Minutes of the Acceptance Meeting of Foundation and Foundation Division Projects

The foundation and foundation are an important part of the building. The following are the minutes of the acceptance meeting of the foundation and foundation division projects. Welcome to read!

Minutes of the acceptance meeting of the foundation and foundation division projects 1

Meeting time

20XX May 30, 3:00 pm

Meeting location

Construction site conference room

Participants

Hubei Xinchuyuan Real Estate Co., Ltd.

Enshi Prefecture Tiangong Construction Survey and Design Co., Ltd.

Hubei Three Gorges Construction Project Management Co., Ltd.

Enshi Prefecture Construction Project Quality Supervision Station

Jiangsu Yancheng Second Construction Group Co., Ltd.

Moderator: (Wang Qingran)

Read out the project acceptance plan and introduce the personnel of the units participating in the acceptance:

Hubei Xinchu Yuan Real Estate Co., Ltd.

Enshi Prefecture Tiangong Construction Survey and Design Co., Ltd.

Hubei Three Gorges Construction Project Management Co., Ltd.

Enshi Prefecture Construction Project Quality Supervision Station

Jiangsu Yancheng Second Construction Group Co., Ltd.

1. Self-evaluation of the construction unit:

1. Han Chaolong reported on the construction status of the foundation division.

2. Based on the on-site quality inspection and data inspection, the construction unit believes that the data is basically complete, the visual quality is qualified, and the self-evaluation of the quality of the foundation branch project supervision is qualified. If the concrete specimens that have not yet reached their age fail to pass the later tests, the construction party shall bear all responsibilities and apply for the next step of construction.

2. Evaluation report of the supervision unit

The basis of our evaluation is the current laws, regulations, design drawings and change basis. Our side station is in place and the on-site construction data is qualified. . In terms of data verification: all steel materials are qualified, and the concrete has not reached the age, so it will not be evaluated. In order not to affect the construction period, the next construction process is agreed.

The safety inspection is scheduled until Friday. Safety slogans, safety banners, safety signs and other warning facilities must be made, and safety work must be done carefully. Regarding the tower crane: the foundation of the tower crane has soft soil that needs to be treated. The foundation of the 1# tower crane is soaked in water and must be processed in time; the 2# tower crane needs to be maintained and painted with anti-rust paint.

In terms of quality: The distance between the stirrups of the main column is too large and needs to be rectified in time.

3. Geological survey unit: Agree with the opinions of the construction unit, the impression is average, and agree to the next step of construction.

IV. Construction unit quality assessment:

The basic work of 10#12# has been basically completed and accepted together with 13# and 18#. The acceptance supervision notice must be handed in as soon as possible.

Agree with the design, geological survey, and supervision opinions, and ask the construction unit to pay close attention to the quality of column steel bars and regain the construction period.

5. Enshi Prefecture Quality Supervision Station

If 10#, 12#, 13#, and 18# are approved for acceptance, a three-day notice will be required for future acceptance applications. The data is lagging behind a bit. The final evaluation of the main body of this project is based on the results of the test blocks with the same conditions, not the standard maintenance test blocks. The test report on the compaction degree of the 13#18# earthwork has not yet been released. You must read it next time for acceptance.

Six. Constructor

Manager Han: We must improve the deficiencies in construction and the gaps in data to achieve better construction.

7. The project director announced the acceptance results: Supervision Engineer Forum

The acceptance group unanimously agreed that the sensory quality was assessed as qualified. Since the test block has not reached the age, the quality level is temporarily If there is no assessment, other acceptance items are qualified, and the construction of the next process is agreed to proceed. The construction party shall bear all responsibilities for the unaged concrete test blocks.

8. Enshi Prefecture Quality Supervision Station:

1. The acceptance personnel, acceptance basis and acceptance procedures meet the requirements.

2. The random inspection information meets the acceptance conditions.

3. All participating units agreed on the acceptance and agreed to proceed with the next construction process.

4. Not all concrete test block reports have been issued. According to the principle of separation of inspection and scoring, the acceptance opinions of the acceptance team are agreed. Our station approves this acceptance.

Signature of the representative of the construction unit (with seal):

Signature of the representative of the geological survey unit (with seal):

Signature of the representative of the supervision unit (seal):

Signature of the representative of the construction unit (seal):

Minutes of the Foundation and Foundation Division Project Acceptance Meeting II

Meeting time: October 19, 20**

Meeting location: On-site office

Meeting host: Mei**

Participating units and Personnel:

Construction unit: ****Aquatic Products Processing Company Mei**

Landscape unit: ****Basic Engineering Company Yao**

Design unit: ****** Architectural Design Co., Ltd. Sheng**

Supervision unit: ****** Consulting Co., Ltd. Fang** Liu ** Huang ** Luo **

Construction unit: ****** Engineering Co., Ltd. Cao** Sun**

Meeting topic: Foundation and foundation branch project acceptance

Meeting minutes Person: Cao**

Meeting content:

1. Construction unit:

1. The processing workshop project constructed by our project department was completed on 20** Construction started on June 23, 2019, and the foundation and foundation sub-projects were completed on October 19, 20**. The project department strictly controls quality during the construction process. All raw materials entering the site strictly follow the principle of "inspection before use" and witness sampling according to the specifications. If there are any unqualified products, the site will be cleared immediately and put into use. The mix proportions of concrete and mortar were mixed in strict accordance with the laboratory test report, and the concrete test blocks were retained in accordance with the specifications. Although there were some problems during the construction process or the standards exceeded the specifications, after the supervisor and the owner issued a written or oral rectification notice, our project department immediately made rectifications and passed the re-inspection before proceeding to the next construction process.

2. After inspection, the deviation values ??of the axis and elevation of the processing workshop are within the allowable deviation range of the specification, and the appearance quality meets the design and specification requirements. Our project department will automatically inspect the quality of the foundation and foundation parts of the processing workshop. Rated as qualified.

2. Design unit:

1. From the on-site acceptance inspection results, the dimensional deviations of the concrete in the processing workshop are within the allowable deviation range of the specification, and the appearance quality of concrete pouring and brickwork is good. , some walls need to be rectified.

2. The total size deviation of the axis of the processing workshop is large and within the allowable deviation range of the specification. The construction unit is required to evenly distribute this size to each span when constructing the main project to ensure the appearance quality of concrete and brickwork. good.

3. The backfill soil in the processing workshop should be compacted with water before pouring ground concrete.

4. The overall quality is good, the concrete has no holes, honeycombs, and pitted surfaces, and it meets the design and specification requirements. Our unit has rated the quality of the foundation and foundation engineering of the processing workshop as qualified.

3. Geological survey unit:

1. From on-site observation, the geological conditions of the processing workshop are consistent with the survey report and meet the design requirements

2. Backfilling of the processing workshop The soil should be compacted with water before pouring ground concrete.

3. The overall quality is good, and the foundation bearing capacity complies with the design and specifications. Our unit assessed the quality of the foundation and foundation engineering of the processing workshop as qualified.

IV. Construction unit:

1. From the on-site acceptance inspection results, the dimensional deviation value of the processing workshop is within the allowable deviation range of the specification. The construction unit is requested to be strict in future construction projects. Control the appearance quality of concrete pouring and brick masonry.

2. Due to the age of the concrete, the information is not yet complete. The construction unit is required to complete the information and submit it to the supervisor for review.

3. The backfill soil should be compacted with water before pouring ground concrete.

4. The overall quality is good, the concrete has no holes, honeycombs, and pitted surfaces, and it meets the design and specification requirements. Our unit has rated the quality of the foundation and foundation engineering of the processing workshop as qualified.

5. Supervision unit:

1. Due to the age of the concrete, the information has not been completely compiled for the time being. In order to ensure the normal progress of the construction, our unit agrees with the construction unit’s opinion and carries out the physical work first. For quality acceptance, after the concrete report is issued by the laboratory, the data should be compiled and completed as soon as possible and submitted to the supervision for review.

2. Our project supervision department strictly controls the quality during the construction process. All raw materials are sampled and inspected after entering the site. After obtaining the laboratory test report, they are allowed to be used in the project to avoid unqualified materials. Materials are used in engineering. When the concrete was poured, the supervisors of our project department stood by to supervise the construction unit to strictly follow the laboratory mix ratio, and the concrete test blocks were retained according to the specifications.

3. From the on-site acceptance inspection results, the dimensional deviation values ??of the processing workshop are all within the allowable deviation range of the specification. The appearance quality of the concrete and brick masonry is good, and some walls must be rectified.

4. According to the requirements of the construction unit and the design unit, the backfill soil in the processing workshop should be compacted with water before pouring ground concrete.

5. The overall quality is good, and the concrete, steel bars, and masonry meet the design and specification requirements. Our unit has rated the quality of the foundation and foundation engineering of the processing workshop as qualified.

Countersigning opinions:

Construction unit: **** Aquatic Products Processing Company

Land acquisition unit: **** Basic Engineering Company

Design unit: **** Architectural Design Co., Ltd.

Supervision unit: **** Engineering Consulting Co., Ltd.

Construction unit: **** Engineering Co., Ltd.

 20** month and day

Minutes of the foundation and foundation division project acceptance meeting three

Meeting time: September 5, 20XX

Meeting location: Wuhan Changbo Construction Group Co., Ltd. Hushu Guanzhi Phase II on-site project department office

Participating units:

Construction unit: Wuhan Hongya Holiday Real Estate Co., Ltd.

Participants:

Supervision unit: Hubei Nanfang Supervision Co., Ltd.

Participants:

Design unit: Hubei Zhongjiang Architectural Design Institute Co., Ltd. Company

Participants:

Survey unit: China Machinery Sankan Geotechnical Engineering Co., Ltd.

Participants:

Construction unit: Wuhan Changbo Construction Group Co., Ltd.

Participants

Supervision station: Wuhan Caidian District Construction Engineering Quality Supervision Station

Participants: Gao Zuoqing

Main content:

Constructor Qian Wenwei:

Thanks to the leaders at all levels for participating in the acceptance work of the C8# and C10# foundation division projects. This project is a pile foundation. Upon inspection and acceptance, the basic steel bars, concrete, concrete raw materials and mix proportion design, formwork, and cast-in-place structural sub-projects all meet the requirements of the design and current construction quality acceptance specifications. To meet the structural design safety level, leaders at all levels are invited to make a self-evaluation on the basic acceptance of this project by the general contractor of Wuhan Changbo Construction Group Co., Ltd.

Construction unit Zhou Shenghe:

During the construction process, our unit strictly controls the quality and constructs according to the design and acceptance specifications. The project acceptance procedure is implemented in accordance with the construction management requirements of Hanyang District, Wuhan City. All incoming materials shall be submitted for inspection. All incoming materials must have factory certificates. Only after the supervision engineer has witnessed the sampling, delivery and testing, can the next process of construction be carried out. The construction process and construction quality met the requirements of the design and acceptance specifications. After self-inspection, the project was rated as qualified.

Management of the supervision unit is Qinjian:

Since the construction of the project, the project has always been under control. The construction procedures of the project have been self-inspected by the construction unit and passed the review after being submitted to our company for review. Only then can the next construction process be carried out.

From the time of earth excavation and construction to the present, the quality control data and guarantee data of this project have been strictly implemented in accordance with the current relevant national regulations. Full supervision of each process has been carried out, and acceptance of the project appearance quality, project construction management data, guarantee data, etc. Based on the comprehensive judgment of the situation, the quality of the project is at a qualified level.

Surveying unit:

Agree with the opinions of the supervision unit and agree to the acceptance of the foundation and foundation subdivision projects of Buildings C8# and C10#.

Design unit:

Agree with the opinions of the supervision unit and agree with the acceptance of the foundation and foundation subdivision projects of buildings C8# and C10#.

High Quality Inspection Station Director:

All participating construction units, designers, and surveyors are in place to participate in this acceptance work. The procedures are legal and meet the specification requirements.

Countersignature column:

Construction unit:

(Signature):

Supervision unit:

( Signature and seal):

Design unit:

(Signature and seal):

Surveying unit:

(Signature and seal):

p>

Construction unit:

(Signature and seal):

Arrangement unit:

September 5, 20XX

You may be interested in:

1. Format of project acceptance meeting minutes

2. Example of minutes of project pre-acceptance meeting

3. Excellent example of minutes of completion acceptance meeting

4. 2017 Project Completion Acceptance Meeting Minutes Format Sample

5. Completion Acceptance Project Working Meeting Minutes Sample

6. Acceptance Meeting Minutes

7. Sample minutes of construction project meeting