Employee work log

Employee Work Diary Template

Work Diary of the General Engineering Office from June 22 to August 15

One: June 22 -Immediately end the "6-17 shutdown status" on the 24th, suspend the implementation of the "468 decoration plan", and start as soon as possible to improve the construction of Building C

(1) Report to Mr. Liu in Jinan on the morning of June 22 Briefly report and request for instructions. In the afternoon, Sun Shanxiu and Zhang Tao returned to Hainan together with Master Song and Zhao from the staff canteen;

(2) 6?23(1) Briefly report to General Manager Zhang Zhenyong on the work during the Shandong period and ask for instructions. One-step work;

(2) Check the site with Engineer Yang Tongguo and study the treatment plan for the drainage pipeline in the northwest corner of Building B on the overhead layer;

(3) Go to Hengtong Company to understand?6?17 The reason for the week-long suspension of work was conveyed to General Manager Liu on June 22, and the spirit of coordination between General Manager Zhang Zhenyong and Manager Li Guangyao on June 20 was communicated to immediately resume construction and invest in improving the construction of Building C to start the work;

(4) Zhang Tao transferred to Hengtong Company to submit the "Resumption of Construction Report" on June 24 after the one-week shutdown.

(5) Hainan Xinhai Labor Service Company submitted 21 "Payment Applications" and visas in June;

(6) In the evening, Sun Shusen and Zhang Zhenyong entertained all employees, and for the return Qiong 4 people took over the situation and gave relevant confidentiality instructions on the decoration settlement of the sales office.

(3) 6?24(1) Zhang Tao collected and compiled relevant company documents from May 6th to June 22nd and gave them to Sun Shanxiu to read, so as to make the work connection after returning to Qiong as soon as possible;

(2) Engineer Wu Zehua of the Budget Office moved from the Engineering Department to the office of General Manager Peng Chao;

(3) Went to Sanya at 9 a.m. and contacted to purchase the Hainan copy of Glodon Software, 3 p.m. Click back to Baoting; (Sun Shanxiu originally brought Shandong with Glodon Software in May, but forgot to bring it back).

(4) At 4 o’clock in the afternoon, Sun Shanxiu reported to Zhang Zhenyong that the progress of the project in May-June was not fast and that he believed that there should not be a 6-17 shutdown problem. General Manager Zhang Zhenyong instructed Sun Shanxiu to prepare a document to improve the construction of Building C. notification. It is required to go all out to improve the construction of Building C, and the completion of Building AB will be handed over to the engineering department for construction arrangement. Sun Shanxiu told Mr. Zhang: "The engineering department personnel have arrived, and I will be responsible for the construction of Building C. I am afraid something will go wrong." ?Mr. Zhang instructed: ?You listen to me. ?

(5) Sun Shanxiu called Mr. Liu for instructions: The General Engineering Office is responsible for improving the construction of Building C.

(6) Zhang Tao forwarded Hengtong Company's "Report on the Owner's Acceptance of Building C".

Two: From June 25th to 27th, the established goal of improving the construction of Building C will be established on June 25th, and necessary quality inspections will be carried out to ensure that the construction of Building C is safe and sound

( 1) June 25 (1) The General Engineering Office moved to the office of General Manager Peng Chao; Zhang Tao compiled the documents for the relocation of the General Engineering Office;

(2) The General Engineering Office issued a document in the name of the company "About improving the work as soon as possible" "Notice on Related Issues of Building C Project", establishing "6-25 set goals for improving construction". And entrust the implementation of the main acceptance.

(3) Sun Shanxiu, engineer Wu Zehua of the Budget Office, went to Hengtong Company to borrow Glodon software;

(4) Engineer Song Yanlin of the Engineering Department reported that the drainage pipeline passing through the eastern section of Building C needs to be demolished Regarding the issue of setting up a pump room, Sun Shanxiu made an on-site decision: In order to ensure the perfect implementation of the goal of Building C on June 25, a settlement joint was set up on the ground on the east side of Building C, and he called General Manager Zhang Zhenyong for approval.

(5) Sun Shanxiu briefly reported the work in Shandong to General Manager Sun Shusen and asked for instructions on the next step; Mr. Sun instructed you to know the situation better for the first-phase settlement, so you must handle the first-phase settlement?

(6) Preliminary review of Hainan Haixinhe Labor Service Company's 6.23 "Payment Application" and "Construction Visa",

Because the visa was too watery and four people from the engineering department had signed it, it was returned. It is difficult to make changes, so we decided to wait for the second phase settlement to be processed together;

(2) 6-26 (1) Communicate with Haijin Supervisor Wang Yanfang Manager on 6-25 to improve the set goals of building C construction Opinions;

(2) General Manager Zhang Zhenyong met with Fei Hongmin and Sun Shanxiu at the General Engineering Office to arrange the work of the Engineering Department and the Budget Office;

Sun Shanxiu emphasized: On-site visas are required for all large-scale projects It is necessary to use the floor plan and construction method. If there is no way, you can negotiate the price or apply for another job.

(3) Engineer Song Yanlin from the Engineering Department forwarded the 6.23 "Project Visa Approval Form" of Jiuyuan Company, requiring rework of 6,800 yuan for water leakage in the settlement joint between Building AB, and Sun Shanxiu signed that it should be replaced according to the signed loss. Square area and actual practice?;

(4) Study 6.23 18 "Construction Visas" of Hainan Haixinhe Labor Service Company with Engineer Wu Zehua of the Budget Office

Issues with this visa There is too much moisture, sporadic labor costs 150 yuan/day, and the budget cannot approve the problem;

(5) Coordinate with Liu Yingjie to borrow and install Glodon software for engineer Wu Zehua of the budget office.

(3) 6?27(1) Sanya Quality Inspection Station came to the Wanpingjiayuan construction site to conduct main body inspection below the 16th floor of Building C. Sun Shanxiu and Zhang Tao of the General Engineering Office participated, and Liu Yingjie and Tong Gong of the construction party participated; Sun Shanxiu Send a text message to report the relevant testing situation to the relevant leaders;

Three: From June 28 to 30, transfer the closing project of Building AB that affects the construction of Building C, understand the whereabouts of the 6-23 funds, and ensure that 6?25 established goal? Proceed in an orderly manner

(1) 6?28 (1) Liu Yingjie reported to purchase bamboo racks for plastering the exterior walls below the 16th floor of Building C, and asked General Manager Zhang Zhenyong to approve the construction measure fee 10,000 yuan; Li Guangzheng and Liu Yingjie requested to allocate project funds. General Manager Zhang Zhenyong replied: "Tell Li Guangzheng to ask his elder brother for it." ?

(2) Liu Yingjie submitted the "Construction Schedule and Funding Plan" for the construction of Building C and the "Transfer of Building AB Closing Project

"; the General Engineering Office reported to General Manager Zhang Zhenyong manager.

(3) Sun Shanxiu sent a text message to General Manager Sun Shusen and Zhang Zhenyong to report the testing methods of Sanya Quality Inspection Station: rebound, carbonization, and scanning. The quality inspection department informed that the rebound was unqualified. Only if there is any dispute between Party A and Party A will the core be taken for inspection. Zhang Zhenyong

The general manager’s instructions: For safety and security, conduct core inspection to ensure nothing goes wrong. ?

(4) General Manager Zhang Zhenyong summoned Sun Shanxiu and temporarily arranged to allocate 90,000 yuan to Hainan Haixinhe Labor Service Company.

The company’s 18 "Construction Visas" were returned by General Manager Zhang The construction unit is rearranged.

(5) Engineer Song Yanlin of the Engineering Department submitted the "Application for Contracting the Price of the Hardening Construction of the Phase II Courtyard Wall and the Front Door of Building C". Sun Shanxiu approved that the roads and walls should be in accordance with the plan. , section, construction practice management, sporadic use

Labor implementation of Hainan Province Comprehensive Construction Quotas" General Instructions Item 12 and Hainan Province January 2010

Unit price of labor costs from January 1 implement. When it came to the inappropriate labor charge of 150 yuan per working day for odd working days, did you have work friction with Engineer Song Yanlin?

(6) Convey it to Liu Yingjie and report to General Manager Zhang Zhenyong Report on Mr. Liu’s instructions: Ensure that the set goal of 6?25 is achieved before the Chinese Valentine’s Day Water Festival

.

(7) Zhang Tao went to Hengtong Company with Song Gong from the Engineering Department to handle the handover of floor tiles in Building AB, but failed.

(8) Engineer Yang Tongguo from the Engineering Department sent the "Fire Door Budget Book" requesting review and signing of the contract, and the General Engineer Office approved it.

(2)6,29(1)Mr. Liu and Mr. Sun called to inquire on 6-27 how to improve the quality inspection of Building C and whether the one-month task can be completed

?Problems, Sun Shanxiu reported to Mr. Liu and Mr. Sun respectively. Sun Shanxiu reported that the funds allocated by Hengtong on June 23 were transferred to Shandong and were not used on the project according to the plan. The channels for improving the construction funds of Building C were not smooth. General Manager Zhang Zhenyong was in a difficult position. Reporting on the situation, Mr. Liu instructed that the funding guarantee should be appropriately tilted towards the construction unit.

(2) Engineer Song from the Engineering Department requested to contact Hengtong Company to deal with the putty problem on the exterior wall of Building A;

(3) 6?30(1) Engineer Song from the Engineering Department requested to coordinate with Hengtong Company The company handles the relevant issues before the installation of the elevator shaft and the issue of the elevator being changed to enter the site on July 25;

(2) Engineer Yang Tongguo from the Engineering Department reported to Nandun Company the requirements of the "Wanpingjiayuan Smoke Exhaust System Budget Book" Increase the contract cost, check the contract terms, the smoke exhaust system is within the scope of the contract, return it.

(3) Sun Shanxiu submitted Sun Shanxiu and Zhang Tao's "Attendance Form for June 15-22" and "Employee Monthly Work Report Form" to the office;

(4) 10 p.m. Xu Sunshanxiu reported to General Manager Sun Shusen and Zhang Zhenyong via text message: Sun Shanxiu also?

Four: On July 1-2, the construction fund guarantee channels will be cleared and improved, and the July 2nd Improvement Building C Construction Promotion Meeting will be held. Countdown to implementation of the 6-25 established goal

(1) 7-1(1) Liu Yingjie supervised the improvement of the construction project funds of Building C; and suggested ensuring the improvement of the funding method for the construction of Building C. Sun Shanxiu promptly contacted Zhang Zhenyong The general manager requested instructions and reported to determine and improve the construction fund guarantee method;

(2) "Sun Shanxiu and Zhang Tao's Work Report from May to June" was published in Sun Shanxiu's "NetEase Blog Log" column and published

Text General Manager Wang Xirong to report to Mr. Sun, Zhang Tao fax Jinan to report to Mr. Liu; meet Mr. Zhang and Mr. Peng in person.

(3) Visa for Jiuyuan-013#. After discussing with Engineer Song of the Engineering Department, the cost of repairing the decoration surface due to water leakage from the settlement joint was agreed upon from 6,800 yuan to 3,400 yuan, and was handed over to Engineer Wu Zehua for settlement.

(Two) 7-2(1) Sun Shanxiu met with Manager Wang Yanfang of Haijin Supervision Company in the morning, and asked Manager Zhang Zhenyong for instructions over the phone regarding the issue that the engineering department did not accept the supervision information and the supervision fee for May-June. The manager responded and negotiated with him to improve the construction of Building C and reached a consensus.

(2) At about 9 o'clock, Sun Shanxiu sent a text message to ask for instructions and report and to supervise the construction: Mr. Sun, Mr. Zhang and Guangzheng: Improve Building C

There is no room for delay in the construction. There are 28 days until 7:30, and it is rainy. Construction cannot be slacked off, and funds are guaranteed

It is better to do it sooner rather than later. Good repair? Mr. Liu gave instructions on the phone: "This issue is very important. Please discuss it with Mr. Zhang as soon as possible.

?

(3) At about 10:30, Mr. Zhang gave instructions on the phone: ? Inform Liu Yingjie to submit the arrears of wages for approval as soon as possible, and drill core testing must be carried out simultaneously;