Civilized construction is the window of an enterprise and a symbol of its improvement of social image, so it has attracted much attention. This manual mainly explains the aspects of gates, fences, roads, material storage, office areas, living areas, canteens, toilets, shower rooms, dust and noise control, publicity boards, and civilized construction through a combination of pictures and texts.
3.1.1 On-site planning
Before the start of the project, carry out targeted civilized construction management planning based on the actual situation on site, and form a planning document or site layout plan to ensure civilized construction on site Management and control content is fully demonstrated.
The main content of on-site planning includes: selecting entrance roads, enclosing construction areas, selecting office areas, selecting living areas, selecting material storage and processing sites, arranging water source access points, and arranging power (network) connections. When entering points, arranging temporary construction roads, vehicle turning sites, etc., each area needs to consider the site area at the same time to ensure that construction and living needs are met.
The following principles must be followed when laying out each area:
1) The layout should be scientific and reasonable, and the construction site should occupy a small area.
2) Organize transportation reasonably and minimize secondary handling.
3) Meet the requirements of the overall construction deployment and construction process, and reduce mutual interference.
4) Make full use of existing buildings and reduce temporary construction costs.
5) Temporary facilities should be convenient for life and production, and the living area, office area and production area should be separated.
6) Meet the requirements of energy conservation, environmental protection, safety and fire protection.
3.1.2 Site layout
3.1.2.1 Site gate
The gates and doorposts at the construction site should be strong and beautiful, with a height of not less than 2m, and marked with the company logo. If conditions permit, access control systems and computer monitoring can be used (Figure 1 is the rendering of the construction site gate; Figure 2 is the elevation of the construction area gate).
3.1.2.2 Guard Room and Safety Warning Mirror
The guard room is located inside the gate and uses color steel composite panel walls. Establish a safety and security system on site and arrange special personnel for inspection; implement an entry and exit registration system, non-staff are prohibited from entering, and safety helmets are issued to outside service personnel.
A safety warning mirror is set up at the entrance to remind workers to pay attention to safety at all times and wear safety equipment in strict accordance with regulations (Figure 3 is the rendering of the guard room and warning mirror; Figure 4 is the plane and elevation of the guard; Figure 5 is the warning mirror).
3.1.2.3 Site Fence
The construction site shall be managed in a closed manner. The fence shall be strong and tight, with a height of not less than 1.8m, and the main urban road sections shall not be lower than 2.5m. The fence material should be made of special shaped plates or blocks. It is strictly prohibited to stick, graffiti or post randomly on the wall (Figure 6 shows the fence construction drawing).
3.1.2.4 Main roads
The main roads on site will be hardened according to actual conditions, regularly sprinkled with water to reduce dust, with a width of not less than 4m, and drainage ditches set up on both sides.
3.1.2.5 Picture board setting
Set a "project bulletin board" at an appropriate location outside the gate, and the bulletin board must be solid. The content of the bulletin board mainly includes the project name, project source, main construction tasks; construction unit, design unit, supervision unit, construction unit; project specific location, area and other data; renderings and other content.
The picture board is arranged inside the on-site gate. The graphics are rectangular, with a height-to-width or aspect ratio of 3:2 (see the board elevation for specific dimensions). They are made of straight plates and have unified specifications. Generally, projects are equipped with six cards and two pictures, namely: project overview card, management personnel list card, safety production card, civilized construction card, fire protection card, entry instructions card, site master plan, and project renderings. The specific number can be increased or decreased based on the actual situation, such as adding entrance notice boards, daily notice boards for dangerous operations, accident case boards, safety reward and punishment boards, publicity boards, newspaper reading boards, safety production calendar boards and engineering renderings, etc. There should not be too many signboards installed on site, and they should be mainly practical (Figure 7 is the rendering of the signboard; Figure 8 is the elevation view of the signboard).
3.1.2.6 Tooling
In order to establish and maintain a good social image of the unit, create a corporate cultural atmosphere, and achieve standardized management, construction site managers, construction personnel, etc. must uniformly wear uniforms according to seasons. Work clothes. (Figure 9 shows the renderings of workwear)
3.1.2.7 Badges
The construction site management personnel of the unit must wear badges in a neat and uniform manner. The badge is 100mm high and 70mm wide (Figure 10 is an illustration of the badge).
3.1.2.8 Safety helmets
Project management personnel, construction workers and guests must wear safety helmets of corresponding colors at the construction site in accordance with regulations. Safety helmets are uniformly configured by the unit and printed with a unified logo of the unit. (Figure 11 shows a special safety helmet)
3.1.2.9 On-site publicity slogans
The construction site should set up and hang publicity slogans in the construction area, office area and living area based on the actual situation to promote Regulations and standards on civilized construction management, and enhance employees’ safety awareness and quality awareness. Common slogan types include: corporate culture, safety, civilization and quality.
(1) Corporate Culture
Being honest, doing things seriously, harmonious entrepreneurship, scientific development
Integrity, quality, efficiency, diligence and thrift
Strive to build a prosperous, harmonious and happy geological and mining group!
Those who can do everything well within the scope of responsibilities are talents
The company sets a stage for the growth of talents, and talents provide power for the development of the company
Integrity is The foundation of an enterprise, quality is the life of the enterprise, efficiency is the source of the development of the enterprise, and diligence and thrift are the basis of the prosperity of the enterprise!
Especially able to endure hardship, especially able to fight, especially able to endure, and especially able to contribute
Unity creates strength, tension improves efficiency, seriousness ensures quality, liveliness brings passion
Innovation of ideas brings opportunities to enterprises, and scientific and technological innovation creates wealth for enterprises
Be vigorous and efficient, strive for excellence and high quality
Gather the positive energy of cadres and groups for entrepreneurial development, and establish a system where all employees strive to be the first to create Excellent Atmosphere
You must treat others with sincerity, and others will reciprocate with sincerity
Talents are those who can do everything well within the scope of their responsibilities.
(2) Safety
Carelessness is the bane of safety
Investigate and deal with safety hazards, promote safe production, abide by safety regulations, and achieve the safety of family and enterprise
p>
Strengthen the safety foundation and promote safe production
Everyone pays attention to safety, and everyone is safe
Ignoring safety means neglecting life
Safety first, Prevention is the first priority
Safety production is everyone’s responsibility
Safety production focuses on prevention
Safety production responsibility is more important than Mount Tai
Implement safety rules and regulations and strengthen safety precautions
It is better to go a hundred feet away than take a risk
Safety is the greatest savings, and accidents are the greatest waste
Spread safety culture and promote safety knowledge
Safety is an eternal theme in engineering construction
If one person violates the rules, everyone suffers
(3) Quality category
Only through strict process management can we build high-quality projects
Strengthen the awareness of quality life and create a quality first brand
A century-old plan, quality first
Strictly control quality Close, broad enterprise road
Promote quality education and enhance quality awareness
Strengthen quality management and build high-quality projects
Ensure project quality and benefit future generations
p>
Strengthen quality supervision and strictly control quality
Quality is the life of an enterprise, and safety is the life of employees
(4) Civilized category
Harmony produces strength, harmony produces wisdom, and harmony produces achievements
Use the system to manage people, act according to the system, and be a model of abiding by the system
Eliminate disasters and benefit the people
Create a civilized construction site and display the image of the city
Quality strives for survival, management produces benefits, science and technology strives for development
Create first-class performance and establish a new civilized trend
Strive to innovate , carefully constructed
Sorry for the inconvenience caused to you
Construction ahead, pay attention to safety
3.1.2.10 Office
Office , the conference room is uniformly laid out, equipped with air conditioning, water dispenser, connected to the Internet and telephone, and the project manager and "five major members" job responsibilities signs and construction progress plan horizontal bar charts are arranged in the office. Responsibility signs and bar charts are made of blue-background foam board. Responsibility signs are 900mm high × 600mm wide, and horizontal bar charts are 900mm high × 1350mm wide (or adjusted appropriately according to the actual situation; Figure 12 shows the responsibility placards)
Meeting The purpose of the interior decoration enterprise: strive to build a prosperous, harmonious and happy geological and mining group! Safety policy: safety first, prevention first, comprehensive management.
(1) Project manager job responsibilities
Conscientiously implement national guidelines, policies, laws and regulations on production safety, and implement the unit's rules and regulations.
Strictly implement the contract between the unit and the construction unit, and the unit and the project to ensure the realization of the contract objectives.
Rely on collective wisdom and strength to organize construction scientifically, and conscientiously implement technical measures and quality assurance measures in construction organization design to ensure the realization of quality objectives.
Establish and improve a strict job economic responsibility system, strengthen standardized management of construction sites, and complete construction tasks on schedule and with high quality.
Lead the project quality leadership group to carry out work, hold regular quality and safety meetings, organize quality and safety inspections and rectification of potential accident hazards.
Conscientiously implement superior instructions, accept supervision and guidance from the construction unit and superior departments, report work and provide various reports to superiors and construction units in a timely manner.
Responsible for the approval of documents generated within the construction site.
Focus on the construction of "two civilizations", cultivate entrepreneurial spirit, and develop corporate culture.
(2) Construction worker job responsibilities
Conscientiously implement the rules and regulations of the execution unit, and be responsible for the technical work of construction under the leadership of the project manager.
Before starting the project, you should be familiar with the drawings and materials, organize the disclosure records, assist the technical person in charge to complete the reasonable and scientific construction organization design and construction operation instructions, and submit them for approval before implementation.
Cooperate with the project manager to conduct specific and detailed technical disclosures for each type of work in the sub-projects based on the construction organization design and relevant specifications. The disclosures will be handed over in writing and signed by both parties.
During the construction process, each process should be reasonably arranged and supervised on site, and no one should leave his or her post without permission. General technical problems that occur during the construction process should be solved on the spot. In case of accidents or major technical problems, they should be reported to the project manager and technical person in charge in a timely manner, and solutions should be studied, and decisions should not be made without authorization.
A two-level measurement and release review system is implemented for the measurement and setting out. The lines are carefully set out before each process and retested during construction, striving to achieve zero error control and ensure project quality.
Provide quality and technical education to employees and promptly solve technical problems in the production process.
Participate in the investigation and analysis of quality and safety accidents, and propose appraisal opinions and corrective measures.
Carefully prepare construction logs and measurement records.
Cooperate with quality inspection personnel to perform quality inspections, do a good job in on-site production safety, and eliminate unsafe factors in production at any time.
Other responsibilities undertaken by the construction department.
(3) Quality inspector job responsibilities
Conscientiously implement the national quality laws, regulations, specifications and the unit's quality rules and regulations and the quality regulations of the superior department, and monitor the unit's project quality Responsible for inspection and supervision of work.
Participate in the research and analysis of technical measures and construction plans in construction organization design, and inspect and supervise the implementation.
Participate in regular quality inspections organized by the unit, be responsible for construction site inspections, rectify problems in a timely manner and keep records.
Anyone found to be violating operating procedures should be stopped immediately. Those who do not listen to dissuasion can be criticized and educated on the spot or suspended from work, and suggestions for punishment can be made to the technical person in charge.
Organize regular quality meetings on a regular basis to clarify responsibilities and authorities in process control, put forward requirements for next-step quality work, organize employees to participate in various quality activities, keep quality records, and report quality work to superiors.
Participate in supply inspection, perform process inspection, and participate in final inspection.
Responsible for inspection status identification, inspection, and management of experimental equipment.
(4) Job Responsibilities of Material Clerk
Earnestly learn knowledge about material procurement, be familiar with procurement procedures, reduce material costs, and improve economic benefits.
According to the needs of construction, prepare a material procurement list according to the procurement plan and report it to the project manager to ensure the procurement and supply of materials required for construction, with careful budgeting and neither misuse nor backlog.
When purchasing, purchase from manufacturers on the list of qualified suppliers, and purchase materials at the lowest price while ensuring quality. If there are quality problems with the materials, the supplier will be removed from the list of qualified suppliers and will not be hired for one year. .
Understand market conditions and product information, and promote and use new materials and new processes with good product quality and reasonable prices in a timely manner.
When purchasing, we must strictly control the quality of materials and strengthen the inspection and acceptance of materials. Purchased products must have factory certificates to avoid material problems that may affect the quality of the project. Responsible for handling the on-site material acceptance work and submitting various material certificates in a timely manner.
Supervise and inspect the use of on-site materials, assist construction workers to ensure civilized construction on site, be responsible for the application and management of large-scale turnover tools, inventory materials on a monthly basis, prepare reports, and report in a timely manner.
Responsible for fire safety work in warehouses, material yards, and construction sites, and conscientiously perform maintenance of small equipment and tools.
(5) Safety officer job responsibilities
Conscientiously implement the relevant safety production guidelines, policies, decrees and regulations of the superior authorities, and be responsible for safety inspection and comprehensive management of project safety work responsibility.
Responsible for the daily safety management of the department, establishing and improving the safety management network, and assessing the safety responsibility system.
Assist department heads to decompose safety responsibilities, sign a safety responsibility target contract with the team, and supervise its implementation.
Organize regular inspections and irregular spot inspections, rectify and implement the identified safety hazards.
Carry out safety education work, establish employee safety education files, mobilize employees to participate in safety activities, and assist in the training, certification and review of special types of work.
Participate in the investigation of safety accidents and the investigation and analysis of accidents, and do a good job in statistical reporting.
Carry out safety work such as transportation, storage, and protection, and keep records.
Participate in the preparation of construction organization plans. When preparing and reviewing construction plans, safety technical measures must be reviewed and formulated to ensure their feasibility and pertinence, and their implementation must be inspected, supervised, and implemented at any time. Preside over the formulation of safety measures plans and seasonal safety construction plans to promptly resolve problems arising during implementation.
Preside over the acceptance of safety protection measures and equipment, take timely measures if any abnormalities in facilities and equipment are found, and strictly control the putting into use of protective equipment and facilities required by unsafe standards.
Participate in safety production inspections and provide technical rectification opinions and methods to eliminate unsafe factors existing in construction. Participate in cooperating with investigations of work-related casualties and major near misses, and propose preventive measures.
(6) Document Clerk Job Responsibilities
Responsible for the collection, arrangement, filing, archiving and storage of project data; manage the collection, distribution and management of superior documents and internal documents Work.
Collect, transmit and feedback various project information, and report to leaders in a timely manner when necessary. Responsible for the collection, inspection and summary of various quality assurance data during the construction process.
Participate in the drawing review and be responsible for the sorting, issuance and borrowing of drawings, project visas, design changes and related technical materials. Recording, sorting, countersigning, copying and distribution of various meetings during construction.
Participate in relevant meetings and print and distribute records.
Sampling, sending for inspection, retrieval of results, reporting, and classified storage of various test blocks and test pieces during construction.
Keep a daily construction log.
Some other tasks assigned by leaders.
(Figure 13 shows the effect of the construction site office; Figure 14 shows the elevation and floor plan of the temporary office; Figure 15 shows the rendering of the conference room; Figure 16 shows the floor plan of the conference room and manager's office).
3.1.2.11 Dormitory
The floor of the dormitory should be hardened. Each dormitory should be equipped with a maximum of 4 bunk beds, and each bed should be equipped with a power plug.
Simple wardrobes and shelves for daily necessities are placed in the dormitory. Beds and bedding are provided by the unit and are kept and used by individuals. They must be clean and tidy, and management regulations and hygiene schedules must be hung.
The net height of the dormitory shall be no less than 2.7m, the width of the passage shall not be less than 1m, the bed area per person shall be no less than 2m2, daily necessities shall be placed neatly, and the room shall be kept ventilated.
The dormitory should be equipped with fire extinguishing equipment in accordance with regulations
(1) Workers’ dormitory management regulations
Hospital employees must obey the dormitory management regulations, and outsiders without permission will not be allowed to enter the dormitory. No accommodation allowed.
Employees must take good care of public property in the dormitory and are not allowed to damage, dismantle or modify it. Otherwise, they will be compensated according to the price and fined depending on the severity of the case.
Employees must take good care of the hygiene of the dormitory. All daily utensils must be clean and orderly. They are not allowed to spit, urinate or litter in the dormitory, and keep the room clean and beautiful; they are not allowed to go outside the window. Throwing debris, dumping dirt, and graffiti on the walls are not allowed. Garbage must be dumped indoors and outdoors. Garbage must be dumped in designated places. Dormitory staff will take turns cleaning each room every day.
Strictly abide by work and rest schedules. Loud speakers are strictly prohibited in the dormitory. Playing mahjong, poker, drinking, smoking and making loud noises are prohibited. Employees working the night shift must keep quiet.
Pay attention to saving water and electricity, and avoid wasteful phenomena such as running lights and running water.
Be vigilant, do a good job in fire prevention and anti-theft work, and strictly prevent the occurrence of fire accidents. It is strictly forbidden to use electric stoves, rice cookers and other high-energy electrical appliances indoors.
If something is stolen inside the dormitory, in addition to protecting the scene, you should report it to the dormitory management staff immediately. Dormitory keys issued to employees can only be used by themselves and cannot be given privately or lent to others. Employees on vacation must entrust their belongings to others to take care of them to avoid loss.
Without special reasons, long-term employees must return to the dormitory before 22:00 at the latest. No one is allowed to go out after 22:00 (except for work needs).
(Figure 17 is a rendering of the dormitory; Figure 18 is a plan and cross-sectional view of the dormitory).
3.1.2.12 Canteen
The construction site needs to set up a canteen according to the number of people, and keep a distance of more than 30m between the canteen and toilets, garbage dumps and other harmful places.
The canteen should have a separate production room and operation room, and must have mosquito and fly prevention measures.
The distance between the grain storage table and the wall and the ground should be greater than 0.2m.
The canteen should be equipped with water sources, drainage facilities, and refrigeration facilities. Sealed swill buckets, grease traps, and sealed trash cans should be set up outdoors, and domestic garbage should be disposed of in a timely manner.
Canteen staff must hold certificates to work and undergo regular physical examinations.
The canteen should be equipped with at least one fire-fighting facility.
(1) Canteen Management System
Canteen cooks should do a health check before taking up their posts, and should do a good job in cleaning the area, pay attention to hygiene, and "eliminate the four pests" ".
Quine up for meals and eat in a civilized manner.
Steamed rice must be cooked in a lunch box and placed in the designated steaming box. It is strictly prohibited to place or handle rice indiscriminately. Vegetables cannot be steamed in the rice steaming car.
The boiled water in the boiled water tank is for drinking only. To ensure the supply of boiled water, basins, buckets, etc. are not allowed to be used to collect domestic hot water.
It is not allowed to buy or sell spoiled or moldy food, and no leftovers are thrown away.
Do a good job in democratic management of the canteen, notify the names and prices of daily dishes in advance, and publish food accounts every month; listen to reasonable suggestions from employees and improve the quality of food.
(2) Meal time
Breakfast: 7:00~8:00, lunch: 12:00~13:00, dinner: 17:30~18:30.
Diners should eat on time and are not allowed to start meals in advance. Meal times will change with the seasons and will be notified later.
(Figure 19 is the rendering outside the canteen; Figure 20 is the rendering inside the canteen)
3.1.2.13 Shower room, laundry room, toilet
Construction site A shower room and a laundry room need to be set up (Figure 21 is a rendering of the outside of the shower room; Figure 22 is a rendering of the inside of the shower room; Figure 23 is a floor plan of the shower room; Figure 24 is a rendering of the laundry room).
A flush toilet should be installed on site, a fertilizer pool should be built, the toilet should have complete doors and windows, and measures should be taken to eliminate flies. A dedicated person should be responsible for regular cleaning (Figure 25 is a rendering of the outside of the bathroom; Figure 26 is a rendering of the interior of the bathroom; Figure 27 is the bathroom floor plan).
3.1.2.14 Medical Room
Set up a medical room or equip a medical box according to the actual situation, prepare enough commonly used medicines, check the quantity and validity period regularly, and replace and replenish them in time.
3.1.2.15 Firefighting
Equip sufficient firefighting equipment in accordance with firefighting regulations, establish a firefighting system, an approval system for the use of open flames, and conduct firefighting education, firefighting drills, and training. Strict management and control of key fire-fighting areas and key fire-fighting periods. Especially during the setting off of fireworks and firecrackers during the opening ceremony and completion ceremony, great attention should be paid to fire prevention issues, warning areas should be designated, and special personnel should be arranged to guard them.
3.1.2.16 Material Stacking
Various materials on site should be uniformly arranged according to the construction plan, neatly classified and stacked, and the material labeling should be clear and accurate. The material storage site should be flat and compact, with drainage measures in place. Steel bars, cement and other materials need to be erected with isolation layers, and attention should be paid to moisture and waterproofing.
3.1.2.17 Dust control
If necessary, set up vehicle washing facilities inside the construction site gate to keep the exiting vehicles clean; exposed earthwork should be tightly covered with dense-mesh safety nets; dust from drilling and other Serious processes must install sprinkler devices to reduce dust.
3.1.2.18 Noise
Control the noise of high-noise equipment such as woodworking chainsaws, ground pumps, concrete trucks, air compressors, down-the-hole hammers, etc., and arrange operation time reasonably, Avoid arranging the work at night, noon, and morning to avoid affecting the rest of surrounding residents; arrange the work location reasonably and try to stay away from residential buildings to reduce the impact.
3.1.2.19 Light Pollution Control
Set up a shading shed during welding operations to prevent strong light from affecting the construction site area and surroundings; try to avoid welding operations at night.
3.1.2.20 Save water, electricity, and materials
It is forbidden to keep lights on or running water, and turn off computers, copies, printers and other electrical appliances after get off work; choose building materials that can be reused or recycled , to achieve the purpose of saving.
Figure 1 Rendering of the construction site gate
Figure 2 Elevation of the gate in the construction area
Figure 3 Rendering of the guard room and warning mirror
Figure 4 Plan and elevation of the guard room
Figure 5 Warning mirror
Figure 6 Fence construction drawing
Figure 7 Signboard renderings
Figure 8 Elevation view of the brand image
Figure 9 Spring and autumn work clothes and winter work clothes
Figure 10 Badge icon
Figure 11 Special safety helmet
Figure 12 Job Responsibilities
Figure 13 Construction site office renderings (build one or two floors as needed)
Figure 14 Temporary office elevation and floor plan
Figure 15 Rendering of the conference room
Figure 16 Floor plan of the conference room and manager’s office
Figure 17 Rendering of the dormitory
Figure 18 Dormitory Plan and section view
Figure 19 Rendering outside the canteen
Figure 20 Rendering inside the canteen
Figure 21 Rendering outside the shower room
Figure 22 Rendering inside the shower room
Figure 23 Floor plan of the shower room
Figure 24 Rendering of the laundry room
Figure 25 Rendering outside the bathroom
Figure 26 Rendering of the bathroom
Figure 27 Floor plan of the bathroom
- Previous article:Universal couplets for school anniversary
- Next article:A model essay on the theme of civilization
- Related articles
- What does a fuel inspector do?
- The host of the instruction ceremony.
- What is the wind's grading jingle?
- Kindergarten Fire Safety Handwritten Report Contents
- Complete collection of corporate integrity slogans
- What are the reasons why subway advertisements against cruelty to animals were reported? Do you agree?
- What are the contents of the six guarantees?
- Summary of myopia prevention activities in kindergartens
- Summary of personal work on subway epidemic prevention
- What kind of ETC credit card is good? Can I use ETC credit card?