What documents do you need to close the house?
2. The developer shall provide the completion acceptance record form, residential quality guarantee, residential instruction manual (these three items must be original) and technical report on housing and land surveying and mapping, which shall be explained by the developer.
Matters needing attention in closing the house
1, whether the ground is flat or not.
The flatness of the ground is often overlooked. Don't underestimate the flatness problem. There may be a height difference of 3 cm in the same room. If you level yourself, you will consume a lot of cement and gravel and waste the height of the house. It's a big loss.
2, floor drain drainage unobstructed.
When building a house, a lot of cement blocks and gravel easily fall into the floor drain and drainage pipe, causing serious blockage, which will be very troublesome to find again after moving in. We just need to pour a bucket of water in a small bucket we carry with us and see the speed of the water flow to judge whether it is blocked or not. Generally, it is necessary to open the manhole of the drain pipe from the neighbor's house downstairs to clean up the sediment. It will be difficult to coordinate if the neighbors downstairs finish decorating and seal all the drainage pipes. Even if the neighbors compensate for the cost of re-closing the drain downstairs, they may not be willing to do it.
3. Is there a fire ring installed in the toilet sewer?
In fact, everyone has never heard of this kind of fire ring, but it has a great effect. The fire ring is installed at the top of the sewer pipe. There is a fire in the neighbor's house downstairs, and the fire may spread upward along the sewer pipe. At this time, the fire ring will automatically expand when heated, and the sewer pipe will be crushed and broken, completely sealing the passage where the fire spreads. This kind of fire ring can play a key role at a critical moment, so don't ignore it.
4, do a good job in waterproof experiment
General developers will do a waterproof, we have to do is to test the waterproof quality for developers. Experienced people will block the sewer pipe in the bathroom, then put a certain height of water and seal it for more than 3 days, and test the waterproof quality by whether the water level drops.
5. The doors and windows are in normal use.
The quality of aluminum alloy windows installed by general developers is poor and there are many problems, so we must check them carefully. Mainly check the air tightness of the window, and the sealing strip is the key. And whether the window can be opened and closed normally.
6. Is the area of the new house consistent with the contract?
Generally, the decoration company is invited to design, and the designer will measure the house. At this time, it is just right to check whether the actual area of the house is consistent with the housing acquisition rate promised by the developer. Generally, it is normal to be within 3%. More than 3% can be compensated to the developer.
- Related articles
- How to send a violent reminder message?
- What is the daily news hotline number of qtv?
- Short New Year greetings on the first day of the Lunar New Year
- Heart-warming good morning wishes
- Can I issue a special VAT invoice for simple collection?
- Contents of epidemic prevention mental health handwritten newspaper
- How to grab tickets with Xiu Dong. How to grab tickets with Xiu Dong to increase the success rate.
- Short message blessing phrase
- How to play April Fool's Day?
- Hunan 202 1 6 query time?