How to ensure construction quality
1 Scientific management, establishing and improving various management systems: Formulating job responsibility systems and various rules and regulations is the primary task and important part of enterprise management.
2 Raise awareness and strengthen the management of front-line workers: To improve the level of construction management, we must lead in thinking, that is, we must first improve management awareness.
3 Organize construction and strive to do a good job in project quality and safety management: When directing various projects, the project manager must conscientiously do a good job in project quality and safety management and organize many units at a construction site.
4 Grasp construction market information and strengthen project cost control: Modern scientific management methods are changing with each passing day, and project managers must fully understand and understand new materials and new developments in domestic and foreign construction markets. First, based on the construction drawings, we conduct work and material analysis and conduct a large number of market surveys to prevent the use of substandard products.
5 Take measures to protect construction machinery: Machinery control includes construction machinery and equipment and tool cost control. Appropriate mechanical equipment should be selected according to different process characteristics and technical requirements.
6 Strengthen the control of the construction process and improve the quality of the project: Excellent project quality is directly produced during the construction process. The construction workers and quality safety officers of the project department must monitor the construction operations of the work team, including operations Methods, work processes, etc. are inspected and supervised at all times.
Basics:
1. *** Same-sex basis.
Refers to the general ones applicable to the construction stage and related to quality management, which have universal guiding significance. and the basic conditions that must be complied with.
Mainly include: project construction contracts; design documents; design disclosure and drawing review records, design modifications and technical changes, etc.; issued by relevant national and government departments
Promulgated laws and regulatory documents related to quality management, such as the "Construction Law", "Tendering Law", "Quality Management Regulations", etc.
2. Special technical regulations.
Refers to specialized technical regulations formulated for different industries and different quality control objects.
Extended information:
Project quality management is a long-term, meticulous process that runs through the entire construction process. And every link requires a strong sense of responsibility and a good sense of innovation. The problem of the UT rework port of the extended ring seam flowing into the next process without completing the non-destructive inspection. If this problem is not discovered and dealt with in time, it will cause the risk of large-area rework and material waste, becoming a serious quality problem. Hidden danger.
Determine effective corrective measures after analysis and research, accurately locate the defect location, and select appropriate rework equipment and processes to meet the rework conditions. At the same time, strengthen monitoring during the rework welding process. In the process, preheating before welding, interlayer temperature control and other means are used to ensure that defects are completely removed.
By taking effective rectification measures and strengthening the comprehensive management of construction personnel's quality awareness, construction organization, construction process, construction technology, personnel deployment, etc., it not only prevents quality hazards from affecting subsequent assembly work and the progress of the entire project At the same time, we will take measures such as strengthening quality awareness, strengthening process quality management, and strengthening communication to avoid similar hidden dangers in subsequent construction.
Reference: Baidu Encyclopedia - Construction Quality Control
- Related articles
- Where is the taxi in Sichuan?
- Unique flower shop name unique flower shop name
- Slogan of piano lesson
- Is this how to teach Chinese to the first grade of primary school?
- How to invite friends to receive red envelopes in the Yuedong circle?
- The slogan of unity is eight words.
- A month after Changsha retired to enjoy motorcycles, where did nearly 400,000 cars such as Hello, Qingju and Meituan go?
- Who can introduce the Paralympics?
- 2010 Contents of Chinese Compulsory Course 1 published by the People's Education Press for High Schools
- The review of Fushun's Luo Yaping educational film Granny Land, combined with the 90th anniversary of the founding of the Party, wrote an article of about 1500 words, with the direction of building a