Joke Collection Website - News headlines - 2017 Petroleum Company Technician Work Summary

2017 Petroleum Company Technician Work Summary

As a technician in an oil company, you not only solve technical problems, but also work downhole. 2017 has been a busy and fulfilling year. The following is the "2017 Petroleum Company Technician Work Summary" carefully prepared for you. I hope you like it! Please lock the work summary column for more related excitement. 2017 Petroleum Company Technician Work Summary 1

This year is a rare life experience for me. This period of time is a precious experience in my life, and it also left me with many beautiful memories. I received the earnest guidance and meticulous care from the leaders and masters, and gained valuable work experience. In terms of thoughts and actions, we strive to "want to practice, know how to practice, and practice well", take cultivating work ability and improving one's own quality as our own responsibility, and also adapt to the work and life rhythm of the oil field, and have a deep understanding of the Henan Oilfield and underground The corporate culture and philosophy of the office have been fully integrated into the xx family and become a true xx person. During the one-year internship, I have been working hard to accept new knowledge, experience and accept new things, and in the process, I have found my shortcomings, clarified the direction of my future efforts, and helped myself grow and become a talent.

1. Pre-job training on factory safety education

The petroleum industry is a high-risk industry. Departments at all levels attach great importance to safety and require every employee to pay attention to safety at all times. Keep it in mind. Know safety and understand safety. Therefore, from the third-level education at the factory to the safety meeting of the team, every stage of safety education made me feel the importance of safety, and I will treat safety with a high sense of responsibility and a strong sense of mission in future work.

The pre-job training gave me a preliminary understanding of the overall situation of the xx oil field and our underground operations department, such as the history of the oil field, production and development, geological characteristics, later development and the philosophy of our underground operations department, Culture etc. During this period, I also participated in quality development training, which cultivated my ability to communicate with others, understand gratitude and repayment, and teamwork spirit, etc., which laid a good foundation for my future study and work.

2. Internship in the operation team

After being assigned to the second underground operation engineering department, I was assigned to the 203 team for internship. Team 203 is mainly responsible for the maintenance and measures of inclined and vertical wells in the No. 2 Oil Production Plant, as well as the overhaul of inclined and vertical wells. It is an operation team with a glorious tradition and has been awarded honorary titles such as Sinopec Gold Medal Operation Team and Grade A Operation Team. What I feel most here is the spiritual quality of teamwork and the friendly and harmonious atmosphere among employees.

I started to exercise at the Fourth Post, and slowly learned to pull the oil pipe, sucker rod, measure the oil pipe, and fill in the class information, but I always tried my best to do what I was asked to do. I worked hard to do a good job. The scorching sun, the scorching heat, the sultry heat, and the noise of the well workover machine all left a deep impression on me. Although I was dirty and tired, I still saw the changes that my little efforts brought to the class. You will feel very gratified and feel that everything you do is worthwhile.

Later, as time went by and I learned about some of the equipment and facilities on the well workover rig, I would also follow the master craftsmen to do some simple equipment maintenance work, such as pumping oil when the car fails to start, and replacing the car. battery, replace the basic pipelines on the car, replace the anti-collision on the car, etc. During this period, the masters taught me a lot of knowledge and experience. I also developed my hands-on ability and gained an intuitive understanding of the scene. It was a rare internship experience for me.

In addition to being responsible for the technical work of the team, technicians are also mainly responsible for the work of the team and the training of team employees. To do the work of a technician, you have to worry a lot and be careful, and you have to be able to independently handle various situations encountered on site. In the following period, I followed the technicians and learned the technical operating procedures of the operation, such as pump inspection and sealing replacement, new well production, chemical water plugging, profile control, injection plugs, drilling plugs, acidification, fracturing, salvage well droppings, and casing compensation. , small casing secondary cementing, etc. At the same time, I also learned to write and upload construction summaries, and download engineering and geological designs. When I was an intern technician on site, I deeply felt the importance of worry. During this period of work, I slowly figured out some rules, which benefited me a lot later.

(1) The problem of sand stuck and blocked in sand washing operation. During my time in the well, several sand flushing operations caused sand blockage accidents, which caused workers to unload the pipe string one more time, causing economic losses and extending the construction period.

In view of this situation, I have summarized the following rules:

(a) Before going to the well, carefully check the relevant well history and operation summary. For wells with serious sand production and serious leakage, install two cement trucks. plan.

(b) The choice of sand flushing method: forward punch, which has a large downward impact force but a small sand carrying capacity; recoil, which has a small downward impact force but a large sand carrying capacity. Backflushing operation must be used when working with a washing cylinder sleeve. When working with large-diameter tools, sand flushing is not allowed.

(c) Precautions during the sand flushing process. When flushing sand and connecting a single pipe, the pump must not be stopped; if special circumstances occur, the pipe string must be lifted quickly and the pipe string must be fully lifted after flushing the sand. Circulate for a short time to circulate the sand in the tubing or annulus cleanly. When the oil layer is buried in sand, special attention should be paid to the sand blockage caused by formation leakage when the oil layer is flushed. The well cleaning fluid should be fully circulated and the pipe string should be lowered slowly before flushing the oil layer.

(2) Issues that should be paid attention to when printing. During the operation process, printing is used to confirm the condition of the fish top and casing. However, printing is often repeated due to problems in the selection of the printing and the construction process, which will cause economic losses and extend the construction period.

In view of this situation, I have summarized the following rules:

(a) Check the relevant design and site conditions to select the appropriate printing model;

( b) Before the lead mold is run into the well, there should be no scars that would affect the judgment of the impression;

(c) The drilling speed should not be too fast to prevent the lead mold from being bumped and deformed midway, which would affect the analysis results;

(d) When lowering the lead mold to a single piece above the top of the fish, start the pump to rinse. Pressurize and print after the fish top is flushed;

(e) The printing weight on bit is generally pressurized to 30kn. It can be increased or decreased appropriately in special circumstances, but the increase in the weight on bit cannot exceed 50kn;

(f) When printing and pressurizing, you can only pressurize once and do not print twice to avoid repeated impressions that are difficult to analyze.

3. Learning of other aspects of knowledge

Due to the face-to-face contact and detailed explanations by the masters in the tool shop in Operation Part 2, I became familiar with well workover tools, including salvage and undercut tools. , casing scraping tools, etc., and have a better understanding of downhole pumps, especially downhole packers and control tools. These have laid a solid foundation for me to choose the appropriate tools when encountering complex underground situations on site. I deeply understand the true meaning of "Only when safety can produce, safety can be profitable, and safety can go home." At the same time, I understand the dangers of blowout and the importance of well control, because the oil field can only work if it does not happen. Only when safety and blowout accidents occur can normal production be carried out.

In terms of ideology, I continue to strengthen party and government study and improve my political and ideological quality.

I can strictly demand myself in terms of ideology and politics, pay attention to current affairs and politics, which are related to the reform and development of the country. I always demand myself with correct political views, ideological views and outlook on life, and resolutely support the principles and policies of the national leadership. Actively study socialist theoretical ideas. Love the collective, respect superiors, unite colleagues, be willing to help others, and improve their ideological and political literacy through active collaboration with colleagues. In addition, at work, I strictly demand myself, be full of passion, dare to take responsibility, carefully study the superb skills of my colleagues, have high safety awareness, rich protection skills and equipment fault handling capabilities; I am virtuous and treat people with generosity. I usually pay attention to getting along harmoniously with my colleagues, always put myself in others' shoes and be considerate of others' difficulties. In terms of consciousness, I actively moved closer to the party organization and constantly studied some policies and documents of the country and the unit, laying a good ideological and theoretical foundation for the smooth development of various tasks and the completion of high quality and high standards.

In terms of work, I continue to strengthen the study of technical theory and focus on the improvement and accumulation of on-site skills and experience.

I have developed the habit of taking notes. I write down the work I have to do and the lessons learned at work in a notebook every day. I read it in my spare time and summarize the reasons for success and failure in a timely manner. During this period, I also consulted work-related materials such as underground operation operating procedures, underground operation industry technical standards compilation, underground workers, and previous textbooks from time to time, striving to improve myself in a short period of time.

In addition, whether it is work or life, I always remind myself to have requirements for myself, to constantly learn from other outstanding colleagues, to work seriously and meticulously, to constantly improve my work level, and strive to be responsible Do your job to perfection. Over the past year, I have participated in most of the technical work on the team. Follow the team to the well, conduct on-site technical briefings, supervise and inspect employees' on-site operation execution, monitor on-site construction, identify hazards and rectify hidden dangers on site; conduct laboratory analysis of oil and water samples; write daily reports, summaries, and work logs; participate in review materials, Participate in well control drills, etc. Now, I can combine theory and practice very well, have made great progress in technology, well control, safety and management, and can successfully complete the tasks assigned by the leadership. And we made our own contributions in our team being awarded the gold medal oil test team by Sinopec Group Corporation and creating the xx "Worker Pioneer" activity.

Existing shortcomings and plans:

I have gained a lot from this year, but there are also shortcomings:

1. Experience and experience in solving on-site problems The ability is still a bit lacking and needs to continue to accumulate on-site experience.

2. Internship experience more grassroots positions to understand the work of the oilfield grassroots from many aspects.

3. I am still lacking in homework skills and need to continue to learn and accumulate. Plans for the next step:

1. While studying from books, learn from practice, and strive to improve the understanding of operating procedures;

2. Further study the methods and techniques of on-site management, and During the internship process, I constantly summarize my own experience and the experience of my predecessors (diligently summarizing and being good at summarizing) to continuously enrich and enrich my life and work experience.

3. Continue to maintain good study habits, be humble, open-minded, and be diligent with your eyes, mouth, hands, and legs.

4. Learn English by yourself, continuously improve your speaking level, and strive for opportunities to enter overseas markets.

In the future, I will further strengthen technical learning, work hard, give full play to my personal strengths, constantly improve myself, and contribute to the unit. 2017 Petroleum Company Technician Work Summary 2

Through the leadership’s care, the help of colleagues, and my own efforts and adjustments, I also gained some preliminary understanding of the company’s organizational structure, work processes and other aspects. At the same time, I also have some experiences and thoughts. I would like to take this opportunity to talk about my work summary in 2017:

First of all, let me talk about the change in my mentality during this period.

Frankly speaking, it is hypocritical and empty talk to say that you have been devoted to your work with fire-like enthusiasm since you came to the company. It can be said that the process of working during this period is also a process of continuous adjustment and maturity of my own mentality. At first I thought that as long as I give full play to my strengths, no matter what kind of work I do, I won’t feel tired at work. But I asked myself, how can I apply the knowledge I learned and what are your strengths? I was confused when I first started working. I don't know my position. Without any psychological preparation, the work assigned to me by the company seemed boring and unremarkable at first glance. It is easy to complete the work, but it is not easy to do the work well and creatively. Therefore, after adjusting my mentality, I gradually understood that there are opportunities to develop talents and increase knowledge in every position. If we can do the most ordinary work with full enthusiasm, we can become the most exquisite workers; if we do the most noble work with a cold attitude, we will only be a mediocre craftsman.

The adjustment of my mentality made me understand better that no matter what I do, I must try my best. The presence or absence of this spirit can determine a person's future career success or failure. If a person understands the secret of avoiding hard work at work by working hard, then he has also mastered the principle of achieving success. If he can work with a proactive and hard-working spirit at all times, his life experience will be enriched no matter what position he is in. With a positive attitude, you will have a lifetime of success.

(1) Learning is endless, and career is just a continuation of student life. The important thing is to apply the theoretical knowledge learned in school to work and further improve and sublimate it.

(2) Even the most basic work requires continuous innovation and improvement to improve work efficiency.

In the petrochemical plant, you can see safety tips everywhere. Every corner related to safety is equipped with fire extinguishers, fire guns, etc., and there are eye-catching safety slogans everywhere you see it. Every employee We all have a strong sense of safety, and every job highlights the importance of safety. I think it is precisely because of such a subtle environment that the safety awareness of oil people is so strong, which also highlights how well the safety concept is implemented.

On the production front line, the leaders are very friendly to us, and we feel that there is no sense of distance when communicating with them. I realize that the core of corporate culture is: safety, people-oriented, integrity, responsibility, innovation and cooperation. Perhaps it is the people-oriented corporate culture of Daqing Petroleum that can promote humanistic care in the operation and management of the group and its affiliated oil companies, and harmonious unity in the details of grassroots work, so as to achieve excellence in performance.

If a person has a spirit, he will be invincible, and if an enterprise has a spirit, it will prosper forever. Daqing people have such a spirit - Daqing spirit and Iron Man spirit. Over the past 50 years, the spirit of Daqing and the Iron Man spirit have been passed down from generation to generation. From Wang Jinxi, who "would rather lose twenty years of life and work hard to win the big oil field" to Wang Qimin, the "iron man of the new era" who "would rather work hard to make the oil field highly productive and stable." Over the past half century, heroes have emerged in Daqing Oilfield in large numbers. Over the years, every team of Daqing Oilfield has regarded inheriting the spirit of Daqing and the Iron Man spirit as its historical mission and political responsibility. It has been passed down from generation to generation and passed on from generation to generation. Daqing spirit and Iron Man spirit have become the soul of Daqing.

When an iron man walks in front, thousands of iron men follow. Inspired by the Daqing spirit and the Iron Man spirit, Daqing Oilfield heroes emerged in large numbers, and there were Iron Men everywhere. The masters of our team have been sticking to their jobs for decades. This is a manifestation of the iron man spirit. I think all the masters have set a good example for us. I believe that in the future work and life, my colleagues and I will definitely inherit and carry forward this spirit. In short, I will use Taking the company's business philosophy as the coordinate, I integrate my knowledge background with the company's specific environment, use my energetic and receptive advantages to work hard to learn business knowledge and leading technologies, and do my best to contribute to the company's development. Make our contribution to our Kunlun Gas Heilongjiang Branch. Summary of the work of oil company technicians

In 2017, the first team I was in was mainly responsible for the maintenance and measures of the inclined vertical wells of the No. 1 oil production plant, as well as the overhaul of the inclined vertical wells. It is an operation team with a glorious tradition. It has been awarded the honorary title of Sinopec Gold Medal Operation Team, Grade A Operation Team, etc. Here for one year, what I feel most is the spiritual quality of teamwork and the friendly and harmonious atmosphere among employees. .

The following summary is made:

The work of the oil production team is indeed very hard, it can be said to be dirty and tiring. Slowly learned about oil production tools such as oil pipes, sucker rods, dipsticks, and sucker rods. The scorching sun, the sweltering heat, and the noise of the well workover machine all left a deep impression on me. Although it was dirty and tiring, I still felt relieved to see that we had a better understanding of the construction site because of ourselves, and felt that everything we did was perfect. It's worth it.

Understood the technical operating procedures of operations, such as pump inspection and sealing replacement, new well production, chemical water plugging, profile control, injection plugs, drilling plugs, acidification, fracturing, salvage well droppings, casing compensation, Small casing secondary cementing, etc., and also learned about writing and uploading construction summaries, downloading engineering and geological design.

(1) The problem of sand sticking and blockage in sand washing operations. During the well loading process, there will be sand flushing operations that will cause sand blocking accidents, causing workers to run down the pipe string one more time, causing economic losses and extending the construction period.

We have summarized the following rules for this situation:

(a) Before going into the well, carefully check the relevant well history and operation summary. For serious sand production and serious leakage, For the well, two cement trucks are planned.

(b) The choice of sand flushing method: forward punch, which has a large downward impact force but a small sand carrying capacity; recoil, which has a small downward impact force but a large sand carrying capacity. Backflushing operation must be used when working with a washing cylinder sleeve. When working with large diameter tools, sand flushing is not allowed.

(c) Precautions during the sand flushing process. When flushing sand and connecting a single pipe, the pump must not be stopped; if special circumstances occur, the pipe string must be lifted quickly and the pipe string must be fully lifted after flushing the sand. Circulate for a short time to circulate the sand in the tubing or annulus cleanly.

When the oil layer is buried in sand, special attention should be paid to the sand blockage caused by formation leakage when the oil layer is flushed. The well cleaning fluid should be fully circulated and the pipe string should be lowered slowly before flushing the oil layer.

(2) Issues that should be paid attention to when printing. During the operation process, printing is used to confirm the condition of the fish top and casing. However, printing is often repeated due to problems in the selection of the printing and the construction process, which will cause economic losses and extend the construction period.

In view of this situation, I have summarized the following rules:

(a) Check the relevant design and site conditions to select the appropriate printing model;

( b) Before the lead mold is run into the well, there should be no scars that would affect the judgment of the impression;

(c) The drilling speed should not be too fast to prevent the lead mold from being bumped and deformed midway, which would affect the analysis results;

(d) When lowering the lead mold to a single piece above the top of the fish, start the pump to rinse. Pressurize and print after the fish top is flushed;

(e) The printing weight on bit is generally pressurized to 30kn. It can be increased or decreased appropriately in special circumstances, but the increase in the weight on bit cannot exceed 50kn;

(f) When printing and pressurizing, you can only pressurize once and do not print twice to avoid repeated impressions that are difficult to analyze.

We should do this in the oil production process

1. Learn from the advanced working methods of inspection and study, implement the unit work policy, conscientiously study and practice the scientific development concept, and strive to improve the overall performance of the oil production team management level.

2. Improve the internal data of the oil production brigade, combine the actual work of the oil production brigade, summarize the work gains and losses, formulate management methods suitable for the actual work of the brigade, and implement them into actual work.

3. Strictly implement various management systems, assessment systems and management methods, refine the assessment methods for the oil production team, consolidate work responsibilities, and improve work efficiency.

4. Actively seek scientific development paths, strictly control production costs, and strive to complete various production tasks.

The production and operation of the petroleum industry cannot be completed by one or two people. It requires teamwork to complete various things. A well team completes equipment disassembly, moving, installation and drilling in one day, which requires everyone to participate. Problems in any link will affect the overall efficiency.

The same is true for production units. From the collection of data, collation, analysis, formulation of corresponding measures, and construction of projects, everyone needs to do their part. Everyone is busy with their own work every day. I am really lucky to be able to integrate into it and experience it. I hope I can work in such a working environment and serve the company in 2018!

I highly recommend