Joke Collection Website - News headlines - Summary of corporate environmental protection work
Summary of corporate environmental protection work
The unforgettable working life has come to an end. Looking back on the work during this period, the theoretical knowledge and professional level have been greatly improved. I guess we need to write a good work summary. But how to write a work summary to be outstanding? The following is a summary of corporate environmental protection work in 2021 that I collected for you. You are welcome to share it. Summary of corporate environmental protection work 1
1. Company profile
The company was established on September 28, 20**. It is a private enterprise specializing in aluminum smelting and currently has 750 employees. people. The company's 230KA large-scale prebaked aluminum electrolysis project is one of the key construction projects in the province. The xx branch of xx Aluminum and Magnesium Design Institute is responsible for the design work. The designed annual aluminum ingot production capacity is 140,000 tons. After it is put into operation, it can achieve annual sales revenue of 2 billion yuan, profits and taxes 250 million yuan, with a total investment of 850 million yuan, the project was constructed in two phases. The current scale is the first phase of 70,000 tons. It was successfully put into production in two batches on February 28 and July 8, 20**. *108 troughs, with a total investment of 450 million yuan, and an annual electricity consumption of 1 billion KWh. By the end of 20**, the company had produced 93,757.637 tons of aluminum ingots. In the first quarter of this year, it had produced 15,876.362 tons of aluminum ingots.
2. Process characteristics
The company’s SY230 prebaked anode electrolyzer integrates various advanced technologies and achievements at home and abroad, and adopts a fully enclosed automated material conveying system and high-efficiency The energy-efficiency automated monitoring flue gas purification and recovery system adopts an intelligent fuzzy control system to assist in the management of aluminum electrolytic production throughout the entire process, as well as a stable power supply and delivery system with a high degree of electrical automation and more advanced spectral analysis quality monitoring facilities, etc. The process flow is compact , with a high degree of automation, it is in the advanced ranks of the same industry in the country. The entire production process is a clean production process in the electrolytic aluminum industry.
3. Regarding environmental protection
For the electrolytic aluminum industry, environmental compliance is a very important basic condition. Since 2000, in order to implement environmental protection policies, the country has introduced many measures and closed down There are many enterprises that do not meet environmental protection standards. Therefore, it is self-evident that xx Aluminum Industry, which was established in this environment, attaches great importance to environmental protection work. The company leaders conscientiously implement the relevant national industry policies and systems, proceed from long-term interests, and use a development perspective. Looking at the problem, whether it is during the project construction period or the current production period, we must not forget to do a good job in environmental protection and management, and achieve a high starting point and high requirements. Specifically, we must achieve the following points:
1. High-standard design , laying a technical foundation
The environmental impact of electrolytic aluminum enterprise production is mainly on air. Fluoride is the main characteristic pollutant emitted, and the other is dust. In order to meet the standard construction, our company first proposed to the design unit In order to comply with the requirements of national policies and meet the standards for production, after re-screening, a powerful national design unit - xx Branch of xx Aluminum and Magnesium Design Institute was selected, and a group was organized to conduct a selection inspection of more than 20 large and medium-sized aluminum plants across the country. , and finally selected the SY230 series tank;
2. Focus on governance and focus on technical compliance
Since the company was put into production, it has paid great attention to environmental protection compliance and strictly complied with the "Ambient Air Quality Standards" (GB3095-1996), "Urban Area Environmental Noise Standard" (GB3096-93), "Industrial Enterprise Boundary Noise Standard" (GB12348-90), "Surface Water Environmental Quality Standard" (GB3838-20**), "Atmosphere Comprehensive Pollutant Emission Standard (GB13297-1996) and Boiler Atmospheric Pollutant Emission Standard (GB13271-20**) and other national standards shall be supervised and improved to truly achieve external supervision and internal management, and give full play to the electrolysis equipment installed by the company. The potential of flue gas recovery and purification systems, classified management, and strict compliance with standards:
First, increase investment to ensure that environmental protection hardware meets standards. The company's first phase of 70,000 tons has a total investment of 450 million yuan, and the total investment in environmental protection is about 50 million yuan. It has two sets of purification and recovery systems, a fully enclosed material supply system, and the use of bag dust collectors and venturi Based on the principle of dry recovery and purification, all flue gases from electrolytic cells are centrally processed to meet emission standards;
Secondly, classification is required to meet standards and comprehensive treatment is carried out.
The pollution caused by electrolytic aluminum is nothing more than gas, dust, fluorine and slag. In response to the above pollution sources, the company has carried out technical treatment to classify the gas, solid and slag (using the strong adsorption capacity of AL2O3 to carry out dry adsorption and recovery of fluorine). Turn it into beneficial fluorine-containing raw materials for production. The recovered dust AL2O3 and ALF3 and other materials are returned to the silo for use as electrolysis raw materials. The residual carbon residue and other materials are classified and stacked, and are regularly auctioned or returned to the carbon factory for production. raw materials or fuel). Effective substances are retained and utilized, harmless gas emissions are up to standard, and solid materials are repeatedly used or used as raw materials in other industries. They are not only treated but also comprehensively utilized, turning waste into treasure, creating benefits for the enterprise and reducing losses;
< p> Again, ensure 100% operation of environmental protection facilities. Recognizing the importance of environmental protection and realizing that comprehensive management can turn waste into treasure, all the company's environmental protection equipment ensures 100% operation 24 hours a day, laying a scientific foundation for creating a beautiful and clean environment. At the same time, the company has specially set up a purification and recycling workshop, and also established an environmental protection department so that the company's environmental protection atmosphere can be managed, supervised, and implemented, and it can operate smoothly in the long term. In addition, the company also proactively requested county and city environmental protection departments to provide guidance and strengthen monitoring, make timely rectifications and improvements, and ultimately reach industry standards.3. Green the corporate environment and optimize management indicators
In order to further strengthen workers’ environmental awareness, the company organized employees to carry out voluntary greening activities. The company spent more than 500,000 yuan on environmental protection in the factory area. More than 90% of the empty space in the first phase has been greened as planned, and responsibility areas have been divided. Walking into the company gate gives people the feeling of a real garden-style factory. The company is thriving, and all indicators have entered the industry's advanced level: < /p>
①. The quality of HJ brand aluminum ingots for remelting is 100% in line with national standards, and has been declared a provincial famous product;
②. The AC power consumption of electrolytic primary aluminum is less than 14000kwh/t-AL Reaching the domestic advanced level;
③. Fluoride emission concentration is 1.9mg/nm3 (national standard <3mg/nm3=), dust emission concentration is 8mg/nm3 (national standard ≤30mg/nm3), and dust removal efficiency is as high as 99 % or more, these indicators have achieved leading levels in the same industry;
④. Completely closed circulating water is implemented, and there is basically no industrial water discharge;
⑤. The enterprise and surrounding areas have Mutual supervision, mutual management, and environmental protection advantages have truly been achieved.
4. Persevere and create tomorrow’s environmentally friendly enterprise
With the development of enterprises and the progress of society, meeting environmental protection standards has become a common consciousness and requirement. Our company We have also planned future environmental protection development plans. We will summarize past results, learn from external successful experiences, continuously improve the company's environmental image, actively respond to national policies, cooperate with environmental protection departments at all levels to increase efforts, and seek truth from facts to ensure the economic development of the company. At the same time, we must do a good job in environmental management of enterprises and make unremitting efforts to create tomorrow's environmentally friendly enterprises. Summary of corporate environmental protection work 2
We always adhere to the safety production policy of "safety first, prevention first, comprehensive management", and carry out in-depth and solid "three actions" and "hidden hazard investigation and management" to implement The various activities of the "Safety Production Year" are an opportunity to strengthen the basic management of on-site safety while paying close attention to the construction of safety teams, vigorously shaping corporate safety culture, comprehensively improving the safety practical capabilities of managers, comprehensively improving the safety awareness of all employees, and constantly consolidating safety The "three basics" work has achieved good safety results.
In XX, despite the annual overhaul and the successive construction and commissioning of four technical transformation projects, the number of work-related injuries remained the same as in XX, various violations of rules and disciplines remained the same year-on-year, and the safety education and training plan completion rate was 100 %; the completion rate and rectification rate of the hidden danger investigation plan are 100% and 99% respectively (some are not expired or require the entire plant to be shut down for overhaul), the number of deaths from safety production accidents is zero, and there are no major safety production accidents or major environmental pollution throughout the year. There are no major accidents, no major occupational diseases, no major fires and personal casualties, and the emissions of “three wastes” meet national standards. This achievement was achieved thanks to the high attention, strict management and strict inspection by the company's leaders and managers at all levels.
In order to further summarize the achievements, accumulate experience, and improve the level of safety production management, the safety production work in xx is summarized as follows:
1. Improve various rules and regulations and implement institutionalized management.
Put the improvement of various rules and regulations in the first place. This year, our office has enriched and filled in the following rules and regulations: "Production Safety Responsibility System", "Production Safety Acceptance Regulations", "Responsibility System of Various Departments of the Environmental Sanitation Department", "Responsibility System of Contracting Team Managers and Related Regulations", etc., to improve system and turned it into management implementation. For example, after the introduction of the "Responsibility System for Contracting Team Managers", evaluations were conducted based on the quality and work ability of management personnel, and unqualified managers were evaluated during the evaluation. Work is redistributed and the results of the evaluation are used as the standard for salary payment.
As another aspect of sanitation work, there is the issue of charging. After we formulated the job responsibility system for toll collectors, the responsibilities of toll collectors have been clarified, the tasks are clear, rewards and punishments are clear, and the work is more proactive and proactive than before, so that this year's toll collection work can be carried out while reforming and charging at the same time. Complete the task better.
In personnel management work, secretarial staff are engaged in the collection and organization of personnel files of management units, and the workload has been very huge. In recent years, family planning work must also be strictly controlled. Even with a small staff and a heavy workload, they were still able to complete the tasks perfectly, manage the file work and family planning work in an orderly manner, and took time to create a computer charging platform for charging work.
2. Improve the contract responsibility system, promote high-quality services, and implement safe production.
Due to the continuous expansion of production volume in the past few years, a larger proportion of new workers has resulted in a decrease in labor productivity. Therefore, in order to maintain high standards of production quality and service quality, I have tried to lighten the workload to varying degrees in both cleaning and fleet operations, focusing on training workers' production skills. At the beginning of this year, our office further improved the contract responsibility system based on the production capacity of the personnel, so that every employee can be freely combined according to regulations, and some of the poorer employees were dealt with, so that high-quality services can be improved in quality. Ensure that safety production is constantly implemented, production efficiency has been improved, and production costs have also been reduced.
3. The charging reform has achieved initial results, and management work has become standardized.
Regarding the problem of difficult charging, our office has been exploring solutions for several years. We have repeatedly proposed the implementation of one-window charging for water, electricity, and sanitation fees. However, due to various reasons, it has been delayed. It has yet to be implemented. While neighboring counties and cities and some towns and districts in our city have implemented the above plan, our department is still using the backward method of collecting door-to-door fees manually. In order to solve this backward charging method and keep up with the pace of our city's creation of an information-based city, the leadership team of our office made a firm decision and decided to implement the plan of having banks pay the garbage fees in October this year. Through careful division of labor, starting from July, all personnel in our office began to take action according to the division of labor: contact the computer software company to produce a set of charging system software based on the specific charging situation of our office; at the same time, arrange for collectors to visit each house. Sign a "Service Contract" and an "Authorization Letter for Payment of Garbage Collection and Transportation and Sanitation and Cleaning Fees" with residents; for other service targets, start with the store and sign an authorization letter with them. Then enter the signed ** household and ** unit information into the computer program. After several months of hard work, the first bank deduction was officially implemented on October 13th. The deduction results are gratifying. ** households have successfully deducted fees, reaching more than 60%; units (mainly shops) have successfully deducted fees from ** households, reaching 50%.
This first attempt by a bank to pay garbage fees has laid the foundation for our office to gradually standardize management and automate and scientificize the office system. This set of charging software has created a computer charging platform that can be operated and queried on multiple computers at the same time, changing the backward manual door-to-door charging method, ensuring the safety of charging work, and expanding the storage of data for future urban development. The road was paved.
4. There are problems.
While the reform work is progressing smoothly, we are also facing certain problems, especially the difficulty of charging fees and garbage disposal.
Since this is the first time for banks to pay garbage fees, there are certainly many problems. For example, there is an error between the name of the household entered into the computer and the name on the bank customer's passbook; some households failed to show up at the bank on time. The amount in the passbook was sufficient; some residents had errors in their account numbers, etc. These problems all caused the deduction to fail. Faced with this series of problems, our staff did not back down. After the office staff carefully checked the problem and the collection staff patiently explained it to the residents, the problem was gradually solved. However, a considerable number of the more than 10,000 households counted in our premises are unwilling to sign the "Service Contract" and the "Authorization Letter for Payment of Garbage Collection and Transportation and Sanitation and Cleaning Fees"; some shops have their own stability and long-term It’s hard to guarantee sex, and I’m not willing to sign it. This has caused certain obstacles to the standardization of our charging work. In addition, our office can only collect cash from residents of rental houses. These issues still need to be further resolved.
On the other hand, after several years of continuous efforts, our city’s urban areas have found a way to collect and process garbage through continuous exploration, but it still needs to be continuously improved. The garbage collection and treatment in our office is gradually moving towards formalized management. However, the temporary landfill established in Heshun Shitang is nearly full due to the large amount of dumping. This undoubtedly raises another serious problem for our waste outlet. Judging from the current garbage disposal volume and other conditions, if we still cannot find a suitable location as a garbage disposal site by next year, it will greatly affect the solution to the problem of the outlet of the garbage transported by our office. This is a major problem that needs to be solved urgently.
Our city’s environmental sanitation work, under the correct guidance of leaders at all levels and with the unremitting efforts of the majority of sanitation workers, has indeed achieved gratifying results. But looking to the future, as Nanhai City's economy continues to develop and the pace of urban construction further accelerates, the city's environmental sanitation becomes more important, and the tasks facing our office become more arduous. All employees of our office will continue to work together, invigorate their spirits, maximize their strengths and avoid weaknesses, and make due contributions to the construction of Nanhai City; at the same time, they will overcome difficulties, deepen reforms, and continuously create new situations in the environmental sanitation industry. Summary of corporate environmental protection work 3
In accordance with the spirit of the provincial and municipal environmental protection conferences and the special rectification work conference on environmental pollution of northern Shaanxi oil development enterprises, in order to further improve the environmental quality of our county’s oil areas and promote the health and orderliness of oil exploration enterprises develop. Our county adheres to the work idea of ??taking publicity and education as the guide and focusing on the construction of clean and civilized well sites in the oil area, strengthening environmental protection infrastructure and ecological environment construction, increasing law enforcement supervision and inspection, strictly controlling environmental protection approvals, and comprehensively carrying out the work of Environmental pollution control has significantly improved the environmental quality of oil areas. The report on the special rectification work of environmental pollution in our county's oil area is as follows:
1. Strengthen leadership, consolidate responsibilities, and ensure that the special rectification work achieves effective results
In order to ensure the environmental protection of oil development enterprises in northern Shaanxi The special pollution rectification work has achieved remarkable results. According to the Municipal Environmental Protection Bureau's "Implementation Plan for the Special Remediation Action of Environmental Pollution by Petroleum Development Enterprises", we immediately held a special meeting, combined with the actual situation of our county, made specific arrangements and deployment, and formulated the "County Petroleum Development Enterprises Implementation Plan" District Environmental Pollution Special Remediation Work Implementation Plan", established Director Zhao Wenjiang as the team leader, Deputy Director Wang Yajun, Environmental Supervision Brigade Captain Comrade Zhang Xinyuan as deputy team leaders, instructor Ma Xiaochun, Deputy Brigade Captain Guo Xianghong, and Law Enforcement Squadron Leader Bai Shichang , Wang Dong is a member of the special rectification leading group, clarify tasks, consolidate responsibilities, and ensure that the special rectification work achieves remarkable results.
2. Strengthen the publicity of environmental protection laws and regulations and enhance the national environmental awareness
Focusing on the special rectification actions for environmental pollution by oil development enterprises, we went deep into the oil areas to print and distribute the "Environmental Protection Law", "Shaanxi Provincial Coal There are more than 30,000 promotional materials on relevant laws and regulations such as "Oil and Natural Gas Development Environmental Protection Regulations", which requires each well site to write more than 2 permanent environmental protection slogans, and more than 3,600 permanent slogans have been written. We also used municipal and county cable TV stations to regularly report environmental news and produced a special film on special environmental rectification work in oil areas; insisted on preparing and issuing a special rectification work briefing every week, and promptly reported the lack of understanding and importance of special actions to control pollution in oil areas. For enterprises with a low level of environmental protection, the environmental awareness and legal concepts of corporate legal persons have been generally enhanced, creating a good public opinion atmosphere for comprehensively carrying out environmental pollution control work in oil areas.
3. Intensify the comprehensive improvement of the oil area environment and comprehensively improve the environmental quality of the oil area
1. Strictly control the source of pollution. We strictly implement the "Environmental Impact Assessment Law" and the first environmental protection approval system for newly deployed oil wells, and completely eliminate the deployment of oil wells along rivers, roadsides, fields and water source protection areas; for newly exploited oil wells, we strictly implement the "three Under the "Three Simultaneities" system, any environmental protection facilities that fail to meet the requirements will not be allowed to start drilling and put into production; oil development companies that do not implement the "Three Simultaneities" system and do not build in accordance with the standards for clean and civilized well site construction will no longer be given New batch of oil wells. We have investigated and punished 7 cases of illegal activities involving construction before approval and construction while approval, and 7 companies were shut down. Up to now, the environmental impact assessment rate and implementation rate of the “Three Simultaneities” system of all oil development enterprises have reached 100%.
2. Comprehensively carry out the construction of clean and civilized well sites in oil areas. This year, we will still take the approach of leaders covering areas, squadrons covering sites, and cadres staying on site to comprehensively promote the construction of clean and civilized well sites. At present, our county has 1,970 well sites and 4,299 oil wells. 1,868 clean and civilized well sites and 4,052 oil wells have been built, with a completion rate of 94%. Among them, the "three sides" well sites have all been built into clean and civilized well sites. (The No. 1 Oil Production Plant of Changqing Oilfield has 517 well sites and 1,073 oil production wells. 481 clean and civilized well sites have been built, with a completion rate of 93%; the No. 4 Oil Production Plant of Changqing Oil Field has *** well sites. 99, with 235 oil production wells, and 86 clean and civilized well sites have been built, with a completion rate of 87%; Changqing Oilfield Pingbei Management Department has 112 well sites, and 510 clean and civilized well sites have been built. 102, with a completion rate of 91%; Changqing Oilfield’s Fifth Oil Production Plant, the Second Kamxi Project Team*** has 7 well sites and 24 oil production wells, and has built 7 clean and civilized well sites, with a completion rate of 100% ; Shaanxi Changle Petrochemical Co., Ltd.'s Liandao Bay project team has 30 well sites and 137 oil production wells. 30 clean and civilized well sites have been built, with a completion rate of 100%; Yanchang Oilfield Xingzichuan Oil Production Plant has 30 wells. There are 1,205 oilfields, 2,320 oil production wells, and 1,162 clean and civilized well sites have been built, with a completion rate of 96%)
3. Strengthen the construction of sewage treatment facilities. The annual sewage production of the county's oil development enterprises is 1.456 million tons, and the sewage reinjection volume is 1.136 million tons, with a reinjection rate of 78% (including: the annual sewage production of Changqing Oilfield Development Enterprise is 856,000 tons, and the reinjection rate is 856,000 tons, The reinjection rate reaches 100%; the Xingzichuan Oil Production Plant of Yanchang Oilfield Co., Ltd. produces 600,000 tons of sewage annually and reinjects 280,000 tons, with a reinjection rate of 47%). There are 16 sewage reinjection stations and 270 sewage reinjection wells in the county. Xingzichuan Oil Production Plant plans to invest 250 million yuan to build six joint stations. One has been completed and the rest are under construction.
4. Increase the supervision of oil pipelines. Our county has 254.51 kilometers of oil pipelines, including: Changqing Oilfield Development Company has 219.51 kilometers of oil pipelines; Xingzichuan Oil Production Plant has 35 kilometers of oil pipelines. In 20xx, more than 6 million yuan was invested to build a 13-kilometer oil pipeline from Bathing to Dongying All lines have been debugged now. We have dispatched more than 200 manpower (times) and inspected more than 300 kilometers of oil pipelines in total.
5. Strengthen environmental greening and hardening construction in oil areas. In April, the County Environmental Protection Bureau formulated and issued an implementation plan for oil area greening work, organized manpower to increase supervision and inspection, and urged all oil exploration companies to use one month to carry out comprehensive greening inside and outside the well site, slope protection and both sides of the road. Up to now, various oil exploration companies have invested a total of 43 million yuan, with a green area of ??1,017 acres and 509 kilometers of hardened roads.
6. It is the comprehensive implementation of mud waste liquid brick making technology. In order to achieve the goal of achieving a 100% harmless treatment rate of drilling mud waste liquid, our county. Brick-making technology from drilling mud waste liquid was introduced and piloted in Jianghan Oilfield. On-site meetings were held and comprehensive promotion was carried out, achieving the goal of 100% harmlessness of drilling mud waste liquid.
7. Strengthen law enforcement and inspections in oil areas. We have adopted the measures of one law, two suspensions and three rectifications to further strengthen law enforcement and strictly investigate and deal with the random discharge of sewage and the indiscriminate dumping of sewage into sewage ponds. and other illegal activities, focusing on the supervision and management of the recycling and utilization of landed crude oil in oil areas, making the additional utilization rate of landed crude oil reach 54%.
This year, more than 2,800 manpower personnel were dispatched, 3,000 well sites were inspected, 13 violations of various types were investigated and punished, and a fine of 410,000 yuan was imposed. Especially regarding the pollution accident in the Xingzichuan Wangjiawan operating area, 68 oil wells were shut down and rectifications were carried out within a time limit.
In short, when our county carries out special rectification activities for environmental pollution by oil development enterprises in the province and city, we clarify responsibilities, pay close attention to implementation, further increase law enforcement supervision and inspection, strengthen comprehensive environmental management in oil areas, and effectively solve The outstanding problems that actually exist have significantly improved the environmental quality of the oil areas in our county. In the future, we will continue to strengthen the construction of environmental protection infrastructure and ecological environment, increase investment in environmental pollution control, increase law enforcement supervision and inspection, strictly control the first approval of environmental protection, and ensure that the environmental improvement work in our county's oil areas reaches a new level.
- Related articles
- A collection of 70 loving slogans that call on everyone to protect the environment by starting from small things.
- Basketball entrance slogan
- Keep the slogan
- Model post target responsibility book
- Civilized slogan in the bathroom
- Tips for Mid-Autumn Festival and National Day
- Safety emergency drill slogans
- How to draw a marker in an unmarked sketch book?
- Slogan of risk notice of agency litigation
- How many pieces can the Fantasy Westward Journey Dragon and Phoenix store sell in a day?