Safe and civilized construction management at the project site?

Safe and civilized construction management at the project site is very important. Only by observing civility can construction be carried out better. The handling of every construction detail is very critical. Zhongda Consulting would like to introduce to you the safe and civilized construction management at the project site.

1. The construction site must have obvious seven signs and one picture. The seven signs and one picture must be set up according to standards and comply with Party A’s unified standards.

2. The construction site should have appropriate slogans and safety warning signs.

3. Management personnel and construction workers at the construction site should wear ID cards to prove their identity. Non-construction personnel are not allowed to enter the construction site without authorization. The content and form of this card shall be drawn up by the construction unit and Party A must be notified.

4. Before construction, the construction unit must arrange temporary facilities in the area specified by Party A, and must submit all construction general layout plans to Party A for review and approval before it can be implemented. .

5. The construction unit will set up containment facilities around the construction site and carry out closed containment facility operations. There will be no garbage or sewage within 50 meters of the construction site and 100 meters of the entrance and exit. The surrounding area of ??the construction site will be kept clean and in strict accordance with Chengdu City Environmental and health management regulations are implemented.

6. The construction site should ensure that the access roads are smooth, flat, solid, and have room for maneuver. The construction site should have reliable drainage measures. Construction sewage sedimentation should be discharged into designated places, and the drainage system should be in normal use. .

7. The construction unit shall reasonably arrange various temporary facilities in accordance with the general construction layout plan, stack bulk materials, finished products, semi-finished products and construction machinery and equipment, reduce secondary transport and relocation, and shall not encroach on on-site roads and Safety protection and other facilities. Scattered debris, garbage and dirt inside and outside the building should be cleaned up in time. Materials and debris must not be stacked on stair steps, rest platforms, balconies and other overhanging structures. On the construction work surface, workers should "clean their feet after finishing the work".

8. The construction unit should pay attention to and strengthen the health and disease prevention work at the construction site: the staff canteen should comply with the standards stipulated in the "Food Hygiene Law of the People's Republic of China" and apply for a "Health Permit" ; Canteen staff must first undergo a physical examination and pass the training before they can work with a certificate; if any infectious disease or suspected infectious disease is discovered, they should be treated in a timely manner and reported to the health and epidemic prevention agency.

9. Comply with national laws and regulations on environmental protection, and take effective measures to control environmental pollution and harm caused by various dust, waste gas, solid waste, noise, and vibration at the construction site.

10. In strict accordance with the provisions of the "Fire Protection Regulations of the People's Republic of China and the State", establish and implement a fire prevention management system at the construction site, set up fire protection facilities that meet the requirements, and maintain them in a good standby state. Special fire safety measures should be taken when constructing or storing or using fuel or explosive equipment in fire-prone areas. Implement the principle of "whoever does the work is responsible for safety and fire prevention".

11. The responsibility system for comprehensive social security management must be strengthened at the construction site. In the event of a public security emergency, it must be reported immediately to the public security organs without delay or concealment. If migrant workers are needed, they must apply for valid certificates in accordance with relevant regulations. The construction site should be clearly divided into the construction area and the living area, and the sanitation and safety management of the dormitory should be done well. The windows should be clear and the floor should be clean, daily necessities should be stacked neatly, and safe electricity use and fire prevention measures should be taken in the dormitory.

12. Management personnel and workers of the construction unit must wear safety helmets at the construction site. The color of the safety helmets should be easy to distinguish; when working at heights greater than 2m, safety belts must be worn, so that they can be used high and low. Be firm, set up necessary warnings, and drop objects from high altitudes are strictly prohibited. Workers in the construction unit are not allowed to get on or off the steel hoops of the columns, and they are not allowed to walk on the steel frame regardless of whether it is fixed or not. Especially for the beam bars, "safety first" must be given.

13. Each construction unit should focus on key parts and links such as deep foundation pits, high (large) formwork, tower cranes and vertical transportation machinery, scaffolding, construction electricity, temporary facilities and walls at the construction site. Inspect and monitor to prevent major accidents.

14. Construction workers in the construction unit wear uniform standard construction vests to work and must keep them clean.

15. If the construction unit discovers pipelines, cables and other buried objects during earth excavation, it should be reported promptly and shall not be exposed without authorization. During earthwork construction without grading and excavation depth exceeding 1.5 meters, correct wall protection measures approved by Party A's on-site representative must be adopted; when transporting earthwork, a "dregs disposal permit" should be obtained and the surrounding environment should be cleaned. Hygiene; straw mats should be laid within 20 meters of entrances and exits; during construction, personnel must be sent to clean contaminated roads, and the roads must be thoroughly cleaned after construction. If earthwork is stacked on site, it should be 50cm away from the fence and more than 100cm away from the operator; manual excavation should be used within 1m on both sides of the cable.

16. During the main body and decoration construction, the construction unit must erect the outer frame and hang the safety net. Its "Scaffolding Erection and Disassembly Plan" should be submitted in writing to Party A for approval before it can be implemented. , the erection of scaffolding should comply with the "Safety Requirements for Scaffolding Erection", and special attention should be paid to the supervision of situations where the external frame connecting wall rods are removed at will just for the convenience of construction, which affects the safety of the scaffolding.

17. The construction unit should perform normal and regular maintenance on on-site machinery and equipment. The use of vertical transportation machinery (such as tower cranes, gantry frames, etc.) requires a license issued by the Labor Bureau before it can be used. For tower cranes on adjacent construction sites, all construction units should coordinate with each other to prevent tower crane collision accidents.

18. The construction unit should have a person in charge of construction at the construction site at all times, and there should be no phenomenon of no person in charge of construction. If the person in charge of construction is not available, a temporary person in charge should be designated.

19. The project manager or responsible foreman of the construction unit should arrive at the construction site on time when working. If there is an emergency, he should ask Party A’s on-site representative for leave approval. The results of his assessment by our company’s on-site representative , will serve as an important basis for measuring the management level of construction units.

20. During night construction, the construction unit must have managers on duty, and the list of managers on duty should be reported to Party A.

21. In order to facilitate the connection, Party A implements the on-site weekly meeting system. The time and location will be notified by Party A at that time. The project managers and responsible foreman of each construction unit must attend on time and must not be late or absent without reason. If you are one minute late, you will be fined 20 yuan. Party A implements a target responsibility system for the management of the construction unit, that is, it proposes next week's plan (including quality, progress, safety, and civilized construction) at weekly meetings, and at the same time checks the completion of this week's plan.

22. Before construction, each construction foreman shall make safety technical explanations to the construction workers in writing, keep written records, and accept the supervision of Party A’s on-site representatives at any time.

23. Temporary electricity must be arranged in a unified manner, implement a three-phase five-wire system, and have repeated grounding and zero protection. All electrical equipment is equipped with leakage switches, and the entire implementation process is supervised and inspected to ensure timely discovery and supervision of potential safety hazards in electricity use. Detailed safety technical explanations must be conducted before using electricity in construction.

24. Each construction unit should formulate safety production plans for summer and winter construction sites according to different seasons, including vertical transportation equipment, lifting equipment, temporary electricity at the construction site, various construction scaffolding, and deep foundations. Inspection and prevention of key areas such as (pit, trench) operations, manually dug piles, construction site edge protection and fire safety will be strengthened. Strengthen safe and civilized construction and dust control in accordance with Document No. 92 issued by the Chengdu Construction Commission [2006].

25. In the construction organization design, each construction unit must formulate a construction safety plan mechanism and conduct drills in accordance with the requirements in order to be prepared. At the same time, according to the characteristics of summer construction, we will do a good job in heatstroke prevention, organize flood control emergency plan drills, and make preparations for emergency rescue and disaster relief.

26. All construction units must strictly implement the "Safety Code for Electricity Supply and Consumption at Construction Sites" (GB50194-93), "Technical Code for Safety of Work at Heights in Construction" (JGJ80-91) and "Use of Construction Machinery" Safety Technical Specifications" (JGJ33-2001) "Building Construction Safety Inspection Scoring Standards" (JGJ59-99) "Safety Technical Specifications for Temporary Electricity Use at Construction Sites" (JGJ46-2005) and Sichuan Province, Chengdu City, and *** District's construction Requirements and notices for safe and civilized construction management of projects.

27. For those who violate the norms, procedures and the above-mentioned articles, our company will impose a fine of 50-2,000 yuan as appropriate. The calculation of safe and civilized construction measures fees is in accordance with the relevant spirit of the "Sichuan Provincial Construction Project Safety and Civilized Construction Measures Fee Valuation Management Measures" issued by the provincial department (Sichuan Jianfa [2006] No. 107), and the implementation of safe and civilized construction at the construction site is analyzed. Comprehensive scoring and evaluation at each stage, the evaluation results will be used as an important basis for the construction unit to calculate the safe and civilized construction measures fee from the construction unit.