Joke Collection Website - Public benefit messages - Qingdao new house decoration steps

Qingdao new house decoration steps

Qingdao new house decoration steps

How to decorate the new house in Qingdao? The following detailed steps and processes of Qingdao's new house decoration, as well as the detailed contents of Qingdao's new house decoration steps, will show you how to decorate Qingdao's new house:

1, Qingdao house decoration process

Pre-design-main body demolition and renovation-hydropower renovation-carpentry-tiling-wall painting-water heater installation-kitchen and bathroom ceiling-cabinet installation-range hood installation-wooden door installation-floor installation-wallpaper paving-switch socket installation-lamps installation-hardware sanitary ware installation-curtain rod installation-

2, Qingdao house decoration steps

(1) Demolition and reconstruction of the main body

Demolition and reconstruction mainly include tearing down walls, building walls and shoveling wall skins. The renovation step of Qingdao new house is the main demolition and renovation project, so special attention should be paid to the construction, and the bearing wall cannot be demolished and renovated. At the same time, attention should be paid to completing the demolition and reconstruction of the main body before the hydropower transformation.

(2) Hydropower transformation

Hydropower renovation is a key step in the renovation of new houses in Qingdao. Attention must be paid to the direction of waterways and circuits in hydropower transformation. At the same time, in the process of hydropower transformation, we should pay attention to the installation position of the switch socket behind, such as the position of the lampblack machine socket and the position of the water meter, which are inconvenient places for people in the future.

(3) Woodworking engineering

Woodworking includes not only making ceilings and wardrobes, but also doing carpentry such as vertical pipes, decorating ceilings and sticking plaster lines. The main work of carpenters entering the site is to re-level the ceiling, doors, door covers and wardrobes.

(4) Tiling

Ceramic tiles include wall tiles and floor tiles. Pay attention to the installation of doorstones and marble windowsills, as well as the installation of floor drains when sticking bricks. After the bricklaying work is completed, it is necessary to prepare for the installation of the kitchen range hood, and then the painting project.

(5) Paint the wall

The coating of wall paint mainly completes the basic treatment of wall surface. The steps of painting the wall paint are mainly leveling, grinding and rolling. In construction, we must pay attention to the color of wall paint. After all, the wall accounts for the proportion of the whole decoration area. If the color of wall paint is chosen well, the whole home improvement effect will be better.

Note: The above is an introduction to the renovation steps of new houses in Qingdao. Decoration is a troublesome thing. For owners who have little experience in the initial decoration, it is recommended to choose a reliable decoration company to decorate, and do not install it yourself, otherwise it will be very difficult.