Commitment letter of engineering construction

Project construction commitment letter model 1 1, quality assurance: We will carefully organize the construction according to the requirements of the national construction acceptance specification, strictly control the materials and construction quality, carefully construct and create a fine project to ensure the project quality meets the Unified Standard for Acceptance of Construction Quality of Building Engineering (GB50300-20xx), otherwise our company is willing to bear the corresponding responsibilities.

2. Time limit guarantee: according to the specific conditions of the project, detailed construction organization design and schedule plan are prepared, and advanced construction methods and technologies are adopted. Do it with sufficient manpower and full working face, and do not stop work during busy farming season and winter rainy season to ensure that the work is completed within XX calendar days.

3. Safe and civilized construction: carry out the construction according to the standard of safe and civilized construction site, and carry out the inspection item by item according to the safety and civilized construction inspection score table in the Standard for Safety Inspection of Building Construction (JGJ59-99), so as to reduce the construction noise and environmental pollution, ensure that no major safety accidents occur, and create a safe and civilized construction site that meets the standard.

4. Warranty period: The warranty period of this project shall be implemented in accordance with relevant national regulations. During the warranty period, our company will undertake all maintenance obligations free of charge; Outside the warranty period, our company only takes the cost of materials for the expenses incurred in the construction process. Within and outside the warranty period, our company will be on call if notified by the construction unit. After the project is completed, the project department will assign special personnel to work at the site for half a year, and set up a warranty team to be responsible for the maintenance and warranty work.

5. Return visit: After the project is delivered, our company will send special personnel to the construction unit for return visit on a regular basis. After receiving the notice from the personnel of the construction unit during use, we guarantee to be on call.

6. Advance payment: During the construction of the project, if the funds of the construction unit are not in place temporarily, we promise to continue the construction for one month without stopping work.

7. Our company will actively assist you in investment control, put forward reasonable suggestions, optimize the engineering design scheme, scientifically prepare the construction scheme and construction work instruction, reduce extra consumption, and help the owner realize the best combination of investment and benefit.

8. Our company fully agrees with the provisions of other substantive contents in the bidding documents.

Bidder (seal)

Legal representative or authorized representative (signature)

XXXX,XXXX,XX,XX

Project construction commitment letter model essay 2 In order to ensure the smooth completion of external wall insulation and coating engineering, our unit makes the following commitments:

I. Quality assurance

1. Construction quality: In order to ensure the construction quality, the relevant provisions of construction quality specifications and standards (including mandatory standards) of construction projects shall be seriously implemented, and technical disclosure shall be made to the construction personnel before construction until each worker is familiar with the operation technology. During the construction, it is required to carry out the construction in strict accordance with the operation technology, and check the construction quality in strict accordance with the "three inspection systems" (self-inspection, handover inspection and professional inspection). Every process is not checked or does not meet the quality requirements.

2. Materials: strictly control the quality of incoming goods, perform material inspection procedures, and use materials with certificates and re-inspection reports.

Second, the time limit for a project guarantee

1. Reasonable organizational measures: ① Unified scheduling and management by the project department. (2) Timely implement the mobilization, scheduling and management of materials, machinery and labor. Do a good job in process arrangement and prepare the working face in advance.

2. Implementation of schedule management: ① Plan every week, issue the quota of teams and individuals and the completed engineering quantity index, and clarify the responsibilities. (2) The team conducts self-inspection on the progress and quality every day, and puts forward specific measures to complete the plan. Hold a weekly coordination meeting to coordinate the working procedure and construction progress, and solve the factors that delay the construction period in time.

3. Time commitment: ensure that it is completed on time according to the contract time limit.

Third, safe and civilized construction

The construction team is directly responsible for safety and is equipped with full-time security officers. In addition to complying with the requirements of safety operation procedures, the following points should also be noted:

(A) the construction of electricity safety

(2) Safety measures

1, implement the policy of "safety first, prevention first", and in the whole construction process, we must seriously abide by the construction safety work norms and safety management system, strive to do a good job in safe production and civilized construction, and put an end to the occurrence of vicious accidents.

2. Implement safety regulations.

3. Sign labor contracts with construction personnel according to law, pay workers' wages on time, and never default on migrant workers' wages.

4. Consciously accept the supervision and inspection of users and their management departments on the quality and safety of construction projects, and timely rectify the problems raised in the inspection.

Fourth, public security management.

1. Hold a public security education meeting once a week, assign a special person to be responsible for public security management, and implement various public security management measures to each team.

2. It is forbidden for all members of the construction team to fight, and it is forbidden for all construction personnel to go beyond the prescribed scope of activities, which will affect the life of on-site management personnel.

3, do not comply with the provisions of the construction site public security management, will be dismissed.

Verb (abbreviation of verb) environmental sanitation

1, the construction site timely sort out the domestic garbage every day, and the living quarters must be kept clean and tidy;

2, site garbage must be cleaned every day to prevent pollution;

3. All garbage must be discarded in the designated place, and it is not allowed to be randomly placed.

4, resolutely implement the construction site clean behavior, to ensure the cleanliness of the construction environment.

Commitment unit (signature):

Commitment (signature):

date month year

Model Letter of Commitment for Project Construction 3 Party A: Buildings 5 and 6 of "Pan Ting by the Sea" in Dahuchen Community, changge city.

Party B:

Through negotiation between Party A and Party B, Party A will clear the single project of this project to Party B for construction in the form of labor service package. In order to ensure the project quality, construction period, safe and civilized construction and establish a good image of the construction unit, Party B promises to Party A's project department as follows:

First, obey the unified command of the project department, carry out orderly construction in strict accordance with the requirements of construction drawings and national construction specifications, and the project department will formulate sub-projects to ensure completion, and will be punished voluntarily if it fails to meet the requirements.

2. In the process of construction, if the construction personnel do not meet the requirements, Party A's technicians will correct them twice and the project department will study and replace Party B's construction team, and Party B will withdraw unconditionally. After the evacuation, Party A will pay 70% of the contract unit price to the workers according to the quantities completed by Party B. ..

Three. Party B shall manage its own construction personnel, do a good job in civilized construction and safe construction, and take good care of all mechanical equipment, facilities and turnover materials of Party A's project. Don't damage, steal or waste. If Party A's management personnel find the above-mentioned undesirable phenomena, Party B will voluntarily accept a fine of RMB 3,000, in addition to holding the parties accountable.

Four. During the construction period, Party B shall reasonably use the equipment provided by Party A, tidy and clean it after work, put it back in its original place and pile it up neatly. Cut off water and power supply to prevent rain, leakage, loss and danger. If the above requirements cannot be met immediately every day, Party A will arrange personnel to handle them, and the expenses incurred shall be borne by Party B. ..

Five, dormitory, kitchen, toilet cleaning every day, to prevent the epidemic. Employees' belongings should be placed neatly and kept clean and tidy. If it does not meet the requirements, Party A will send someone to clean it up, and the expenses will be borne by Party B. ..

6. If Party B temporarily invites runners, they will voluntarily accept exit inspection after work, and the vehicles will be parked in the designated place in an orderly manner.

Seven, to all the construction personnel entering the site to do a good job before and after the safety education. When entering the construction site, you must wear safety helmet correctly and be familiar with various operating procedures. In case of violation, Party B voluntarily accepts the punishment.

Eight. Duration Schedule: (Effective Duration)

1, basis

2, the basement:

3, a layer of structure:

4, the second floor and above:

5, plumbers, scaffolder crossover operation, full cooperation.

Nine, rewards and punishments regulations

1, the construction period is advanced and postponed for half a day, and the rewards and punishments are calculated cumulatively.

2. Those who don't wear safety helmet and slippers will be fined RMB each time.

3. The structure is capped, and the project department organizes each building number to use * * *, and the quality and time limit for a project are up to standard, and the worst penalty is RMB.

4, concrete slurry leakage, honeycomb, template found a slurry, fine 500 yuan to 500 yuan section severe fines.

5. Anyone who does homework after drinking or makes trouble because of drinking will be fined 500 yuan.

Person in charge of Party A (signature and seal)

Commitment of Party B (signature and seal)

The fourth commitment mode of project construction is to earnestly fulfill the main responsibility of production safety in _ _ _ _ _ _ project construction, strengthen safety management and continuously improve the level of production safety. This unit solemnly promises to earnestly fulfill the following responsibilities of production safety in the process of project construction:

1, establish and improve the safety production responsibility system, formulate and implement safety production rules and regulations, and strictly implement the construction technical specifications; Consciously accept the supervision and management of the relevant administrative departments.

2, to ensure the investment and use of funds needed for safety in production, the normative documents of safety protection and civilized construction requirements on the construction site.

3. Establish a safety production management organization, equipped with full-time safety production management personnel suitable for the construction scale and specialty.

4. The person in charge of the project, full-time safety production management personnel and special operations personnel have passed the examination by the legal department and hold valid certificates.

5. Participate in industrial injury insurance according to law, and handle accidental injury insurance for personnel engaged in dangerous operations on the construction site according to law; Pay insurance premiums for employees.

6. For dangerous sub-projects, parts and links prone to major safety accidents on the construction site, preventive monitoring measures and emergency plans shall be formulated, and necessary emergency rescue equipment shall be equipped.

7, establish and improve the construction site safety management files, accounting. Earnestly perform other duties stipulated by laws and regulations.

8, to ensure that the project is not illegal, illegal subcontracting, subcontracting.

9. Pay the warranty money for production safety according to your requirements, and bear all economic responsibilities caused by engineering accidents.

As the legal representative or entrusted person in charge of this unit, I am fully responsible for the safety production of this unit. If I violate the above commitments, this unit is willing to bear the corresponding economic and legal responsibilities.

Commitment unit (official seal)

Legal representative (signature)

Project Construction Commitment Model 5 Contractor: IDNo.:

In order to implement the policy of "safety first, prevention first", clarify the safety responsibilities of both parties, and ensure the safety of people, power grid and equipment during construction, this agreement is signed by both parties through consultation in accordance with relevant national laws and regulations.

Article 1 Party A's Safety Responsibility

1. Before commencement, Party A shall make technical disclosure on construction safety to the contractor, and have written records or materials.

2. Party A shall require the contractor to formulate construction safety measures before commencement and report them to Party A for the record.

3. Party A has the obligation to assist the contractor in safety production, fire control management, supervision and inspection. Party A has the right to inspect and urge the contractor to implement the work regulations related to safety production, stop and correct the contractor's behavior that does not conform to the safe and civilized construction, and make telephone or oral safety rectification until it is retired.

4. Party A appoints Comrade Zhou Jidong to be responsible for the safety contact with the contractor.

5. Party A has the right to spot check the safety technical knowledge and safety working procedures of the contractor's personnel involved in the construction.

6. Party A has the responsibility to investigate and report the power grid and equipment accidents of Party A during the construction period. In the event of a major accident specified in the State Council's Interim Provisions on Investigation Procedures for Extraordinary Major Accidents during the construction, Party A has the right to urge the contractor to immediately notify the local government and public security department, and request to send someone to protect the site; And have the right to request the contractor to provide written conclusions and handling opinions on accident investigation.

7. In the following cases, the contractor shall bear the liability for breach of contract caused by shutdown and rectification:

(1) personal casualty accident;

(2) The construction machinery and main production equipment are seriously damaged;

(3) Fire accidents;

(four) illegal command or risky operation, not listening to advice;

(5) The construction site is dirty, disorderly and poor, which can not meet the requirements of safe and civilized construction.

Article 2 Contractor's Safety Responsibility

As the contractor of the project, he is responsible for the safety of personal injury and equipment damage accidents during the construction. The contractor shall earnestly perform the following safety responsibilities:

1. Relevant qualification certificates required for contracted projects provided by the contractor: construction capability certificates and historical performance data shall be true, legal and effective.

2, the contractor must implement the relevant national laws and regulations on production safety, must formulate the corresponding safety management system; Strictly implement "Electric Power Safety Work Regulations", "Electric Power Construction Safety Work Regulations", "Typical Fire Prevention Regulations for Electric Power Equipment" and other regulations related to electric power production.

3. On-site construction shall comply with national and local laws, regulations and rules on labor safety and employment, and ensure the legality of employment. The contractor must, in accordance with the relevant provisions of the state, handle personal insurance for the construction personnel and equip them with qualified labor protection articles and safety appliances.

4. During the construction period, the contractor shall have full-time safety supervisors (less than 30 people shall have part-time jobs). The contractor designated as the contact person for safe work.

5, the contractor all construction activities, must prepare safety construction measures, before the construction of all construction personnel to conduct a comprehensive safety technical disclosure, and in the whole construction process correctly and completely, no measures or disclosure is strictly prohibited.

6. The quantity and quality of the construction machinery, instruments and safety protection appliances used by the contractor in this project must meet the construction needs and meet the safety requirements after inspection by a qualified inspection unit. Personal injury and equipment damage caused by improper use of instruments and meters shall be borne by the contractor.

7. Before starting work, the contractor shall organize all construction personnel to carry out safety education, and report the list of personnel who participate in safety education (including temporary supplement or replacement) to Party A for the record. Special operations personnel must hold qualified and effective qualification certificates issued by relevant departments.

8. Before starting work, the contractor shall provide Party A with a list of construction personnel, a copy of ID card and a one-inch photo, and handle the construction personnel pass at the same time.

9. Before starting work, the contractor shall organize personnel to inspect the construction area, working environment and facilities, equipment and tools provided by Party A to confirm that they meet the safety requirements. Once the work is started, it means that the contractor has confirmed that the construction site, working environment, facilities, equipment and tools meet the safety requirements and are in a safe state.

10, the contractor shall install temporary fences or warning signs within the construction scope, and shall not go beyond the designated construction scope for construction, and irrelevant personnel are prohibited from entering the construction site. Without Party A's consent, the contractor shall not enter the place unrelated to the construction without authorization and use Party A's facilities and equipment unrelated to the construction; Party A's protective facilities and signs shall not be removed or changed without authorization.

1 1. If the contractor needs electricity and water during the construction, he shall contact Party A in advance, and shall not connect the temporary power cord or bare wire directly to the power socket or use the electric furnace. If there is a fault, immediately interrupt the operation or cut off the relevant switch.

12. During the construction period, the contractor shall complete the work, use all materials and clean up the site to ensure safe and civilized construction.

13. The contractor must accept the supervision and inspection of Party A and promptly rectify the safety rectification opinions put forward by Party A.

14. In case of personal injury, power grid and equipment accidents or unsafe conditions endangering production and operation, the contractor shall immediately report to Party A and actively cooperate with the investigation. The contractor shall submit the accident investigation report of the accident investigation team and the contractor's accident handling opinions to Party A for the record.

15, the contractor shall not hire mental patients, idiots, reeducation through labor, juvenile offenders, probation, parole, execution outside prison, bail pending trial, medical parole, criminal detention and other personnel to enter the campus construction.

16, the contractor shall put an end to the uncivilized phenomena such as shirtless and barefoot in the construction, and the construction personnel shall do a good job of personal hygiene, and shall not be unkempt or urinate anywhere.

17. contractors are prohibited from smoking on the construction site. Once found, Party A has the right to punish the construction personnel and the person in charge of the construction.

Article 3 Contact information and reply time of Party A and Party B: Party A and Party B shall communicate with each other in written or oral forms such as work contact sheets and telephone calls. After receiving the written contact from the other party, both parties shall respond within 4 hours.

Article 4 Construction security deposit

Party A reserves 10% of the project payment as the contractor's security deposit. If there are no serious personal injuries, power grid and equipment accidents or above during the project completion acceptance, the contractor shall return the deposit in full; In the process of construction, in case of the following safety accidents for which the contractor is responsible, the corresponding amount of safety deposit shall be deducted:

(1) In case of fatal accident, major accident of power grid and equipment, all safety deposit shall be deducted;

(2) Personal injury accidents, power grid and equipment accidents shall be deducted by 50% of the deposit;

(3) The economic penalty for the illegal behavior of the contractor's personnel shall be deducted from the deposit according to the penalty provisions.

Article 5 Liability for breach of contract

1. If the other party or the third party suffers personal injury, equipment damage and other property losses due to the contractor's responsibility, the contractor shall bear the corresponding responsibilities and compensate the other party or the third party for all losses caused thereby.

2. During the performance of the contract, if it is found that the relevant qualification materials provided by the contractor are invalid, Party A has the right to terminate the contract, and the contractor shall bear all losses caused thereby.

3. If the contractor's on-site operators are found to have violated the rules, they shall deduct the money from similar violations of Party A's employees according to Party A's safety production reward and punishment regulations, and bear the corresponding liquidated damages.

4. If the contractor fails to set up safety supervision personnel, correctly and comprehensively implement safety technical measures and construction organization design, and the construction personnel fail to grasp the characteristics and construction safety measures of this project, and the construction machinery, instruments and safety protection articles used in this project cannot meet the construction needs, Party A has the right to require the contractor to stop work immediately for rectification, and the consequences and losses caused thereby shall be borne by the contractor.

5. If the safety working procedures of the contractor's personnel are unqualified, the contractor shall bear the liability for breach of contract of 50 yuan/person-time; The contractor whose special personnel work without a license shall bear the liability for breach of contract of 100 yuan/person.

6. If the contractor uses the facilities, equipment, tools and instruments provided by Party A to cause damage, it shall pay compensation according to the price.

7. If the contractor's personnel go to places outside the construction area without reason or use Party A's facilities and equipment without authorization, the contractor shall be liable for breach of contract at the rate of RMB 100 per person.

8. If the contractor fails to rectify the safety rectification opinions put forward by Party A in time, the contractor shall be liable for breach of contract at the rate of 200 yuan to 1 1,000 yuan/day for each overdue day.

9. In case of personal injury or death, power grid and equipment accidents and failure to report them, the fault party shall bear the liability for breach of contract ranging from 3000 yuan to 10000 yuan/time, in addition to being handled by the relevant government departments.

Article 6 Any dispute arising from the execution of this Agreement shall be settled by both parties through consultation and mediation. If negotiation or mediation fails, either party may bring a lawsuit to the Tianhe District People's Court in Guangzhou.

Article 7 Party A and Party B must strictly perform this agreement, and the legal effect of this agreement is independent of the main contract.

Article 8 The term of validity of this agreement is: from the date of the month to the date of the month.

Article 9 This Agreement shall come into force after being signed and sealed by the legal representatives or entrusted agents of both parties.

Article 10 This Agreement is made in quadruplicate, with Party A and Party B holding two copies respectively.

Article 11 The following seven items are annexes to this Agreement:

1, the relevant qualification certification materials of the contractor required for contracting the project;

2, the contractor construction safety technical organization measures;

3, the contractor's special operations personnel qualification certificate;

4, the contractor's project construction organization design;

5, a, the contractor construction safety technical disclosure records.

In order to ensure the construction quality of the project, our company solemnly promises to be responsible for the quality within the construction scope according to the construction contract. The basic contents of the commitment are as follows:

1. Obtain the qualification certificate of corresponding level according to law, and undertake the project within the scope permitted by its qualification level.

2. Establish a quality responsibility system and be responsible for the construction quality of the construction project. Require the project leader to keep records of the construction site, and decompose the responsibility to the person in charge of each partial project, and the project leader shall be jointly and severally liable.

3, according to the engineering design drawings and construction technical standards, do not modify the engineering design without authorization, do not cut corners. In the process of construction, if mistakes are found in design documents and drawings, comments and suggestions shall be put forward in time.

4, according to the engineering design requirements, construction technical standards and contract, inspection of building materials, building components, equipment and commercial concrete; Without inspection or unqualified inspection, it shall not be used.

5, establish and improve the construction quality inspection system, strict process management, completes the concealed engineering quality inspection and record.

6. The test blocks, test pieces and related materials involved in structural safety shall be sampled on site under the witness of the construction unit or engineering supervision unit. And send it to the quality inspection unit with corresponding qualification grade for quality inspection.

7, training system, strengthen the education and training of employees; Personnel who have not received education and training or failed the examination shall not work at their posts.

8, according to the law to fulfill the obligation of engineering quality warranty.

Construction unit: xxx

Date: x year x month x day

In order to ensure the smooth implementation of the project, realize safe and civilized construction and ensure the quality of the project, we solemnly promise as follows:

1, comply with relevant safety regulations, and construct according to the quality acceptance standard proposed by the supervision unit entrusted by Party A;

2. Before construction, organize construction personnel to learn relevant safety laws and regulations, and take safety protection measures during construction to prevent safety accidents. Our company is responsible for safety accidents such as communication, traffic and personal injury caused by improper construction;

3. Take care of all kinds of facilities on the construction site and do not damage other road facilities. If there is any damage, the company will be responsible for compensation; Our company is responsible for disputes or compensation caused by the construction scope exceeding the route;

4. During the construction period, the person in charge of our unit or site management personnel will supervise the construction at the site; 5, construction materials piled up, shall not occupy the fire escape and public places, construction waste, waste to clean away, tidy up the scene after installation;

6, actively cooperate with the highway management department and supervision unit to do a good job of safety inspection.

Commitment unit:

Contact person:

Time: 20xx MM DD YY

Project Construction Commitment Letter Model 8 In order to ensure the construction safety of Wanbo Mall Phase II interior decoration project, Party B's construction contractor:

Solemnly promise to be responsible for the safety management within the scope of this project in accordance with the construction contract. The basic contents of the commitment are as follows:

I promise that during the construction period, I will strictly follow the requirements of Henan Tiandi Decoration Engineering Co., Ltd. and the general contractor on site, clarify the safety responsibilities in accordance with relevant laws and regulations, do a good job in the construction organization design and technical disclosure of construction safety, and obey the daily management and inspection of relevant departments of the company.

Second, promise to carry out safety education for the construction personnel of this unit, have a sound safety management system and training and education records, and ensure that the construction personnel do not violate the company's safety regulations and national laws and regulations. Obey the supervision of Henan Tiandi Decoration Engineering Co., Ltd. and the site general contractor.

3. Devote to civilized construction, ensure that there are no fire safety accidents and industrial accidents at the site, set up a person in charge of on-site safety, explain the guarantee of construction fire safety work and the implementation of construction scheme to relevant departments of the company, and ensure the safety of construction personnel, the company and third-party personnel and property. In case of any accidents or casualties caused by construction, the constructor promises to take full responsibility, which has nothing to do with Henan Tiandi Decoration Engineering Co., Ltd. and the site general contractor.

Fourth, provide employees with labor protection articles that meet the national standards or industry standards, and supervise and educate them to wear and use them correctly according to regulations.

5. Promise that the construction personnel will consciously abide by the safety management regulations of Party A.. If man-made unsafe behavior endangers personal and property safety, it must be rectified unconditionally and immediately, accept the inspection and supervision of the functional departments of Party A's company, and resolutely rectify the problems in the Notice of Non-conformance Rectification issued by relevant departments of the company.

Six, the company's safety supervision personnel found that there are major unsafe factors, at any time have the right to ask the construction party to stop work for rectification, and the construction party shall not continue to force construction in violation of regulations.

Seven, this letter of commitment is the effective proof of Henan Tiandi Decoration Engineering Co., Ltd. and the on-site contractor's external construction safety supervision, which is an annex to the contract and has legal effect. If the commitment party violates it, it shall be handled according to the third opinion.

Eight. Security issues include but are not limited to the above. For matters not covered, refer to national laws and regulations and the terms of this undertaking.

This undertaking is made in triplicate. (The company keeps one copy, the project department of the company keeps one copy and the contractor keeps one copy. After the construction is completed, the contractor will take this letter of commitment as the settlement voucher. )

Contractor: ID number: person in charge of the site: ID number: date: _ _ _ _ _ date: Tel: _ _ _ _ _ Tel:

In order to ensure that no safety accidents occur during the whole construction period, our unit promises to the engineering headquarters as follows:

1. Ensure that the safety precautions during construction are carefully organized to ensure that no safety accidents occur during construction. In the event of a safety accident, all consequences shall be borne by the unit itself.

2, establish and improve the site safety, transportation safety, earthwork safety, electricity safety, all kinds of mechanical safety and other safe operating systems.

3, equipped with full-time security officer, hanging safety construction slogan.

4. Ensure that all working procedures are carried out according to the construction laws, design drawings and requirements of the supervision unit.

5. The engineering construction involving changes must be carried out in declare in advance according to the approved construction drawings, and the construction organization design and safety construction scheme shall be prepared.

6. Always remind construction personnel, construction vehicles and mechanical drivers to pay attention to safe construction.

7. Formulate feasible emergency plans for construction accidents.

8, into the foundation pit wall personnel do wear safety helmet.

9, the construction site before start working, according to the construction general layout and division, subdivisional work layout, arrange the location of the construction shed, materials piled up.

10. The pits, wells, ditches, steep slopes and lines in dangerous areas on the construction site should be marked with "Danger" or "No Access", and red light signals should be set at night.

1 1, the roads on the construction site must be kept clear, there is enough lighting for construction at night, and the erection of electrical lines must meet the requirements of electrical regulations.

12. Materials and equipment on the construction site must be stacked neatly and firmly, and dismantled templates and waste materials should be removed in time.

13, the food hygiene of the construction site must comply with the provisions of relevant laws and regulations.

14, excavation construction must leave a certain slope according to the soil conditions (the slope depends on the soil conditions).

15, the construction site that may affect the safety of pedestrians must set up obvious safety warning signs.

16, mechanical operation, someone must be on-site unified command operation.

17. Before operation, the driver should check the machinery and safety braking device in detail to ensure safety and reliability. All mechanical drivers must hold relevant certificates.

18, the operation and use of all kinds of machinery must be carried out in accordance with the operating procedures of the machinery itself.

19. All bridges and culverts, roads, original sewer pipes and all wires and cables along the construction line shall not be damaged.

Commitment unit: Commitment person:

Date, year and month

Model Letter of Commitment for Project Construction 10 In order to effectively prevent and eliminate all kinds of unsafe factors in project construction, our company made the following commitments to the construction project of Qingzhen New Campus of Guizhou Communications Vocational and Technical College:

First, make sure to set up construction safety (warning) signs at the eye-catching position of the entrance and exit of the construction site. Eye-catching warning signs should be set up in key places and key parts of safety management in engineering construction.

Second, formulate construction safety management organization and safety management responsibility system, equip full-time and part-time safety officers for engineering construction projects, and earnestly implement various construction safety management regulations.

Three, all engineering construction workers must go through safety education and technical operation training, special type of work workers must have the corresponding technical qualification certificate.

Four, all kinds of auxiliary materials (equipment) needed in the construction should have the product certificate, the installation and use of auxiliary equipment should comply with the safety management regulations, and strictly implement the safety operation procedures.

Five, to ensure the safety of capital investment, to meet the conditions of safe production, to provide employees with labor protection articles in line with national standards or industry standards, and to urge them to wear and use according to regulations.

Six, in accordance with the requirements of relevant national laws and regulations and relevant national or industrial safety standards and norms, formulate preventive measures to ensure that all links meet safety requirements, implement emergency measures for operating posts, and formulate emergency rescue plans and safety precautions for production safety accidents according to law.

Seven. In case of any safety accident during construction, our company is willing to bear corresponding responsibilities.

Name of unit (seal): legal representative (signature):

Project manager (signature): full-time safety officer (signature):

date month year