Model transport agreement with drivers
Transport agreement with driver 1
Party A (Employer): (hereinafter referred to as Party A)
Party B (Contractor): (hereinafter referred to as Party B) Telephone.
In order to meet the needs of concrete production, transportation and pouring in the mixing station of TJ9 section of Jiangxi-Xigu Expressway, Party A and Party B have reached the following concrete transportation contract agreement on the basis of equal consultation, and both parties shall abide by it.
I. Scope of transportation and performance time
1. Party B uses its own concrete tanker to transport the concrete to all the working faces of TJ9 branch bid section of Jiangxi-Xigu Expressway designated by Party A. ..
2. The performance time of this contract: it is estimated to be two years, from April 20th to April 20th. If the contract term signed by the owner, the construction unit and Party A is adjusted, Party A and Party B will adjust the performance period of this contract accordingly.
Second, pricing and settlement methods
1. Fixed transportation unit price: within the bidding operation area, the freight is 250 yuan per cubic meter (the price includes tax).
2. Transportation measurement: the number of bills issued by Party A's mixing station and signed by the consignee at the designated place shall prevail.
3. Settlement payment method (mainly bank transfer):
① During the period from the signing of this contract to the first payment of freight, Party A and Party B have no advance payment and deposit; (2) Party A and Party B shall reconcile the monthly transportation expenses before 30th of each natural month, and Party A shall pay Party B the corresponding transportation expenses of that month in proportion within 5 days after reconciliation;
(3) Within 6 months from the actual transportation operation date of Party B's tank car, Party A shall actually pay the freight of the current month according to the proportion of 50% of the total reconciliation amount of the current month, and the remaining 50% of the freight shall be automatically converted into the performance bond; From the actual transportation operation date of Party B's tanker to the end of this contract, Party A shall pay 95% of the freight of the current month, and 5% of the remaining freight shall be the performance bond;
(4) Party A shall pay 95% of the performance bond to Party B within 30 days after the performance of this contract, and the remaining 5% of the performance bond will be automatically converted into quality bond; Party A shall settle accounts with Party B within 3 days from the date when the owner and the construction party actually pay all the project funds.
3. Party B guarantees to provide two canned transport vehicles with the model of 8- 12m for transportation operation, and submit legal operation procedures (including valid driving license, road transport permit, secondary maintenance, vehicle and vessel tax, etc.). ), necessary vehicle insurance information (effective compulsory insurance policy and commercial insurance policy) and legal driver information (driver's license and qualification certificate, etc.). ) to Party A for future reference.
Party B shall ensure that the drivers of on-site vehicles and rented vehicles have 28 working days per month (2 days for vehicle maintenance per month), and 20 hours per working day can carry out transportation operations at any time according to the arrangement of personnel designated by Party A, so as to ensure the smooth operation of concrete pouring. Otherwise, Party A has the right to deduct relevant freight and unilaterally terminate this contract agreement in advance.
There is no labor relationship between Party A and Party B and all personnel employed by Party B; Party A shall provide accommodation and parking spaces for Party B's necessary employees free of charge, but Party A shall not undertake the safety obligations of all Party B's personnel and vehicles.
4. After Party A's mixing station has measured the concrete and delivered it to Party B, Party B shall be responsible for choosing a safe route and transporting the concrete quantity to the designated operation site for receiving and using as soon as possible.
If the concrete is wasted or lost due to Party B's vehicle failure, accident, illegal operation and other reasons, Party B shall bear all the expenses caused to Party A. ..
5. All expenses incurred by Party B due to the performance of this Agreement (including but not limited to: oil cost, maintenance fee, maintenance fee, driver's salary, personnel insurance, living expenses, safety accident liability fee, illegal fines and taxes, etc.). ) shall be borne by Party B. ..
6. Drivers employed by Party B must strictly abide by traffic laws and relevant vehicle safety rules and regulations, and take up their posts with valid B-class driver's license and truck driver's license. Party B shall bear the social insurance, industrial injury insurance benefits, traffic safety responsibility and all other safety responsibility expenses of its own employees during the performance of this agreement, and Party A shall not bear any responsibility expenses and joint liability.
Traffic and safety accidents shall be handled and solved by Party B itself, and Party A will not cooperate.
If Party B has a major safety accident, this agreement will be automatically dissolved and its performance will be terminated.
Seven. Disputes arising from the performance of this Agreement shall be settled by both parties through friendly negotiation. If negotiation fails, both parties shall bring a lawsuit to the People's Court of Naxi District, Luzhou City.
Eight, this contract is in quadruplicate, Party A holds two copies, Party B holds one copy, and the project department keeps one copy; This contract shall come into effect immediately after Party B's vehicles enter the site.
Party A:
Party B:
(signature and seal):
(Signature) ID number:
Date, year and month
Transport agreement with driver 2
Both parties to the contract:
_ _ _ _ _ (hereinafter referred to as Party A) entrusts _ _ _ _ _ _ _ _ _ _ Company in accordance with the provisions of the Contract Law and the Regulations on the Administration of Maritime Transportation.
Through negotiation, this contract is hereby concluded for both parties to abide by.
Article 1 Mode of transportation
Party B shall, at the request of Party A, dispatch a ship of _ _ tonnage (ship _ _ cargo winch) to transport it from _ _ port to _ _ port, and handle it in accordance with the current charter transportation regulations.
Article 2 Concentration of goods
Party A shall pick up the goods at _ _ port within _ _ days according to the time specified by Party B, and after picking up the goods, Party B shall send a ship for shipment within five days.
Article 3 Time of shipment
After contacting the port of arrival and agreeing to arrange unloading, Party A will prepare to pick up the goods after confirmation by Party B (the opening date will be specified by Party B). Loading time: the goods should be loaded within _ _ hours after the ship arrives in Hong Kong and stops at the dock.
Article 4 Time limit for delivery
The ship will ship the goods to the port of destination within _ _ hours after the loading is completed and the formalities are completed. Otherwise, the delay fee shall be borne in accordance with Article 3 of the Cargo Rules.
Article 5 Navigation contact
After the ship is loaded and set sail, Party B shall send a telegram to inform Party A to prepare for unloading. If pilotage is necessary, Party B shall also inform Party A to send a pilot on time, and the expenses shall be borne by Party A. ..
Article 6 time of unloading
Party A guarantees that Party B's ship will arrive at the anchorage of _ _ port and unload the cargo within _ _ hours from the date of anchoring. Otherwise, Party A shall pay Party B a penalty of 0.075 yuan per ton. During the loading and unloading process, the time when the weather affects the loading and unloading operation can be deducted according to the actual influence time of the ship visas of Party A and Party B. ..
Article 7 Transportation quality
When Party B loads the ship, Party A shall send personnel to supervise the loading, guide the workers to operate according to the regulations, and seal the cabin after loading, and Party A may send personnel to escort (free of charge) the ship. Party B shall guarantee the original shipment, and Party A shall be solely responsible for the quantity and quality of _ _ _ _ _ _ _ _ _ _.
Article 8 Transportation expenses
According to the first-class freight rate of water transportation, the freight rate is RMB _ _ yuan according to the deadweight tonnage of the ship, and the air travel fee is RMB _ _ yuan according to 50% of the freight rate. The freight for the whole ship is RMB _ _ _, which is charged at one time.
Port handling fees shall be charged according to the relevant rates in the Port Charging Rules. The expenses such as unloading the ship shall be directly handled by Party A at the port of arrival.
Article 9 expense settlement
After both parties sign this contract, Party A shall pay the transportation fee to Party B in advance. After unloading the ship, Party B shall settle the account with Party A on the basis of the transportation fee voucher, and refund more and make up less.
Article 10 The original of this contract is in duplicate, with each party holding one copy. In the following cases, the copy shall be in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Supplementary terms have the same effect as this contract. This contract shall be submitted to the notary office for notarization (or certified by the administrative department for industry and commerce).
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Transport agreement with driver 3
Party A: _ _ _ _ _ _ ID card: _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ ID card: _ _ _ _ _ _ _ (hereinafter referred to as Party B)
Party A and Party B have reached the following agreement through friendly negotiation:
Party A shall ensure smooth roads, earth borrowing, loading and unloading during construction.
Party B is responsible for transportation: transportation location: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Party B's vehicles are required to be _ _ (Jiefang, Dongfeng Wangpingtou, Steyr); The trunk is 5.3m long, 2.3m wide and 1.4m high.
Distance: _ _ km
Freight: _ _ _ _ yuan
Settlement method: once every 24 hours according to the number of trains (cash)
Both parties to this agreement agree that Party B will arrange construction vehicles to arrive at the existing facilities in _ _ _ _ _ _ _ _ _ _ within the agreed time.
Party A is responsible for contacting and lodging, and Party B's motorcade pays the rent by itself.
Party A arranges Party B to charge a reasonable project management fee: _ _% of the total project cost.
Liquidated damages: If Party A fails to arrange the project as agreed after the arrival of Party B's motorcade, the breaching party shall pay Party B the liquidated damages of 500 yuan per day for each vehicle. If Party B's motorcade fails to arrive at the construction site as agreed, the breaching party shall pay Party A a penalty of 500 yuan/day.
This agreement is made in duplicate and has the same legal effect after being signed by both parties.
Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Party B: _ _ _ _ _ _ _ _ _ _ _.
Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ Representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Transport agreement with driver 4
Party A:
Party B:
Through friendly negotiation, Party A and Party B reach an agreement on the stumpage cutting of Party A's woodland, and hereby sign this timber transportation contract for both parties to abide by and perform.
The first project
(1) project name: 20__ _ year town and village forest harvesting and transportation project.
(two) the location of the project and the number of forest classes and small classes
Town and village forest classes are small in scale, and the cutting area is about mu. For details, please refer to the attached schematic diagram of cutting operation boundary division.
(3) The basic price and measurement of project funds:
See table 1 for the unit price standard of project funds. The unit price of project funds adopts the pricing method of "one-stop" operation.
According to the cost of cutting, pruning, timber making, skidding, stacking, loading and transporting timber out of the forest area when necessary, the cost of machinery, labor and temporary living facilities is valued, and the classification standard of standard timber and non-standard timber is distinguished. The price in table 1 is the basic price, and the actual settlement unit price is subject to this timber transportation contract.
Wood measurement method:
(1) timber of specifications shall be transported in the woodland first, subject to the weighbridge set by Party A in the timber yard.
⑵ The quantity of non-standard timber shall be subject to the weighing weight when the woodland is loaded and transported to Dongmei Factory.
Article 2 Obligations of both parties
(I) Party A's obligations
1. Solve the relevant policies and procedures of forest harvesting, handle the relevant documents required by the forestry management department, and pay the project payment in time as agreed in Article 10.
2. Send cutting technicians to supervise Party B to cut and transport trees as agreed.
3. Send management personnel to supervise the management and protection of trees in Party B's cutting area.
4. Handle disputes caused by unclear ownership and boundary, and bear relevant expenses.
5. Be responsible for the mechanical maintenance of the existing forest roads in the cutting area.
6. Supervise and inspect the safety work of Party B's construction personnel.
7. Advance the basic expenses of Party B in the early stage of mobilization operation as the economic advance payment for Party B's normal construction and life, and deduct it from the settlement project payment on schedule in the future. (Both parties negotiate: deduct by stages)
(II) Obligations of Party B
1, organize construction personnel, mechanical equipment and production and living materials to enter the site. Responsible for the labor discipline, work management, safety production, labor timber transportation contract and other matters of subordinate construction personnel. The methods and tools for logging and skidding shall be decided and provided by Party B according to the specific conditions.
2. Make a thorough investigation according to the content and scope of the cutting license, determine and indicate the cutting sequence, the general direction of falling trees in the working class, the skidding mode, the skidding path and the return position of the roadside and temporary storage yard.
3. Be responsible for the specific daily construction arrangement and related matters of logging personnel.
4. Ensure that the timber transportation contract is signed within 3 days (calendar days) after construction; Ensure that the timber output reaches more than 50 tons per day five days after the signing of this timber transportation contract (except the days that can be extended).
5. Party B's production and construction must be cut in accordance with the cutting scope and standards stipulated in the cutting certificate and the construction timber transportation contract.
6. During the logging period, Party B shall cut, prune and log, and return to the pile; Logging and skidding in the morning, loading in the afternoon, weighing as much as possible on the day of logging and transportation, and in principle, not leaving wood in the woodland for the night.
7. Party B shall prepare the construction organization plan, construction precautions, quality assurance measures and safety production measures, and carry out the construction according to Party A's technical standards and small class inspection. When organizing workers, according to the characteristics of transportation and forest land leaving no wood on that day, the workers should be sliced in groups and arranged for construction on that day. Bear the related property losses caused by improper construction organization and the losses caused to Party A due to project delay.
8. Production and construction must be carried out in accordance with the technical standards required by this timber transportation contract, and subject to the supervision of Party A ... After cleaning, there is no eucalyptus wood and stumps in the cutting area, and the cutting height does not exceed the standard. If it fails to meet the standard, it shall be compensated according to the provisions of this timber transportation contract.
9. Stack wood according to the actual terrain and traffic conditions. All cut timber should be collected as soon as possible to the temporary storage yard in the forest land and piled up according to the standard classification to facilitate loading and transportation.
10, partly responsible for poor management of logging areas.
1 1. Be responsible for safety production in the construction process and all expenses arising therefrom, and be responsible for safety education and training of construction personnel. Only after passing the training can they enter the cutting area for operation. Before construction, a warning line for safe operation must be delineated, and obvious safety warning signs should be set up. When necessary, construction personnel should form the habit of calling mountains. Non-staff, especially local villagers, are not allowed to enter the construction site at will to pick up logging residues during construction. If the above-mentioned safety accidents and disputes are caused by poor management, Party B shall bear all the responsibilities.
12, liable for property losses caused by construction. If houses, crops, fruit trees, bamboo and wood, tombstones, sacred places, overhead wires, optical cables, water diversion pipes (canals) or other facilities around the forest land are damaged due to careless operation, Party B shall properly handle them by itself and bear all compensation responsibilities.
13, and bear the legal responsibility caused by the mountain fire caused by the mistakes of Party B's staff in work or life. Strictly implement the fire prevention system related to mountain construction.
14. Pay attention to safety where high and low voltage wires pass, work carefully, and strictly control the backward direction of trees. If Party B operates illegally, it shall bear the relevant responsibilities of the accident.
15. Party B is responsible for managing its own personnel and not participating in illegal logging. If this happens, Party B shall bear relevant responsibilities.
16. The project shall not be subcontracted or withdrawn halfway, otherwise it shall bear relevant losses and responsibilities.
Article 3 Project duration
(1) The total construction period of this project is: to enter the site before 20 days, and the construction period is days (this timber transportation contract is calculated according to natural days). The completion time is before 20__.
(2) In case of any of the following circumstances, the construction period shall be postponed accordingly after being verified and signed by the representatives of both parties on site, and the resulting losses shall be borne by both parties themselves and shall not be liable for breach of contract.
1. Party A has adjusted the forest land management plan under this timber transportation contract and extended the construction period of the mining and transportation project.
2. Due to external reasons such as villagers' blocking or impassability of main roads, timber can not be transported temporarily, which affects the progress, and logging transportation can not be timely or delayed due to problems such as maintenance of forest highway in cutting area or construction of bridges and highways.
3. Party A fails to allocate the project funds as stipulated in the timber transportation contract, which affects the construction.
4. Due to force majeure and other factors (such as rainy season, typhoon, flood, earthquake, etc. ) and delay the construction period.
Article 4 Technical Standards
In addition to the above standards, Party A particularly emphasizes the following technical standards. Party B shall strictly abide by these standards formulated by Party A, and accept the supervision and acceptance of Party A and the forestry department.
1. Wood specifications: Necessary measures should be taken in the process of cutting, pruning, timber making and skidding to ensure that the wood does not split, crack or damage, and the use value of the wood does not decrease. According to the materials specified by Party A, the materials shall be stacked in different categories, so as to facilitate loading, transportation, stacking, weighing, measuring and settlement of project funds.
(Material specification: actual small head peeling diameter ≥( 6) cm, bending degree.
2. Before the logs are shipped, the on-site inspectors of Party A will go through the inspection and shipment procedures with Party B and fill in the relevant documents.
Article 5 Design, Construction and Change
(1) The cutting drawings shall serve as an effective basis for construction after technical disclosure by both parties, and Party B shall not change them without authorization.
(2) During the construction, if Party A needs to modify or change the logging standard and logging scope, it shall notify Party B in advance. Therefore, if it is necessary to increase the construction time, the construction period will be postponed accordingly after confirmation by both parties.
Article 6 Time, Place and Method of Delivery
(1) Delivery time: Timber is required to be collected at a place where timber can be stacked beside the forest road on the day of logging, and in principle, it is shipped and delivered on the same day. For other reasons, the goods must be delivered within 48 hours (except for rainy days, typhoons, road construction, vehicle dispatching and maintenance, etc.). ).
(II) Delivery place: According to Party A's arrangement, the specification materials and non-specification materials will be delivered in the woodland after being directly loaded.
Article 7 Project acceptance
(1) The project acceptance shall be carried out according to the following procedures: the engineering team shall fill in the quality inspection acceptance report form by itself, and Party A and the site construction personnel in the work area shall put forward their opinions. The logging department of Party A shall arrange formal acceptance within five days after receiving the report requiring acceptance, and fill in the acceptance result report form.
(2) The acceptance and self-inspection items are as follows:
1. Pile cutting height inspection:
(1) Spot check area: Spot check is made according to the sub-class area of 1%, and the "strip standard plot" is set to cover the upper, middle and lower parts of the forest land as much as possible, and the total number of felled piles is investigated to check the percentage of unqualified felled piles (excessive height of felled piles, broken tree heads and core pulling). Each spot check randomly checks the area of half an acre (for example, 74 pieces are randomly cut per acre 148 plants, and 55 pieces are randomly cut per acre11plant).
⑵ Determination of eligibility criteria: the percentage ≥95% (the qualification rate is rounded to the nearest integer, the same below) is qualified; & lt95% is unqualified, and those who are unqualified shall be treated according to the terms of breach of contract.
2. Woodland inspection: Woodland cutting residues are not covered on the cutting roots, and the required rework period cannot be reached.
3, logging, stumpage inventory:
(1) skidding quality inspection:
Clean up and check the mountain. In order not to waste wood, logging must be carried out in strict accordance with the requirements. After completing logging operation, Party B shall first conduct self-inspection and then apply to Party A for quality inspection and acceptance.
Self-examination content:
(a) the felling of trees and stumps shall not be omitted;
(2) Check the available and unavailable tail (treetop) materials and wood segments.
(2) Inspection and treatment methods:
① Inspection and acceptance method: Party A appoints technicians to inspect the forest land together with the person in charge of Party B, and according to the contents of self-inspection, clean up all the residual eucalyptus wood in the forest land in small classes.
(2) Treatment method: After the checked timber is counted according to the pile, the quantity value of timber is checked according to the subcategory, and the compensation is 2 times of the engineering quantity.
Article 8 rework and its responsibilities
If Party A finds quality problems during construction or quality inspection, Party B shall immediately rework and rectify them. If the rework exceeds the construction period, Party B shall bear the liability for breach of contract for the overdue completion.
Ninth project settlement price, payment method and time limit
(1) Both parties shall determine the settlement price according to the following completion time:
1. If the project is completed within the time limit stipulated in the timber transportation contract (including the extended time limit), all the timber is shipped out and all the forest land is qualified, it will be deemed as completed on time, and Party A will settle all the project funds at the base price.
2. If the project is completed within 20 days after the expiration of the period stipulated in the timber transportation contract (including the extended period but expired), and all the timber is shipped out and all the forest land is qualified, Party A shall settle the project payment at 100% of the base price.
3. If the project is not completed within 20 days after the expiration of the period stipulated in the timber transportation contract (including the extended period but expired), or Party B and its employees are caught smuggling timber, both parties need not go through any formalities, and this timber transportation contract will be unconditionally terminated by themselves. The project payment paid by Party A is the settlement project payment. If there is any unpaid project payment, Party A does not need to pay it to Party B, nor will it be returned to Party B as liquidated damages. The remaining stumps and timber cut in forest land will be recovered by Party A free of charge according to the specific situation and handed over to a third party for disposal.
4. When the amount of timber harvested by Party B reaches more than 300 tons, Party A shall pay 85% of the project funds payable at the base price according to the amount of timber harvested and transported, and the remaining project funds shall be paid at the settlement price within 5 days after all logging subcategories under the timber transportation contract are qualified.
Article 10 Liability for breach of contract
(1) In any of the following circumstances, Party A has the right to terminate this timber transportation contract, and the performance bond will be used as liquidated damages, and Party B will compensate Party A. ..
1. Within three days after the signing of this timber transportation contract, Party B fails to enter the site for construction;
2. Party B cannot guarantee to reach the agreed sunrise timber quantity within three days after the signing of this timber transportation contract (subject to the inspection of the weighing list and measurement list);
3. Party B's overdue completion is more than 20 days (excluding the days of delay).
(2) Party A shall bear the liability for breach of contract for overdue payment of project funds.
(III) Acceptance according to the terms of this timber transportation contract. For those who fail to meet the technical standards and violate the agreement, in addition to the above agreement, both parties agree to deal with the following situations. Party B will compensate Party A with the amount of breach of contract guarantee, and the insufficient amount will be deducted from the project payment payable to Party B and paid separately. ..
1, when the specification timber is inspected in forest land, the qualified rate is ≥ 95%; If the quality of wood is lower than qualified, 30% of the vehicle project price will be deducted. The calculation method is: (95%- qualified rate) _ 100_ vehicle timber quantity _ unit price of project payment _30%.
2. For loggers who do not obey the instructions of Party A's on-site construction technicians (production safety supervisors in logging areas), do not cut down according to the requirements of the timber transportation contract, and damage many eucalyptus budding trees in the process of logging, skidding, plowing and cleaning, irrelevant personnel are allowed to pick them up without stopping or reporting.
3. If Party B and its personnel don't comply with the relevant regulations on safe production or listen to advice, they can make compensation according to the relevant provisions of this timber transportation contract and its annex 1 (logging construction safety timber transportation contract).
(4) If Party B or the personnel employed by Party B participate in the smuggling of Party A's timber, they can unconditionally terminate the timber transportation contract by themselves, unless it is handled by the local forest police. When the contract is terminated, in addition to the above agreement, Party A will also sue Party B for four times compensation for the stolen timber.
(5) If either party commits other breach of contract, the breaching party shall compensate the observant party for the corresponding losses.
Article 11 Supplementary Provisions
Party A: Party B:
Time: _ _ _ _ _ _
Transport agreement with driver 5
Party A (shipper):
Party B (carrier):
Party A and Party B, in accordance with the relevant provisions of the Contract Law, entered into a contract for the carriage of goods through consultation, with the following terms:
1. The term of the contract is one year, from the date of the month to the date of the month.
2. During the above contract period, Party A entrusts Party B to transport the goods by car and road. The name, specification, model, quantity, value, freight, place of arrival, consignee and delivery period of the specific goods shall be determined by both parties, and the waybill shall be signed as an annex to this contract, which has the same legal effect as this contract.
Three. Obligations of Party A:
1. The goods shall be packed according to national standards. If there is no uniform packaging standard, the packaging shall be carried out according to the principle of ensuring the transportation of goods. If the packaging of Party A's goods does not meet the above requirements, Party B shall lodge a complaint with Party A, and if Party A does not correct it, Party B may refuse to start the shipment.
2. Pay the freight to Party B according to the standard and time agreed by both parties.
Four. Obligations of Party B:
1. According to the requirements of the waybill, transport the goods to the place designated by Party A within the specified time limit and deliver them to the consignee designated by Party A..
2. The transported goods shall be responsible for safety and ensure that there is no shortage or damage to the goods. If such problems occur, they should be liable for compensation.
Verb (abbreviation for verb) Transportation expenses and settlement methods:
1. The freight is calculated according to the mileage and weight of the goods actually carried by Party B, and the specific standard is implemented according to the waybill.
2. When delivering the goods to the consignee, Party B shall ask for the receipt certificate as proof of completing the transportation obligation, and settle accounts with Party A on the basis of the receipt certificate.
3. Party A shall review the receipt voucher submitted by Party B, and pay the current freight within 10 days after confirming that the voucher is true and valid, the goods arrive on time and there are no missing or damaged problems.
6. The goods delivered by Party A to Party B are important means of production for customers, and Party B should attach great importance to them to ensure that the goods arrive on time. If the arrival of the goods is delayed due to force majeure other than natural disasters, and if the customer thinks it is Party A's responsibility, Party B shall fully compensate Party A for its economic losses. If the goods cannot reach the destination on time due to force majeure such as natural disasters, Party B shall promptly notify Party A and obtain relevant certificates so that Party A can coordinate with customers.
7. If the goods are lost, short, damaged, deteriorated and polluted during transportation, Party B shall compensate Party A for the economic losses according to the following standards.
1. If the goods are lost or cannot be used normally, full compensation shall be made according to the price recorded in the waybill. If the price is not recorded on the waybill, compensation shall be made according to the ex-factory price of similar products of Party A..
2. If the goods can be used normally after repair and the customer has no objection, the repair costs (including replacement costs, labor costs and round-trip travel expenses of repair personnel, etc.). ) to compensate.
Eight. If the arrival of the goods is delayed due to the reasons in Article 7 of this contract, Party B shall not only bear the responsibilities in accordance with this article, but also implement the provisions in Article 6 of this contract.
Nine. Matters not covered in this contract shall be settled by both parties through consultation. If negotiation fails, it shall be handled in accordance with the provisions of the Contract Law. Any dispute shall be submitted to Beijing Arbitration Commission for arbitration in accordance with its arbitration rules.
X this contract is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties.
Party A: Party B:
Attachment: waybill number:
Date of Issue: Year Month Day Delivery Time: Year Month Day
Issuing place: provincial highway number; Place of delivery: provincial highway number.
Shipper: Carrier:
Signature of shipper and signature of carrier
Year, month, sun, moon, sun.
Articles related to the driver's vehicle transport agreement:
★ Model driver transport agreement
★ Model vehicle transportation contract agreement
★ Simple transport agreement template
★ The latest three model clauses of the consignment contract.
★ Simple mode of transportation contract
★ The latest three transport contracts of truck drivers
★ Responsibility Letter of Driver's Transport Safety Agreement
★ Vehicle Logistics Transportation Contract Agreement
- Previous article:Sample essay on rural residential environment improvement plan (three articles)
- Next article:Make a recommendation card for Ji' an city
- Related articles
- The slogan of the college entrance examination running class is domineering and rhyming
- Exploration engineering geological design
- Detailed explanation of the treasure-digging game of the league of kings in troubled times
- What are the idioms of commonly used words?
- Words with the theme of celebrating National Day.
- What are the advantages and disadvantages of Ankang Wuyou critical illness insurance? What are the guaranteed contents?
- Opening speech of enterprise opening ceremony
- Simple illustrations for the Double Ninth Festival-How to draw a handwritten newspaper for the Double Ninth Festival that is simple and beautiful
- How to write the design description of logo?
- How to register as a Meituan merchant?