What do you mean, hand over the house?

What do you mean, hand over the house?

Delivery, also known as turnkey and repossession, refers to the behavior of real estate development enterprises or sellers to deliver completed commercial housing construction projects (or self-owned houses) to buyers.

What is property delivery?

Property delivery means that the auction house purchased by the user has been completed and has the conditions for the owner to live in, and the house can be delivered to the owner for use.

What should I pay attention to when handing over the house?

Note 1: check the information.

1. Residential quality guarantee of the house (the original seal can be taken away).

2, "residential use manual" (stamped original can be taken away).

3. Completion acceptance record (original seal).

4, the measured area table/detailed list of the measured area of surveying and mapping units (can be a copy but should have a chapter).

5. Completion drawing of pipeline distribution (water, strong electricity, weak electricity and structure)/project completion drawing or construction drawing of design unit (can be taken away).

6. Construction engineering quality certificate.

7, real estate development and construction project completion comprehensive acceptance certificate.

8. When signing, indicate "the house condition is unknown".

Matters needing attention in handover: building structure

1, check the house for cracks.

(1) Check the floor and roof of the master bedroom and living room near the terrace for cracks. Cracks parallel to the beam will not hinder the use after repair. If the crack is at an oblique angle of 45 degrees to the corner or perpendicular to the beam, it shows that there are serious settlement and structural quality problems in the house.

(2) Whether there are cracks on the walls on both sides of the terrace, if any, is also a serious quality problem. Structural problems of houses often appear on balconies. If cracks are found at the joint between the room and the balcony, it is likely to be a harbinger of balcony fracture.

(3) Whether there are cracks in the load-bearing wall. If the crack runs through the whole wall and goes back, there is a hidden danger.

(4) Cracking of wall, corner joint and ceiling.

2, check the empty drum.

(1) Check whether there is shell cracking on the ground. Hit all the ground, especially around the foot line. If you hear empty sound when tapping on each surface, there is a gap between each surface and the wall (ground) surface, which needs to be reworked; If you hear a dull crash, it means they are in good contact.

(2) Check whether there is any uplift or depression on the wall and ceiling ground, and tap with a wooden stick for hollow sound.

3. Check the inclination and levelness.

(1) Tie the heavy object to the roof with a string, stick it on the wall and put it down to the foot of the wall, and check its inclination from all sides.

(2) Visually, it is roughly flat.

(3) Check the flatness of the wall. Are there any special inclinations, bends or waves in the walls and ceiling floors?

4. Measure the height of the room.

The building height is 2.8m, the actual height should not be less than 2.6m, the actual height of 3m should not be less than 2.75m, and the residential height should not be less than 2.8m.. ..

Matters needing attention in handover: leakage, drainage and waterproofing.

1, check the house for water leakage.

(1) Check the water seepage on the floor and top floor of the house.

(2) Check the wall of the house for discoloration, foaming, peeling and ash falling.

(3) There is no water stain on the wall, corner and ceiling.

(4) Check whether the kitchen, bathroom (top surface, external wall), balcony top and pipe interface are leaking. Pay attention to whether there is paint peeling off or mold growing on the ceiling of the toilet.

Step 2 drain water

(1) Check the launching condition to see if it is unobstructed. They are washbasin, toilet, bathtub, and floor drain in bathroom, kitchen and balcony (you should hear purring, there is no water on the surface). Qualified ground can't have water, because the floor drain is the lowest place, but there is a certain height of floor around the floor drain of the rough house. According to the water pressure and drainage speed, try to make the water flow big and fast.

(2) whether there are cracks in the toilet and bathtub, whether the flushing water tank leaks, whether the interface between the bathtub and the wall or cabinet is waterproof properly, and whether the faucet in the pool is appropriate.

3. Waterproof material

(1) Drain the toilet and toilet water (about 2cm high), and check the smallpox in the toilet and toilet after 24 hours.

Matters needing attention in handing over the house: indoor details

1, pipeline

(1) Whether the coating on the surface of various pipelines is in good condition.

(2) See if there is any frost crack on the water pipe.

(3) Touch the elbow and valve by hand to see if it is wet (leaking).

(4) Whether the sewage pipe has a water storage deodorizing elbow and a deodorizing floor drain.

2. Door (gate, door)

(1) Whether the inner, outer and top surfaces of the door body are painted, drooping, smooth and bumpless. The top of every door must be painted.

(2) Visually check whether the four sides of the door are parallel, whether they are close to the door frame and whether the gap is too large (especially on one side of the door lock).

(3) Whether the door operates freely and whether there is any special sound when it is opened or closed.

(4) Whether the door lock operates freely; See if the door lock is installed firmly; Whether the door key and lock are sealed; Whether Mense inserted it too little or too long or too tight.

(5) Close the door and listen to the sound insulation effect to understand the sealing degree.

(6) The bathroom door is not required to fit completely. In order to be waterproof, the bottom is required to be off the ground 1.5cm. The paint quality of windows mainly depends on the bottom of the bathroom door.

Step 3: Windows

......

What do you mean, hand over the house?

Delivery means that the developer delivers the house to you. Generally, the sign of handing over a house is that the owner signs the book of repossession and gets the key, which is regarded as the owner repossession.

Warm reminder from Guangzhou Woodpecker House Inspection Company:

Before repossession, you should know which expenses must be paid and which cannot be paid; Carefully check the repossession files (pay attention to two important repossession files, namely, residential instruction manual, residential quality guarantee and completion acceptance record form), and adhere to the principle of "house first, then sign for the key".

You can find a professional house inspection company to accompany you when you take over the building, and provide more professional house inspection services. Ensure that the owner repossesses the building smoothly.

What do you need to know about real estate delivery?

What do you mean by posing?

If you don't pay, look at the five levies and two books first. You are thinking about others. If all the money is paid, let's see if all their previous promises have been fulfilled, such as electricity and water supply.

What is the process of delivering the new house?

Hello! The delivery process is mainly as follows: 1. The developer shall notify the buyers in writing to accept the delivery within the agreed time. Two, the certificate and other relevant information required for the industry to host the occupancy notice, and go to the place designated by the real estate development enterprise within the time limit required by the occupancy notice to consult the written files that the real estate development enterprise should obtain according to law. (such as two books and one table); Two books refer to "residential quality guarantee" and "residential instruction manual", and one refers to "completion acceptance record form"; Third, pay attention to the area problem, ask for the "area measurement form" and ask the developer about the size and composition of the pool area; Fourth, the owner asked professionals to carefully check the quality of the house, record the problems, and fill in the house inspection form in detail; 5. After the acceptance of the house, the owner shall take the following measures according to different situations: if there are quality problems of the commercial house that can be checked out legally or agreed, or there are other circumstances of canceling the purchase contract, the buyer will decide whether to check out and notify the real estate development enterprise in writing within the agreed time limit; If there are quality problems in the commercial housing that do not meet the check-out conditions or agreed standards, the buyer can put forward the quality problems or contents that do not meet the agreed standards in writing to the real estate development enterprises, which will repair or compensate them one by one within a certain period of time. The real estate development enterprise shall repair the quality problems of the commercial housing item by item or make a written commitment to repair them, and after the buyer agrees, both parties shall settle the house payment according to the technical report on the measured area of the commercial housing. Seven, the buyer to the real estate development enterprises to pay other fees stipulated in the contract for the sale of commercial housing or commercial housing pre-sale contract. Eight, the owner signed the "House Acceptance Handover Sheet" and received the house key from the real estate development enterprise or the third party designated by the real estate development enterprise. Nine, the owners to the real estate development enterprises in accordance with the law to choose the early property management companies to pay property management fees, and handle the relevant formalities of property management.

How to check the delivery time of real estate in 5 minutes online?

Whether it's online search or at the same time as buying the factory, it's actually untrue, because the delivery time is basically set by the developer himself, sometimes it may be delivered in advance, and sometimes it may be delayed!

What do you mean by the opening delivery of new buildings in Guangzhou?

1. Delivery refers to the behavior of the developer to deliver the house that meets the agreed delivery conditions to the buyer within the delivery period stipulated in the contract according to the commercial housing sales contract. The date agreed in this contract has legal effect. It marks the official start of residential property management construction, and the situation of joint management and mutual supervision among property management enterprises, owners and users has been formed.

Second, the specific delivery time of the house should be clearly stipulated in the purchase contract signed by the buyer and the seller. You can look at the time specified in the purchase contract. If the developer fails to deliver on schedule, the developer will breach the contract. According to the relevant provisions of the Contract Law, the seller shall pay liquidated damages or compensate for the losses if the delivery is overdue. The parties may agree that when one party breaches the contract, it shall pay a certain amount of liquidated damages to the other party according to the situation of breach of contract, and may also agree on the calculation method of the amount of compensation for breach of contract.

Three, the contract does not stipulate the calculation method of the amount of liquidated damages or compensation for losses, can be determined by referring to the rent standards of similar houses in the same lot published by the relevant competent departments or evaluated by qualified real estate appraisal agencies during the delay of delivery.

What preparations should I make before handing over the house?

What documents must developers provide?

When closing the house, the developer needs to provide the following three books: shqianyy.

1. When the house is closed, the developer needs to show the owner the original completion acceptance filing form, which must have the signature and official seal of the filing department to prove the acceptance.

2. When the house is closed, the developer needs to provide the owner with the original "Residential Quality Guarantee". If the developer entrusts a property management company and other units to maintain the quality of the house, the developer shall specify the name of the entrusting unit in the "Residential Quality Guarantee" to ensure the quality standard of the house.

3. When the house is closed, the developer should provide the owner with the original "Residential Instruction Manual", which should explain the structure and efficiency of the house, the types, efficiency and standards of each part (component), and mark the matters needing attention in use.

4. When closing the house, the developer needs to show the owner the original construction quality certificate, which was issued after the construction quality and safety supervision and inspection station (quality supervision station) passed the inspection.

5. When the house is closed, the developer needs to show the owner the original comprehensive acceptance certificate for the completion of real estate development and construction projects.

Information that the owner needs to bring when he closes the house:

"Foreclosure" has two meanings: first, it refers to a routine operation mode of intermediary companies; The other refers to the behavior of handling the handover procedures with the developer after the completion of the house. And the house here refers to the behavior of handover with the developer.

Generally speaking, buyers should bring all kinds of documents and materials needed on the day of repossession, including the original documents such as repossession notice, copy of owner's ID card, payment receipt and purchase contract. , within the time specified in the notice of repossession (usually about 30 days), go through the repossession formalities at the place designated by the developer (usually the real estate site).

In addition, many kinds of projects will handle the refund procedures for the pre-sale area and property area difference for each owner at the same time when the building is repossessed.

What does the internal subscription before the official opening of the property mean?

In recent years, many real estate developers have launched the "internal subscription" method to sell commercial housing on a small scale before obtaining the "Pre-sale Permit for Commercial Housing" and other related documents. The most important premise of internal subscription is to have a certain degree of preemptive right, which is generally compared with the "opening price". If the internal subscription price should be the "lowest current price" in the process of commercial housing sales according to the prevailing marketing principle of "low opening and high going" for real estate developers, then a suite may be "cheap" by 10,000 yuan.

If the location is good, the price is reasonable, and the developer has credibility and strength, then people who have nothing to do with the small subscription scope can't buy it. On the contrary, anyone can subscribe.

Risks and precautions: he can have five incomplete certificates now, but he must have a land certificate and two planning certificates, otherwise it will be difficult to handle the real estate license or it will be illegal in the future. The agreement on delivery time and compensation for failure to deliver the house on time should be reflected in the contract.

-

Answer: two of the five cards.

Construction land planning permit, construction project planning permit,

Housing construction permit, state-owned land use permit and commercial housing sales (pre-sale) permit,