Summary of 7 flood control drills
Summary of flood control drill activities 1
As the flood season is approaching, Yetang Hydropower Station decided to hold a flood control drill to protect Yetang Hydropower Station from accidents, and formulated a drill outline, which laid a solid foundation for carrying out this flood control drill. A vigorous flood control emergency drill was held in Yetang Hydropower Station on May 8, and the main developments in the drill are summarized as follows:
1. Establish a leading group and define the post
In order to ensure the normal conduct of the flood control drill and fully complete the flood control drill tasks assigned by the company leaders, according to the drill outline of this project and the notification requirements for doing a good job in flood control drill, A leading group for flood control drill was established with stationmaster Yu Guoyang as the team leader, and four functional groups were formed. According to the scope of this exercise, the division of labor was carried out scientifically, the responsibilities and tasks of each functional group were clarified, and the pre-exercise study and explanation were carried out, which provided organizational guarantee for the standardized development of this exercise.
Second, all functional groups stick to their posts and do their duty to ensure the normal conduct of flood control drills.
All functional groups started from the flood control drills at the rolling gate of the workshop gate where the drills were held, and all the drill staff were on duty, with a scientific division of responsibilities and clear responsibilities. The assignment of work responsibilities of all functional groups played a central nervous system role in the drills and played a decisive role in the successful completion of the flood control drills.
3. Some gains of flood control drills
1. The understanding of flood control drills of Yetang Hydropower Station has been improved. Through study drills and flood control drills, and through actual participation, we have a deeper understanding that the operation and flood control of Yetang Hydropower Station are a whole.
2. We checked our flood control plan and emergency rescue plan. The idea of this flood control drill is not very comprehensive. Therefore, the operability of our flood control plan, the accuracy and standardization of command and decision-making, the flexibility of flood control dispatching and the ability to respond quickly to accidents all pose new challenges.
3. The coordinated combat capability among functional groups was tested. Through the cooperation of flood forecasting, equipment emergency rescue, communication information, logistics support and other flood control work, the ability of collaborative emergency rescue has been improved among functional groups.
4. It has been tested that our staff and workers, all the drillers, who stick to their posts, are strict in discipline and work in an orderly manner, have shown high work enthusiasm and professional work quality, and are a working group with positive attitude and obedience to commands.
IV. Problems in the drill work
1. Due to insufficient explanation of this flood control drill, the positions of some personnel are not very clear.
2. As some drillers are participating in flood control drills for the first time, they don't know enough about the importance of effective cooperation among functional groups, and sometimes they work in their own way, and their coordination is not enough.
summary of flood control drills 2
When the flood season comes, our company's coal mines have taken precautions. While doing a good job in flood control during the rainy season, we lost no time in organizing this emergency rescue drill, which has laid a solid foundation for effectively improving the safety awareness of all employees in our mine and their ability to deal with emergencies, and ensured the safety of our coal mines in flood season, and achieved remarkable results in preventing major floods and resisting major disasters. The specific situation of this emergency drill for flood control is summarized as follows:
On xx, XX, our company predicted that there would be a torrential rain in xxxx area at noon on the day of coal mine simulation, and the mine flood control headquarters took advantage of this "opportunity" to organize the mine flood control team to conduct a drill of "emergency plan for flood control and emergency rescue".
1. Contents of the drill:
There was a torrential rain in xxxx area at noon that day, which caused the water in the wellhead of my mine main shaft, auxiliary inclined shaft and return air shaft to reach 3mm deep, and the flood was very likely to pour into the underground, which would directly threaten the safety of underground workers and the safety of the mine.
second, the purpose of the drill:
to improve the awareness of prevention of all mine workers, so as to plan ahead and take precautions first, so that the rescue team and relevant personnel can be familiar with all the contents and safety precautions of the "emergency plan for flood control and emergency rescue".
Third, the drill steps:
On the same day, the dispatcher on duty immediately reported to the commander-in-chief after receiving the urgent notice from the meteorological department, and the commander-in-chief immediately issued a rescue order to start the emergency plan. The on-site command immediately organized 5 rescue personnel to be divided into five teams, with 1 people in each team taking shovels, woven bags, raincoats and rain boots to load sand in the battlefield near the wellhead, stacking the packed sandbags at the wellhead, and simulating the rapid surge of rainfall. Two submersible pumps were installed to drain water. After an hour's hard work, flood dams with a height of one meter and a width of one meter were built at three wellhead, effectively preventing the threat of flood, and the drill ended.
IV. The situation of superior leaders' observation, guidance and participants in the drill
At 11: a.m. on xx, xx, there were more than 4 superior leaders who came to our company's coal mine to observe and guide the emergency drill for flood control and emergency rescue, and more than 1 people participated in the drill, including the director of the county safety supervision bureau, the director of the coal management bureau and the main leaders of the Party Committee and government of xxxx Town. After the drill, the director of the county safety supervision bureau, XX, Director xx of Coal Management Bureau gave comments on our company's emergency drills for flood control and emergency rescue respectively, while affirming the results of the drills, he also put forward specific deficiencies, which has practical and guiding significance for our company's next flood control and emergency rescue work in coal mines.
after this "actual combat" drill, we have obviously mastered the necessary knowledge about flood control throughout the mine, and have given safety education to mine workers to prevent floods and disasters, which has achieved the expected purpose and received good results. It has improved the ability of members of our rescue team and headquarters to prevent and handle emergencies, and played an important role in testing emergency plans, improving mechanisms, training teams and educating employees. It is important to fully realize the necessity of taking targeted measures through drills to ensure the safety of our company's coal mine during flood season. Through the drill, we can also see that there are some problems that can not be ignored in the arrangement of personnel organization and procedures in our company's coal mine, which need to be further improved and improved in the next step, and the emergency rescue plan needs to be further revised and improved in view of the problems found.
summary of flood control drills 3
according to the 2xx flood control emergency plan compiled in 2xx, combined with the actual situation of the project, a flood control drill scheme for scenic garage is drawn up, which involves drills before, during and after the flood season. On May 31st, all the staff were organized to give an on-site explanation and drill, which lasted for one hour. In order to consolidate the achievements of the drill, improve the deficiencies, promote the work, and further enhance the emergency management ability of employees in production safety, the emergency leading group comprehensively summarized the drill.
First, the basic situation and characteristics of the drill:
This drill is a very important work of Qujiang Landscape Project; Conduct drills according to the existing personnel on duty and the actual emergency possibility of the project. In view of the publicity and training of various drills for employees since the flood season:
1. Qujiang Landscape Project organized employees to hold a flood prevention mobilization meeting, read out the drill plan, put forward work requirements, and let all employees understand the necessity and basic steps of the drill;
2. explain the procedure, content, time and discipline requirements of the drill, as well as the work arrangements of personnel before, during and after the flood season;
3. The members of the command group and the emergency rescue team have a meeting to implement their responsibilities and clarify the relevant work requirements. And emergency equipment and materials were prepared in advance, which provided a solid foundation for the smooth and effective completion of this exercise.
2. From the effect point of view, this drill is close to reality, well-directed, well-prepared, well-organized, solid and effective, and basically achieves:
1. The purpose of testing the emergency plan is to find out the problems existing in the emergency plan and improve the scientific, practical and operability verification of the emergency plan;
2. Exercise the team: to be familiar with the emergency plan and improve the ability of emergency personnel to properly handle accidents in an emergency;
3. Perfect preparation: the expected goal of improving emergency management and emergency disposal technology, supplementing emergency equipment and materials, and improving their applicability and reliability.
Third, this drill mainly embodies the following three characteristics:
1. Organization. Set up an emergency leading group to make work arrangements according to the actual situation of the operation team; And sudden flood control.
2. The goal is clear and the planning is thorough. From the reality, the drill planning, preliminary equipment, organization and implementation, and simulation rehearsal have all been specifically deployed; Comprehensive drills organized before, during and after the flood season.
3. Being practical, safe and orderly is a drill organized under the condition of ensuring the safety of participants and equipment and facilities, so that everyone in the operation team can know fairly well according to the actual situation in flood season.
IV. Shortcomings in the drill
1. Some members of the emergency response team are not familiar with the pre-plan and drill plan; There is hesitation and inexperience in the exercise, so it can't be carried out in a coherent way according to the plan.
2. The division of responsibilities among emergency response teams is not very detailed.
3. The contents of the report are not standardized by the on-site emergency personnel.
4. The participants can't perform the required actions properly, and they can only meet the basic requirements after repeated.
v. concrete results of the drill
this drill is very practical, and it was a complete success and achieved the expected goal. Mainly reflected in two aspects: first, it embodies the concept of people-oriented and scientific training. This exercise has implemented the principles of unified leadership, comprehensive coordination and graded responsibility for emergency disposal, which is of great significance to promoting the emergency management of production safety. Secondly, the ability to train the team and deal with unexpected events has been realized. This drill has clear guiding ideology, strict organization, sufficient preparation, reasonable program setting, reliable safety measures and open and transparent process, which verifies the practicability and operability of the plan.
summary of flood control drills 4
in order to further improve our city's comprehensive emergency response capability for flood control and improve the actual combat capability of flood control teams, our bureau organized this year's flood control drills on July 18th this year. The relevant situation is summarized as follows:
1. Make a drill plan scientifically
In June this year, the preliminary plan of flood control drill was reported according to the requirements of the Municipal Emergency Office. In order to do a good job in this year's flood control drill and ensure the effect of the drill, before the flood season, our bureau set up a special organization for drill command and coordination, started to prepare for the flood control emergency drill, and organized flood control experts to plan specific drills. Combined with the actual flood control work in our city and the previous drills, the scale, form, time and place of emergency drills are reasonably planned.
Second, carefully organize the drill
On July 18th, the drill was held in XX River, XX Town. City defense refers to the leadership in the field organization and command.
1. Setting the background of the drill: In recent days, the city has been flooded with heavy rain. Due to the continuous rainfall and the overflow of the upstream reservoir, the Xx River in our city has been flooded with a peak flow of 1,5 cubic meters per second, and the riverbank in the Henan section of Xx Town is in danger of dike overflow, with a mouth width of 4 meters and an overflow flow of 3 cubic meters per second, which is continuing to develop.
once the danger expands, the river burst, which directly endangers the life and property safety of the people along the coast. According to the city's emergency plan for flood control and drought relief, in order to resist the real situation of heavy rain and flood, we will focus on the quick assembly ability of on-site rescue machinery and materials and the on-site rescue skills of rescue teams.
2. Exercise method: actual combat exercise.
3. Exercise subject: river burst and protection.
4. Materials team: The Municipal Mobile Rescue Team dispatched 5 flood control and rescue team members, used 2 excavators and 2 loaders, mobilized 1, emergency materials preparation bags and 2 wooden stakes, and used 3 cubic meters of flood control sand and gravel.
iii. timely summary and evaluation
after the drill, our bureau tracked and evaluated the effect of the drill in time. The main purpose of this drill is to test and improve the emergency response and rescue skills of the rescue team through actual combat drills, and to improve the emergency handling ability of our city to deal with sudden dangerous events of water conservancy projects. Combined with this drill, it is necessary to further revise and improve all kinds of flood control plans, strengthen flood control material reserves and the construction of rescue teams, conscientiously sum up the experience and practices of this flood control drill, establish an emergency rescue mechanism, and always be ready to invest in flood control and rescue.
summary of flood control drill activities on 5
2xx xx, according to the overall work arrangement of the company, in order to improve the safety awareness of all employees of the company, test the scientificity, feasibility and practicability of the company's emergency plan, enhance the resilience and self-protection ability of employees in emergency situations, and ensure that disasters can be avoided and the safety of personnel's lives can be guaranteed to the greatest extent. The Company's Security Department organized the evacuation drill for flood control and emergency rescue to improve the emergency ability of the company's employees to deal with underground personnel evacuation, and to test the coordination and cooperation capabilities of all departments, workshops and project departments in the company.
in order to ensure that the drill can be carried out according to the scheduled process, the safety department issued a notice and plan about the drill on xx, X. At 5: p.m. on xx, X., the main person in charge was trained, and it was required to convey it to every employee and study hard to ensure that the drill achieved the expected purpose.
1. drill process
at 9: am on 26th, X, the drill of evacuating people for flood control and emergency rescue officially started, and the records of the drill are as follows:
At 9: , the company leaders, the dispatching director and the person in charge of rescue gathered in the centralized control center.
at 9: 5, the commander-in-chief X announced the start of the flood control emergency plan drill.
at 9: 5, the attendant in the dispatching room received a flood report (the rainfall exceeded 5mm within 24 hours) → immediately notified the company's chief dispatcher → the chief dispatcher then reported the situation to the general commander X (the rainfall exceeded 5 mm within 24 hours, and the underground personnel needed to be evacuated urgently, and there were existing personnel) → General X immediately gave an order to start the emergency plan for flood control.
the dispatcher immediately calls xx, the head of the emergency rescue team, xx, the head of the alert security team, the head of the logistics security team, xx, the head of the medical rescue team, xx, the head of the communication security team, and xx, the head of the power security team, to organize personnel to implement emergency procedures.
at the same time: the dispatcher informs the underground dispatcher and the underground duty leader → organize the underground personnel to evacuate immediately after being notified.
at 9: 7, after the emergency plan was started, the inoue rescuers immediately gathered at the auxiliary wellhead. Organize personnel to ascend the well immediately.
at 9: 8, all groups were assembled, and General Manager Gao, the leader of the rescue team, reported to General Manager X that the rescuers were in place and the relief materials were ready. Then, General Manager X arranged to fully organize the rescue and be alert.
at 9: 9, Mr. Gao divided the rescuers into four groups, namely, mechanical and electrical workshop, xx project department, xx project department and xx project department, with four people in each group, and each group appointed a team leader. Organizer of electromechanical workshop
- Previous article:Grain Rain's ancient poetry and solar terms
- Next article:Eye protection like eyes is the theme of handwritten newspaper content.
- Related articles
- A 600-word essay on the most beautiful retrograde person
- 2017 Work Summary of Dry Rest House and 2018 Work Plan
- Where is the Laoshan boundary? What's the story?
- Implementation plan for school learning from Lei Feng activities
- Summary of Volunteer Service Activities of Disabled Persons' Federation
- Recommendation letter of pre-school education graduates
- How to write banners to mediate conflicts between husband and wife?
- An excerpt of the eight-character inspirational slogan for the high school entrance examination
- Regulations of Huaian Municipality on the Administration of Underground Pipelines
- When will the crackdown on pornography and illegal activities begin?