 to 20: 30 are all changed to ordinary trains to improve the peak capacity.
At the same time, the whole network arranges about 30 trains, and flexibly arranges spare cars to guide the passenger flow according to the on-site passenger flow situation.
National Day Guangzhou Metro Arrangement
_ Festival period (65438+1October 1-7)
65438+1 October17, Guangzhou Metro will be configured with reference to the capacity arrangement of not less than Saturday and Sunday every day.
1 day 1 October1day, the capacity allocation of urban lines of the network will be increased throughout the day, and the peak hours of the first, second, fourth, fifth, sixth, seventh, eighth, fourteenth and twenty-first Guangzhou-Foshan lines will be advanced to 10, and the peak hours of the third, third and third north lines and APM lines will be advanced to/.
During the period of 1 October1day 10 to 20: 30,1October 7 12 to 20: 30, the express train of 14 will be switched to ordinary trains to enhance the peak capacity.
1October 6, 7, 6:30-22:30, 17: 00, Line 7 will be opened during peak hours to speed up the return passenger flow of Guangzhou South Railway Station.
Passenger transport organization and support services:
In terms of passenger transport organization, Guangzhou Metro will optimize the measures of passenger flow diversion in the network, and increase service personnel and volunteers in key stations such as interchange hubs and station-level business districts around popular tourist attractions to provide on-site guidance and help for passengers.
In terms of equipment support, equipment maintenance is carried out in advance, and technicians are on duty at large passenger stations during festivals.
In terms of passenger service, all stations in the network provide passengers with convenient materials such as love medicine boxes, convenient umbrellas and disposable raincoats in case of emergency.
Large passenger station and passenger guidance;
On the night before September 30th, due to the superposition of commuter and passenger flow, railway and highway hubs were connected (Guangzhou Railway Station, guangzhou east railway station, Guangzhou South Railway Station, Tianhe Passenger Station, etc.). ), stations near tourist attractions and business districts (Tiyu West Road, Guang Zhouta, Zhujiang New Town, Han Xi Changlong, etc.). ) and large passenger transfer stations (Chebeinan, Tang Yan, Jiahe Wanggang, Wanshengwei, etc. ).
In order to ensure the smooth and orderly passenger flow in the subway station, the relevant stations will take passenger flow diversion measures according to the actual situation on the spot. At that time, the stations and time slots for implementing large passenger flow control will be announced through station broadcasts, announcements and official WeChat. Please pay attention to the general public, plan the travel time and route during the National Day in advance, and try to choose the wrong peak travel.
Ride tips:
Under the current situation of normalized epidemic prevention and control, please take the initiative to cooperate with the bright code to take temperature measurement, wear a mask at all times, and do a good job of personal protection.
- Related articles
- How does Dongguan Bank rise step by step?
- How to check the address book on the old mobile phone.
- What if Samsung WeChat doesn't ring?
- Introduction of the Chairman's Annual Meeting in 2022
- Logistics shows that the SMS was received at 10 in the evening.
- What happened when Beijing Municipal Market Supervision Bureau talked about six online platforms?
- Services of the Global Blue Alliance
- Confession SMS love story
- Private clinic opening greetings
- Husband¡¯s sentimental wishes for his wife¡¯s birthday