Joke Collection Website - Public benefit messages - Agreement on Safe Electricity Use in Rental Houses

Agreement on Safe Electricity Use in Rental Houses

Agreement for safe use of electricity in rental housing (6 general articles)

In real society, men, women, old and young may need to use the agreement. Signing the agreement can solve or prevent unnecessary disputes. Many people must be worried about how to write a good agreement. The following is a safe electricity use agreement for rental housing that I have carefully compiled (6 general articles). You are welcome to read it. I hope you will like it.

Agreement on Safe Electricity Use in Rental Houses 1

"House Lease Contract" No.:

Lessor:

Lessee: < /p>

After negotiation between the two parties, it is agreed that the lessee will lease the area for: , and the lease term is *** one year. In order to clarify the rights and obligations of both parties, this supplementary agreement is signed. The specific terms are as follows:

1. During the performance of the lease term of this contract, if the lessee encounters any problems with the house rented by the government department and the lessor regarding the leased house, In the reorganization plan, the lessee must move unconditionally within 10 days from the date when the lessor issues or receives the "relocation notice" from the lessor. From the 11th day after the lessor issues or delivers the relocation notice to the lessee, the house rental contract signed by both parties and these supplementary terms are terminated. The lessee shall compensate the lessor for losses at three times the rental price for every day of delay in moving. , at the same time, due to the termination of the contract, the lessor terminates its obligations to provide the lessee with rental housing, provide power and water supply to the rental housing, and provide access conditions, etc.

2. All fire safety responsibilities during the lease period shall be borne by the lessee. The lessee must install public fire protection facilities and equipment in accordance with fire management regulations. The rented site is equipped with 2 fire extinguishers for every 30 m, and an additional fire extinguisher must be equipped for every 20 m. Fire extinguishers are required to be placed in the correct position and are strictly prohibited from being placed randomly.

3. The lessee guarantees: The lessee and the customer guarantee not to smoke in fire escapes, stairwells, corridors and other public places. If there is any violation, they agree to be punished in accordance with the regulations of the "Fire Protection Law". The lessee shall be solely responsible for any losses caused by a fire caused by the lessee's personal reasons or other reasons during the rental period.

4. The lessee must keep the fire extinguisher in the rented house free of dust and the pressure is up to standard. Ensure that you and your employees can operate and use fire-fighting facilities and master the four abilities of fire-fighting.

5. The lessee shall implement business hours in accordance with relevant regulations of the municipal government.

6. Merchants are strictly prohibited from staying in rented buildings.

7. If the lessee wants to stack goods, he should set up shelves to keep a distance of 20cm from the ground, a distance of 20cm from heating packages, pipes, and walls, and a distance of 20cm from meter boxes, power control switches, lamps, and gates. Circuit facilities such as knives should be kept at a distance of 50cm. If the lessee fails to set up a warehouse in accordance with the agreement and causes losses to himself or others, the lessee shall bear all liability for compensation.

8. The lessee must comply with the requirements of the relevant departments and the lessor when making and using the door plaque of the rented house. Violators will be forcibly removed.

9. The lessee should do a good job in repair and maintenance of the house during the lease period. If there is an accident such as roof leakage, house collapse, flooded goods, personal injury, etc., the renter will not bear any responsibility.

10. The lessee shall not damage the building facilities at will during the lease period. If you want to carry out various constructions such as interior decoration and door renovation on the rented house, you must report to the fire department and the construction can only be carried out with the approval of the fire department.

11. The lessee must carry out pipe protection for the indoor circuits and wires of the rented house in accordance with the requirements of fire safety regulations; sockets and plugs must be intact; sockets, plugs, gate knives, etc. must be installed in the standard to ensure In a safe position, it is forbidden to use the blade without cover or the bare wire of the plug in contact. Power line specifications must match the power used according to technical requirements. Tenants are prohibited from using high-power electrical products and overloading of electricity is strictly prohibited. If the lessee violates this agreement and causes losses, the lessee shall bear all liability for compensation.

12. During the lease period, the lessee is responsible for three guarantees in front of the door, including sanitation and cleaning, ice and snow removal, public security and stability maintenance, etc.

13. If the lessee needs to add three-phase electricity or high-power electrical appliances (such as air conditioners, etc.), he must report the electricity to the lessor for approval, and only after comprehensive consideration can the installation and use be carried out. If approval is not followed according to the procedures, they will be dismantled.

14. The lessee must abide by the "Electricity Law", use electricity safely and legally, and must not steal electricity or remove the seal without permission.

15. After the lease expires, if the lessee does not renew the lease, the lessee shall inform the lessor one month before the expiration. After the expiration of the contract, the lessor shall inspect and accept the house and no liquidated damages and damages shall be owed. The deposit can only be refunded after paying relevant fees, otherwise the deposit will not be refunded.

16. The lessee is not allowed to sublet the house privately. If he needs to change the contract, he must go to the market office to go through the change procedures. If the lessee sublets the house without the lessor's written consent, the house rental contract signed by both parties and these supplementary terms will be terminated, and the lessor will take back the house.

17. It is strictly prohibited to occupy or block fire escapes. The lessee is not allowed to place, stack or process any items outside the rented premises.

18. During the lease period, the lessee is responsible for the security, fire safety, water and electricity safety and comprehensive management of the rented house. The lessee must unconditionally accept and cooperate with the lessor and relevant departments for routine fire protection. Conduct electrical safety supervision and inspections and health inspections, and actively cooperate with rectifications based on the problems identified by the inspection department. The lessee will be responsible for the consequences of failure to cooperate. If you fail to make rectifications as required by the fire department, you will voluntarily accept the fire department's closure and financial penalties.

19. During the lease period, the lessee shall not change the nature of the business without the written consent of the lessor; the lessee shall not privately sublet or transfer the rented house. If the lessee sublets the house without the lessor's written consent, the house leasing contract signed by both parties and these supplementary terms will be terminated, and the lessor will take back the house. If the lessee delays relocation, the lessee shall bear responsibility in accordance with Article 1 of these supplementary terms.

20. After the contract expires, the lessor has the right to adjust the price of the rental house.

21. The lessee will go to the industrial and commercial tax administration department to handle relevant procedures on the day the house lease contract is signed.

22. If the lessee violates the provisions of the "Housing Lease Contract" and these supplementary terms and causes losses to the lessor or others, the lessee shall bear the liability for compensation, and the lessor shall have the right to unilaterally terminate the lease contract; If losses are caused, the lessor shall be ordered to make corrections. If the lessee fails to make corrections, the lessor shall have the right to unilaterally terminate the lease contract.

The lessee has carefully read the above terms and strictly abides by and implements the above provisions. This agreement shall come into effect upon signature and seal by both parties.

This Supplementary Agreement is made in triplicate, with Party A holding two copies and Party B holding one copy.

Lessor (Chapter):

Legal representative:

Telephone:

Agreement on safe electricity use in rental housing on the day of 20 2

Party A (lessor):

Party B (lessee):

In order to standardize house rental behavior and strengthen house rental safety management, according to the "Contract In order to ensure the safe use and management of rental houses, this agreement has been formulated by Party A and Party B on the basis of equality and voluntary consultation in accordance with the provisions of laws and regulations such as the "Lease of the People's Republic of China" and the "Measures for the Administration of Urban Housing Leasing". :

1. Safety management in this agreement refers to the use performance, fire protection, public security and sanitation management of the house.

2. The lessor of a house shall be a natural person, legal person or other organization that owns the house.

Houses under any of the following circumstances shall not be rented out:

(1) Failure to register and obtain a real estate certificate in accordance with the law or without other legal ownership lighting;

(2) Owner-occupied houses without the written consent of all owners;

(3) Changing the use of the house requires approval from relevant departments according to law but without approval;

(4) Houses that are identified as dangerous and illegal buildings;

(5) The internal structure of the house is modified or re-divided without authorization, and is not divided into separate rooms;

(6) There are hidden dangers to the safety of the house (no windows or doors and windows are too small, aging wires, flammable, explosive, highly toxic substances or liquefied gas barrels piled indoors, etc.);

(7) Corridors, Aisles, etc. do not meet the basic requirements for fire safety and public security management regulations, making it difficult to evacuate people;

(8) Failure to meet the conditions related to safety, environmental protection, and sanitation regulations;

(9) ) Other situations where leasing is prohibited according to laws and regulations.

3. Obligations and Responsibilities of the House Lessor

(1) The lessor of private residential houses must hold the house ownership certificate or other legal house certificates, identity certificates, etc. before submitting to Party B Renting houses;

(2) The lessor of private residential houses should have certain management capabilities. If the lessor does not live locally, he should appoint an entrusted manager;

(3) With non- Rented houses should have separate entrances and exits or take measures to separate them;

(4) Lessors of private residential houses should pay taxes in accordance with the law;

4. Obligations and responsibilities of house lessees

p>

(1) The lessee shall not change the use of the house or build any unauthorized buildings in the rented house; (2) The lessee shall not use the rented residential house to carry out illegal and criminal activities.

5. Safe use management

For the residential use of leased houses, both the lessor and the lessee should be aware of safe use.

The safety management requirements for the lessor are:

(1) The lessor should post an escape diagram in the foyer of the public area and room on each floor. Rental housing shall not change the original building divisions and partitions, and the building stairs and evacuation escape routes must be safe and smooth.

(2) Each public floor of a rental house should be equipped with a set of fire extinguishing equipment (water foam fire extinguisher or ABC dry powder fire extinguisher); for brick and wood structures with three floors or above, simple installation is recommended Water sprinkler fire extinguishing facilities and additional escape descenders.

(3) The electricity distribution of the rental house should be consistent with the lessee’s electricity consumption. Electrical lines must be laid through pipes, and power sockets must not be installed directly on combustible equipment.

(4) House lessors should conduct safety inspections on rented houses, implement fire prevention and anti-theft measures, eliminate potential security risks in a timely manner, and ensure the residential safety of tenants.

Basic requirements for house lessees include:

(1) No processing, configuration and other production operations with fire hazards shall be carried out in the rented residential house, and flammable materials shall not be stored For explosive and other chemical dangerous goods, high-power electric heating appliances are not allowed, and open flames are strictly used for lighting and heating.

(2) Master basic fire prevention and fire-extinguishing knowledge, be familiar with the evacuation and escape routes of your residence, be able to call the police, and use fire-extinguishing equipment; you must not connect or pull wires indiscriminately, or overuse electrical appliances;

< p> (3) If the lessee discovers that there are unsafe factors inside the house, he should promptly notify the lessor and require them to eliminate them.

6. Management of Public Parts

If any unsafe factors are discovered in the public parts of adjacent or same buildings, the lessee shall notify the tenant immediately. The lessor shall notify relevant units or individuals to take immediate measures to eliminate hidden dangers.

7. Liability for breach of contract

If one party fails to perform its obligations under this agreement and causes property losses or personal injuries to the other party or a third party, it shall be liable for compensation in accordance with the law.

8. This agreement is an attachment to the house rental contract and has the same legal effect as the house rental contract.

9. Dispute Resolution Methods

When a dispute arises under the contract, both parties shall negotiate amicably. If negotiation fails, both parties may submit the dispute to the Chaoyang District People's Court for adjudication.

10. This agreement is made in duplicate, each party holds its own copy, and it is equally valid. Agreement on Safe Use of Electricity in Rental Houses 3

Party A:

Party B:

In order to ensure the safety of the rental electric well during use and safeguard the rights and interests of both parties. Party A and Party B sign this agreement on the basis of the principles of equality and voluntariness. Party A and Party B shall strictly abide by the rights and obligations stipulated in this agreement and ensure construction safety at the construction site.

1. Rights and obligations of Party A

1. Party A is responsible for the power supply.

2. Party A has the responsibility to conduct regular or irregular inspections of Party B. If any hidden dangers or illegal operations are discovered, Party A must instruct Party B to make rectifications and supervise the implementation of the rectifications.

3. Party A is not responsible for any illegal operations or man-made safety accidents during use.

2. Party B’s rights and obligations

1. Party B is responsible for the management of the safe production of the motorized well and is responsible for daily repair and maintenance costs. Party B must send a dedicated person to the site where the motorized well is used. , supervise use.

2. Party B is responsible for the safety of the site when using the machine shaft. If any third party is injured or killed while using the machine shaft, Party B shall bear the responsibility except for the third party responsible according to law.

3. Party B shall try its best to mediate claims arising from work-related injuries and deaths and report them to Party A in a timely manner, and Party B shall bear the relevant compensation costs.

4. Party B shall ensure the safety of water quality and strictly control water source pollution during use.

This agreement will take effect from the date of signature and seal, and the agreement will be made in duplicate.

Signature of Party A:

Signature of Party B:

Date: Agreement on Safe Electricity Use in Rental Houses 4

In order to strengthen the use of electricity in schools Safety work, enhance teachers' awareness of electricity safety, ensure the safety of school property and the lives of teachers and students, and ensure the smooth progress of education and teaching in the school. According to the relevant requirements of the District Education Bureau on safety work, the "Limin No. 1 Middle School" is specially formulated. Electricity Safety Responsibility Letter:

1. Strictly follow the electricity safety procedures to complete various electrical work, and do not install or connect wires without permission.

2. Dedicated personnel should be assigned to the power supply and electrical appliances in each office. They should be turned on when in use and off when not in use. Especially after school and holidays, special inspections should be carried out to ensure that nothing goes wrong.

3. Without the approval of the school, no one is allowed to change the route or make random remarks. For those who install without permission or mess around, the school will investigate the responsibility of the parties concerned and impose financial penalties.

4. Use electricity in strict accordance with the electricity usage regulations. Whoever is in charge will be responsible, and whoever uses electricity will be responsible. If a safety accident occurs, the parties involved will be held accountable for all responsibilities.

School signature (seal):

Date: Agreement on safe use of electricity in rental housing 5

Party A:

Party B:

In order to strengthen safety production work, effectively implement the safety production responsibility system and safety technical measures, and ensure the occupational health, mechanical equipment safety, temporary power safety, etc. of workers in joint venture units, Party A and Party B clarify the safety management responsibilities and obligations in this agreement.

1. Responsibilities and obligations of Party A

1. Establish a safety production organization for construction projects and equip full-time safety management personnel.

2. Supervise the personnel of the joint venture units to conscientiously study and implement safety technical regulations, specifications, and standards; urge the joint venture units to educate workers on production safety and check the status of certificates for special types of work.

3. Based on the characteristics of the construction, make practical safety technical disclosures, perform the signing procedures of both parties and strictly implement safety technical disclosures, implement safety measures, and supervise their implementation.

4. Adhere to regular and frequent safety production inspections, promptly propose rectification suggestions to Party B or issue time-limited rectification notices to Party B for discovered safety hazards, and supervise their implementation.

5. Supervise electricians and mechanical equipment maintenance personnel of joint ventures to perform operations in accordance with the requirements of the "Technical Specifications for Safety of Temporary Electricity Use at Construction Sites".

6. Pay attention to the unsafe factors raised by joint venture units, clarify responsibilities, and solve them in a timely manner. If they cannot be solved, they must be reported to the superior unit in a timely manner to avoid taking risks and illegal construction with hidden dangers.

7. Inspect and supervise the implementation of safety measures by joint venture units and do a good job in various safety protection work on site.

2. Responsibilities and obligations of Party B

1. The joint venture should establish and improve a safe production organization, equip full-time and part-time safety officers, and implement a safety education system.

2. All workers should abide by relevant regulations such as the "Safety Technical Regulations for Construction Construction", "Safety Technical Regulations for Temporary Electricity Use in Construction", "Safety Technical Regulations for Work at Height in Construction", etc. Carry out civilized construction and put an end to barbaric construction.

3. All workers should abide by Party A’s various management systems and standards in terms of production safety and submit to Party A’s management; conscientiously implement national and government guidelines, policies and regulations on production safety.

4. The construction site should focus on the following aspects:

(1) Use safety protective equipment (tools) such as safety helmets, safety belts, and safety nets as required;

p>

(2) Mechanical equipment protection devices must be complete and effective, all machinery must be repaired and maintained in a timely manner, and "sick" operation is prohibited.

(3) On-site electricity consumption must comply with the requirements of the "Technical Specifications for Temporary Electricity Use Safety at Construction Sites". Three-level power distribution and three-level protection must be adopted. Standard switch boxes should be used. Fixed distribution boxes should be equipped with Fences and measures to prevent rain and damage. Electrical equipment must adopt the TN-S system and set up a dedicated protective neutral line. Electric machinery and electric hand tools must be equipped with leakage protection devices, one machine, one box, one gate and one protection. Maintenance and inspection of machinery and power tools should be left to professionals.

(4) The electric welding machine should use a special switch box. The length of the primary line should be less than 5 meters and the length of the secondary line should be less than 30 meters. The wiring on both sides of the welding machine should be firmly crimped and a reliable protective cover should be installed. Weld the double wires in place. Special cables should be used for welding wires, and the lines should be well insulated and not damaged or exposed. Welding machines are equipped with special protection against electric shock.

(5) Scaffolding materials and scaffolding erection must comply with specification requirements and construction plans. If a mobile operating platform is used, the operating platform must have a certificate.

(6) It is strictly prohibited to enter the construction site barefoot or wearing high heels or slippers; hard-soled and slippery shoes are not allowed to be worn when working at heights, and working under the influence of alcohol or medication is strictly prohibited.

(7) Electricians, electrical welders, scaffolders, various motor vehicle drivers and other special types of work must hold certificates to work and undergo regular physical examinations according to the needs of the position.

(8) Adhere to the pre-shift speech system, daily safety inspection, and follow-up inspection system to eliminate safety hazards in a timely manner.

(9) Cooperate with Party A in various safety inspections and rectify the problems raised as required.

3. Party A and Party B

Should consciously fulfill the above-specified terms and strictly supervise and inspect according to the responsibilities assigned by this agreement to ensure the safe and smooth progress of construction production. Anyone who violates the provisions of the above agreement, fails to perform his or her duties and obligations, and causes casualties or accidents shall be held responsible by the responsible party.

4. This agreement is signed by the responsible persons (representatives) of Party A and Party B and stamped by the unit.

Party A (seal):

Party B (seal):

Signature of Party A’s representative:

Signature of Party B’s representative:

Date: Agreement on Safe Use of Electricity in Rental Houses 6

Party A: _______ (hereinafter referred to as Party A)

Party B: _______ (hereinafter referred to as Party B) < /p>

In order to strengthen the safety and management of temporary power consumption at the construction site, so that the temporary power supply system on site can operate in the best condition under rated capacity, various electromechanical protection devices are effectively maintained and maintained so that they can perform their applications. It has certain protection functions to prevent various electrical accidents from happening. Clarify their respective responsibilities, rights and obligations, and sign the following agreement after consultation and agreement by both parties:

1. Party A and Party B must conscientiously implement the laws, regulations and rules related to safety production in the use of electricity.

2. Party B must obey Party A’s electricity management. When entering the site and before putting it into use, Party B shall conduct inspection and acceptance with Party A, and it can only be put into use after mutual agreement. If there is an equipment failure that endangers the operation of the system during use, use should be stopped immediately and reported to Party A for record. No power should be turned on for trial operation until the fault is completely eliminated.

3. Party A is responsible for providing power to Party B. When connecting the power, it must be connected according to the location designated by Party A, and no unauthorized connections are allowed.

4. Party A has the right to inspect the safety of electricity in the construction area, issue a written hidden danger notice (should be signed by both parties) to Party B for unauthorized connections, violations and serious violations, and make rectifications within a time limit. If the deadline is not changed and there is no justifiable reason for delay, Party A has the right to stop Party B from using electricity.

5. If any accident occurs during Party B’s construction, all safety responsibilities shall be borne by Party B and shall have nothing to do with Party A.

6. The electricity consumption shall be based on the electric meter and shall be settled after confirmation by both parties. The electricity price is calculated at 2 yuan per kilowatt hour, and Party B will pay the entire electricity bill to Party A in one go within 15 days after the power supply is terminated.

7. This Agreement is made in duplicate. Party A and Party B each hold one share.

Party A: _______

Person in charge (signature): _______

Date: __month__day, 20__

Party B; _______

Person in charge (signature): _______

Date: __month__day, 20__;