Joke Collection Website - News headlines - What does the project fee for safety protection and civilized construction measures include?

What does the project fee for safety protection and civilized construction measures include?

On-site safety and civilized construction measures fee components 1. Safety production 1. Preparation of safety materials, purchase of safety warning signs and setting up of publicity boards; 2. "Three Treasures", "Four Ports", "Five Ports" The cost of "edge" protection; 3. The cost of safe electricity use in construction, including standardization of electrical boxes, electrical protection devices, and external power protection measures; 4. The safety of cranes, tower cranes and other lifting equipment (including derricks, gantry) and external elevators The cost of protective measures (including warning signs) and the cost of edge protection of the unloading platform, inter-layer safety doors, protective sheds and other facilities; 5. Inspection and testing costs of hoisting machinery at construction sites; 6. The safety of construction machinery protective sheds and their fences Cost of protective facilities; 7. Cost of safety protection passages at the construction site; 8. Cost of purchasing protective equipment and equipment for workers; 9. Cost of configuration of fire-fighting facilities and fire-fighting equipment; 10. Cost of electrical protection and safety lighting facilities; 11. Other safety Cost of protective measures. 2. Civilized construction 1. The cost of the gate, five signs and one picture, worker badges, and corporate logo; 2. The cost of beautifying the enclosure (including internal and external painting, whitewashing, slogans, etc.) and roof decoration; the cost of whitewashing the toilet bowl on site, Cost of veneer tiles, cement mortar floor or floor tiles, temporary toilet facilities in the building; cost of decoration and beautification measures for other temporary facilities at the construction site; 3. Cost of on-site sanitary facilities; drinking water equipment, showers, disinfection, etc. that meet sanitary requirements Facility costs; clean fuel costs for domestic use; cost of measures to prevent gas poisoning, mosquito bites, etc.; 4. Hardening costs of the construction site operation site; 5. On-site pollution source control, construction waste and domestic waste cleanup and transportation, and site drainage and sewage measures The cost of dust prevention and watering in municipal projects; 6. On-site greening costs, comprehensive public security management costs, and on-site electronic monitoring equipment costs; 7. On-site medical and health care equipment, supplies, and first aid personnel training costs; 8. On-site workers Costs for heatstroke prevention and cooling, electric fans, air conditioners and other equipment and electricity costs; 9. Costs for on-site construction machinery and equipment to prevent noise and prevent disturbance to residents; 10. Costs for other civilized construction measures.