Joke Collection Website - News headlines - Summary of personal work in landscape engineering

Summary of personal work in landscape engineering

202 1 summary of personal work in landscape engineering

Time flies, and a period of work activities has come to an end. Looking back on our work during this period, we also found the shortcomings and problems in our work. At this time, how can the most critical work summary fall! In order to make it easier and more convenient for you to write your work summary, the following is my personal work summary of 202 1 landscape engineering, which I carefully arranged, hoping to help you.

Personal work summary of landscape engineering 1 I have been working as a landscape engineer for XX project since I joined the company in February of 20xx. During this period, I carefully studied the company's various rules and regulations, employee manuals and so on. And strictly abide by it. In my daily work, I am serious and pragmatic, and actively study various specifications, atlas and acceptance standards. , so as to be familiar with the site and drawings; Insist on on-site supervision and inspection of every link in the construction process, and actively expand relevant professional knowledge in spare time, and strive to improve their abilities in all aspects. With the care, guidance and help of company leaders and colleagues, all tasks were basically successfully completed. My abilities in all aspects have been improved to a certain extent, which also laid a good foundation for future work.

Looking back on my first year, I have paid a lot and gained a lot. I obviously feel that I am growing, mature, and have a good impression, but I also have shortcomings and deficiencies in improper handling, but I have gained more thinking. This year's work is summarized as follows:

I. Main Work Completed and Achievements Made in 20xx

Engineer of Party A for outdoor landscape engineering of XX project under construction.

According to the arrangement of the company, he is the engineer of Party A for outdoor landscape engineering of XX project under construction. That is, on behalf of XXX real estate company, it manages and supervises the outdoor soft scenery part of the company's construction projects.

The main work completed includes:

1-1,be familiar with the scheme diagram, review the soft site construction drawings, and put forward reasonable suggestions.

1-2, count the soft scene engineering workload of each project, check the size, quantity and planting area of seedlings, summarize the seedling mobilization plan and report it to the seedling purchasing department of the group company in time.

1-3, review the progress plan and construction scheme of the construction unit, and make good preparations for construction.

1-4. Supervise the construction unit to strictly abide by the contract, carry out the construction according to the specifications and standards, and timely handle and report the problems existing in the construction.

1-5. According to the requirements of construction specifications, the planting soil on the site shall be accepted and sampled for re-inspection.

1-6, according to the drawings and design specifications, accept seedlings.

1-7, control the progress and quality of soft site engineering, and check the safe and civilized construction work.

1-8, requiring the construction unit to formulate a reasonable maintenance management plan and supervise its implementation.

1-9. Carefully review the project visa.

1-10, sort out the problems existing in the construction, and form weekly and monthly soft field engineering inspection reports.

1-11,sorting out contract documents and various materials.

1-12. Coordinate the relationship between relevant units and relevant cooperation departments.

Second, the problems and shortcomings in the work and the direction of future efforts

There are still many shortcomings and deficiencies in the work, and many aspects need to be learned, and the help, guidance and support of company leaders and colleagues are needed, which are embodied in the following aspects:

1. The initiative and pre-control ability in the work need to be improved: the main performance is that the control ability before the soft scene construction drawing is determined is not strong.

There is a lot of overlap between landscape engineering and related professional construction sites, and sometimes designers of various professions in the design department do not communicate in time, which leads to many problems in the construction process of landscape engineering construction drawings, such as:

(1) There is an unreasonable situation that pipelines of various professions are buried under the working surface of garden construction (some pipelines are buried directly under the large seedlings planted in greening). When found, only the planting position of large-scale seedlings can be adjusted, which affects the rationality of plant configuration and makes the final landscape effect fail to meet the design requirements.

(2) Due to the change of the design elevation of related majors, the garden has not been adjusted accordingly, and the problems were only found in this part of the construction. Finally, only a small range of design changes and adjustments can be made, which leads to the imperfect connection of garden construction operation surface and affects the landscape effect.

(3) The configuration design of landscaping seedlings does not consider the growth characteristics of plants;

A, sun plants and shade plants are designed and planted in unreasonable positions, which affects the normal growth of plants;

B, some plants with thorns are designed and planted too close to the garden road, rest platform and other places that pedestrians can touch, which is easy to hurt pedestrians, especially children;

C. In the design of shrub configuration, the relatively fast-growing shrub planting area is directly connected with the lawn, and the height difference is too large, which makes the on-site plant configuration appear chaotic. These are common problems in soft scene construction this year. If I carefully check the soft scene construction drawing in my work and put forward the treatment plan for unreasonable and contradictory design problems in time, I can improve the soft scene professional construction drawing in advance and form excellent landscape effect. In the future work, we should further improve the learning ability of all aspects to avoid similar phenomena from happening again.

2. The ability of project quality management, schedule management and safety management needs to be further improved.

In terms of quality management, in order to ensure the construction quality and effect of greening projects, materials should be strictly controlled. Strict acceptance, all seedlings in the field must meet the design requirements before they can be planted in the field. For the selected seedlings, if the appearance is affected by broken branches during transportation, they are not allowed to be planted in the field, and all the seedlings that do not meet the specifications will be repelled. Before greening planting construction, the earthwork backfilled on site must meet the requirements of planting specifications, and the unqualified parts shall be removed. In strict accordance with the design and specification requirements, the planting soil is sorted and leveled, and the slope surface is modeled. Green planting construction also has its particularity. If it is constructed in full accordance with the design drawings, the final landscape effect may not be ideal. Therefore, it is necessary to consult the design and construction drawings, communicate with professional designers in advance, and on the premise of ensuring the final landscape effect, according to the growth characteristics of plants, as well as the layout and topography of the buildings on site, make on-site deployment of some seedling planting positions. In order to ensure the planting effect, before planting trees and key node plants, the ornamental surfaces should be selected according to their tree shapes.

In the aspect of schedule management, actively urge the construction unit to "grab" the working face for construction, communicate with the relevant professional engineers of the department in time on the relevant issues that need to be coordinated on site to ensure the construction progress of landscape engineering, and at the same time require the construction unit to actively organize labor and construction materials to enter the site according to the on-site construction situation; In engineering construction, communicate with professional designers in time for the engineering construction parts that need to be clearly designed, notify the construction unit to carry out on-site construction according to the design intent after confirmation, and report the documents according to normal procedures to ensure the orderly construction of the project.

In terms of safe and civilized construction management, every construction worker who enters the site must wear a safety helmet as required, and do a good job in the safety protection of on-site construction, eliminate all possible safety hazards, and achieve clean and civilized construction after work.

3, should take the initiative to put forward suggestions for drawing optimization according to the actual situation.

In the scheme design, designers often design super-large tree species as the focus of the landscape, but this often fails to achieve the expected effect of designers. Due to the poor regeneration ability during the planting process, extra-large trees will even shrink after planting, and the landscape effect is not good; Sometimes, in order to improve the survival rate, strong pruning will inevitably destroy the original posture of the trees themselves, and the posture after planting is not satisfactory. Once acclimatization and mismanagement lead to the death of trees, precious natural resources will be wasted. If this happens, we will suggest that the designer should choose a middle-aged robust tree with DBH of 1.5-20 cm. This kind of trees are in the vigorous growth period, which not only has little impact on their harm, but also the trees themselves recover quickly and survive easily, so this phenomenon will not occur.

Sometimes designers ignore the biological characteristics and ecological habits of plants because they pursue the formal beauty of the landscape too much. Formal beauty and ecological beauty are not well combined, such as planting trees that like light but are not cold-resistant on the north side of the building; Plants that are not hardy are planted in ventilated places between buildings. Under this site condition, plants are not growing well and can't bloom and make scenery. Sometimes only the recent results are considered in the collocation of plant species, such as the architectural foundation planting. Plant species planted near the corner grow slower than those planted at the outer edge. After a year or two, the outer edge covered the one near the corner, and the original layered design concept could not be realized.

The above problems should be communicated with designers in time and suggestions for drawing optimization should be put forward.

Three. 20xx work plan and key work arrangement

1, cooperate with the project engineering department to complete the landscape greening planting work in XX community.

Familiar with the designer's scheme, understand the design intention, carefully check the construction drawings, carefully organize the construction, and try to improve the landscape effect. Pay attention to details in the work, be good at detailed construction, and strive to improve the quality of the project. Supervise the construction unit to strictly abide by the contract, carry out the construction according to the drawings, specifications and standards, and deal with the problems existing in the construction in time. Actively coordinate the relationship between the company's relevant units and relevant cooperation departments, and strive to complete 90% of the tree planting work in XX community before the end of April of 20xx.

2. Study hard, work diligently, and actively complete other tasks assigned by company leaders.

After the baptism of time and work training, my working ability has been improved to a certain extent, and I have also clearly realized my shortcomings and deficiencies. In the future work, I will be strict with myself, take this employee as my own responsibility, actively respond to the company leaders and work closely with my colleagues.

Summary of personal work in landscape engineering 2 I graduated from Xunyang Teachers College in 20XX, joined the work in March 1984, worked as a landscape technician in Chengdu Huisen Garden Co., Ltd. in March 20XX, and worked as a landscape project leader in Chengdu Huisen Garden Co., Ltd. since 20XX. I have been engaged in engineering and technical work for many years and have the qualification of a second-level project manager in landscaping. Because of my continuous efforts and hard study at work, my professional skills have made great progress and accumulated rich experience in landscaping construction and project management. These have greatly improved my professional level.

While doing my job well, I also try to save my strength and learn new norms and technologies. 20XX 1 1 participated in the safety production knowledge training of Chengdu Hilanberg Architectural Training School, and achieved good results. I successfully obtained the qualification certificate of project manager's knowledge of safety production, established my safety awareness in the construction process in the future, and made clear the importance of civilized construction. After work, I constantly improved and enriched myself through books, internet and other forms, mastered a lot of professional basic theories and knowledge, greatly improved my academic level, and raised my practical experience at work to the theoretical level. This attitude of continuous learning has benefited me for life.

During my tenure as the person in charge of landscape engineering in Chengdu Huisen Garden Co., Ltd., I presided over and participated in many landscape greening and landscape engineering projects, and achieved good economic and social benefits, and won many professional and technical awards and honorary titles. Details are summarized as follows:

I presided over the project that participated in and won an important award: the street greening project of Xiahe Street in Pengxi County.

I participated in and achieved good economic and social benefits, and the projects with excellent quality evaluation results mainly include: Tianfu Avenue node landscape project.

In practical work, I not only pay attention to applying the theoretical knowledge I have learned to work practice, but also refine and systematically summarize the experience gained in my work in time, thus upgrading perceptual knowledge to rational knowledge.

I have been engaged in the professional and technical work of landscape architecture 15 years, with good professional ethics and professionalism. I have a good performance during my tenure, and I have certain comprehensive, analysis, judgment, summary and organization and coordination abilities, and I have a strong ability to organize and implement professional and technical work. I can independently solve more complicated technical problems and write technical, engineering and business reports. Therefore, I think that I have all the requirements and abilities that a landscape engineer should have, and meet the conditions for exceptional reporting, and I hereby apply. In the future work, I will continue to strengthen my study, work hard and live up to my mission!

Summary of personal work in landscape engineering 3 i. Achievements and shortcomings

I have been working as a landscape engineer in the company's project department since I joined the company in XX. During this period, I carefully studied the company's various rules and regulations and strictly observed them. In the process of work, carefully supervise and inspect every link of the construction site, and make progress in learning various specifications and atlas standards. In my spare time, I further consolidated my familiarity with professional knowledge through self-study. At present, he has obtained the qualification of first-class architect examination, and will obtain the title of intermediate engineer of landscape architecture at the end of the year.

In the process of construction site management, as a professional landscape engineer, I actively communicate with other professional engineers and engineers in design department and audit department, try my best to solve the problems in construction as quickly as possible, and take effective pre-control measures for possible problems in advance. The main tasks completed in the past year are as follows:

1, responsible for the supervision and management of 1 outdoor landscaping works. Landscaping is related to the overall impression of the community, and every detail should be strictly controlled, and progress should be required on the premise of ensuring quality. At present, it has been completed and accepted.

2. Assist Yang Gong and Huang Gong to be responsible for the supervision and management of the second-phase civil engineering. At present, 47 A units have been successfully capped, and the rest are in the structural construction period. Strictly check the specifications and binding conditions of reinforcement, formwork support and external scaffolding protection, and urge the construction unit to do all kinds of border protection.

3. Contact GRC manufacturers in time to track the production and installation of GRC in villas; Responsible for the supervision and management of villa civil construction. At present, the first and second rows of villas in the first construction section of Lianjiang have been demolished, the third row is being demolished and the fourth row will be demolished at the end of this month. The villas in the construction section of Shunhua Company have all been demolished, which provides working conditions for the timely construction of the external environment.

4. Be responsible for the landscaping project of the second-phase flood discharge channel. At present, the corresponding engineering quantity has been successfully completed according to the scheduled schedule, which provides a good external environmental guarantee for the smooth pre-sale of the second phase.

5. In one year's construction management, although necessary achievements have been made, there are still many problems. In the process of strictly grasping quality and progress, safety and civilized construction are neglected. Abnormal is to change management thinking, do a good job of pre-control, and eliminate problems in the bud.

Second, career planning and suggestions

In the future work, I will respond to the leadership of the company, work closely with my colleagues, make timely adjustments in view of the problems and setbacks in the project, and constantly learn from them. Strengthen the study of professional knowledge and skills in your spare time,

Improve your working ability, be an excellent landscape engineer, strive to expand in other majors and contribute to the development of Shandong.

Three. Proposals and opinions

In view of the present situation of the company, we make the following suggestions:

1. Strengthen the company's process construction, streamline unnecessary links, and form reasonable and effective program documents. For example, the process of site design change and visa processing is refined into a concise flow chart and distributed to various project departments for easy operation.

2. Put the main responsibility of after-sales service and maintenance on the property management company. The engineer of the project department is only responsible for the on-site responsibility identification of quality complaints. After the responsibility is determined, the property management company will contact the construction unit for maintenance and related work. This can reduce the docking of after-sales service and facilitate the timely handling of maintenance work.

3. Organizing outward bound training can enhance employees' sense of unity and cooperation, and also enhance individuals' self-challenge ability.

4. Order municipal periodicals and magazines such as architecture, real estate and gardens for the on-site project department.

Summary of personal work in landscape engineering 4 20xx years is a year of special significance for a newcomer who has just set foot on his post. Being in a new environment, facing all kinds of strangers around me, there are also various challenges waiting for me. Fortunately, my department is a very United, warm and harmonious department. With the ardent care of the leaders and the enthusiastic help of my colleagues, I quickly eliminated the strangeness around me, better integrated into this excellent group, and kept learning and growing. The situation since the work is summarized as follows:

First, review the past and sum up experience.

In these five months, I insisted on being strict with myself, learning on the spot with an open mind, and taking every problem in my work seriously. When I first arrived at the scene, my professional knowledge could not be fully combined with reality, and I also encountered problems that I could never understand in my work. But I remind myself to strive to improve and actively accumulate on-site experience, at the same time, accept the criticism and suggestions of leaders and colleagues with an open mind, try to correct my own shortcomings, constantly enrich myself, improve myself, and be responsible for my work and myself. During this period, I experienced several things, which made me realize some truth.

1, we should have a serious and meticulous working attitude. In the cost control work in September, I was responsible for counting the green area, hard view area, building area and courtyard area of the southern district in blocks. Due to the large amount of data, some mistakes appeared in the process of making excel tables, and some detours were taken in the future work, which was also criticized by the leaders. Through this incident, I realized the importance of a serious and meticulous work attitude. Only in this way can I do my job well. With this experience and lesson, I have always put seriousness and Excellence first in my future work. I am responsible for the statistics of maintenance data during the handover of 5438+065438+ 10. In the process of data input, each item was checked and checked at the end of the afternoon work. After three days of hard work, the handover work was successfully completed and the maintenance data was counted. In the later maintenance, the data is more accurate and there are no errors. Through these two things, I am more determined to maintain a serious and meticulous work attitude.

2. Make a plan and prioritize your work. In the stage of the project catching up with the construction period, due to the lack of planning, the purpose of work is not clear enough, and the contradiction between primary and secondary is unclear, which often achieves twice the result with half the effort. Colleagues are dissatisfied or full of grievances. In my future work, I will make a work plan carefully, strengthen my understanding of the purpose, distinguish between primary and secondary contradictions, and strive to get twice the result with half the effort. When there is a lot of work, we should not only prioritize, but also do everything carefully, and we should not ignore quality because of speed.

3. Strengthen communication and make full use of resources. In the process of site management, it is necessary to strengthen communication with the construction unit, so as to better realize site management. As the saying goes, "Three people must have a teacher". In the future work, I will actively strengthen communication with other colleagues and realize resource sharing through the company's platform, so as to improve my business level.

4. The style of doing things is rigorous. In the recent handover work, due to the lack of communication with colleagues and leaders in advance, the handover materials were not handled strictly, and many problems appeared, which led to some detours in the later processing.

5. Have solid and rich professional knowledge. Landscape architecture is a comprehensive discipline, which integrates literature, philosophy, aesthetics, painting, drama, calligraphy, sculpture, architecture and gardening. All these require its professionals to have high comprehensive quality and extensive knowledge. In modern times, the infiltration of psychology, sociology and ergonomics in landscape architecture planning and design began to play an important role. As a gardener, we should pay attention to accumulation, especially literature, aesthetics and botany. Pay attention to observation in daily life, and you can find some details and humanized design. This is very important in modern gardens.

Second, look to the future and be fully prepared.

In the new year, it is a challenge for us to carry out greening projects in the eastern part of Shanxi. In order to better complete the construction of the eastern region, we should make preparations now.

1, familiar with the scene. Go to the site every day to get familiar with the building location, road direction, site topography, courtyard location, planting pool location, sunshine exposure time and scope, etc. In order to better guide the subsequent factory configuration work.

2. Learn from existing resources. Pay attention to the collection of information during work and study and accumulate in spare time. You can learn useful knowledge through a project.

3. Go out to study and inspect. Explore some styles and expression techniques of classical gardens, refer to the expression techniques and material types of modern gardens, and explore some new plant collocation methods and "new Chinese" elements in combination with the actual situation. After that, I will go to other more mature "new Chinese" real estate or cultural markets to study and inspect, and learn from others' more mature techniques and styles. This is also a little insight from my work. After a period of accumulation, I will go out to study, learn from China classical gardens and existing mature buildings, summarize and deepen them, and form my own unique aesthetics and techniques. This can be improved repeatedly.

4. Scientifically understand the internal structure and connection of the garden and deal with it with changeable and mature methods. The internal structure of the garden includes topography, plants, hard roads, squares, sculptures, sketches and artificial facilities. Among them, the terrain is the foundation, and all garden landscapes are built on the terrain. Terrain should not only have the vertical relationship of ups and downs, but also have the plane relationship of front and back. The transition between them should be reasonable and natural, and the treatment methods should be rich and varied.

Plants are the skeleton and soul of landscape groups, and the rationality of plant configuration is directly related to the quality of landscape effects. Plants are also the most important, expressive and energetic elements. Because there are many kinds of plants, their forms are changeable and their ecological habits are different, we need to sum up, accumulate and explore more. In order to find a variety suitable for planting location and with good ornamental effect. In the field planting, we should also pay attention to whether the ecological habits of plants are consistent with the local climate, adopt more native tree species, dare to use exotic varieties, and adopt changeable and reasonable methods to make wonderful plant configuration cases.

In the new year, opportunities and challenges coexist. I will correct my attitude, pay attention to accumulated learning, strengthen communication, make detailed plans, work hard and meet new challenges.

;