Joke Collection Website - News headlines - Construction Safety Accident Responsibility Letter
Construction Safety Accident Responsibility Letter
Responsibility letter for construction safety accidents (selected 5 articles)
In study, work and life, the responsibility letter plays an increasingly important role. The responsibility letter can make us fully Realize the importance of responsibility. How should a responsibility letter be drafted appropriately? The following is the construction safety accident liability letter (selected 5 articles) that I compiled. You are welcome to learn from and refer to it. I hope it will be helpful to everyone.
Construction Safety Accident Responsibility Letter 1
In order to ensure safe construction and your health, you must obey the safety management of this project and abide by all regulations from the day you enter this project. According to the safety production rules and regulations, consciously take your own safety protection measures so as not to harm others or be harmed by others, and consciously abide by the following provisions:
1. You must wear a safety helmet and buckle when entering the construction site. Wear a good hatband; it is strictly forbidden to wear slippers, hard-soled shoes, high heels, bare feet, and bare shirts; use personal labor protection equipment correctly.
2. It is not allowed to throw materials, tools and other objects downward or upward when working at heights; safety belts must be fastened when working in the air.
3. It is not allowed to climb up and down the scaffolding or derrick; it is strictly prohibited to ride on the derrick basket; it is strictly forbidden to close the protective door of the material hoist platform; it is not allowed to stay or work under the tower crane arm, and illegal operations and illegal commands are strictly prohibited.
4. Non-certified electrician personnel are not allowed to disassemble and assemble electrical equipment and connect wires; they are not allowed to tie or move electrical switches so that they lose their protective functions; non-certified mechanical operators are strictly prohibited from starting, operating, Use mechanical equipment.
5. All types of mechanical equipment should be checked for safety and functionality before use, and mechanical equipment without safety protection or faulty equipment should not be used; if any abnormalities are found during use, use should be stopped immediately and reported to the manufacturer. Management reports.
6. It is not allowed to sit on handrails or sleep on scaffolding or on the edges of roofs, balconies, etc.; it is strictly prohibited to walk around unprotected buildings, on the edges of openings, and on unfixed components. and operations; cross operations in the same vertical direction are not allowed.
7. It is strictly prohibited to destroy or dismantle safety facilities without authorization; when operations require it, when dismantling or changing safety protection facilities near the edge, the project leader must obtain the consent and take corresponding reliable measures. The operation should be restored immediately. .
8. Smoking is not allowed at the construction site; it is strictly prohibited to use open fires at the construction site without approval; it is strictly prohibited to move or use fire extinguishing equipment without authorization during non-fire alarms; it is strictly prohibited to move protective facilities.
9. Do not take risks or act recklessly or make a scene while working; working under the influence of alcohol is strictly prohibited.
10. It is strictly prohibited to use gas stoves, rice cookers, induction cookers, heating appliances and other high-power heating appliances in dormitories; it is strictly prohibited for men and women to live together; children are prohibited from entering the construction site; personnel without safety training are not allowed to work on the construction site. stay.
11. After an accident, actively rescue the injured and property, protect the scene, and report to the leader in a timely manner.
12. The project department must implement necessary safety protection supplies and safety protection facilities in accordance with the requirements of "safe production and civilized construction" to provide construction personnel with a safe and civilized construction and living environment.
13. If the construction management personnel violates the above clauses, the operators have the right to refuse to execute the orders. If an accident is caused by the issuing person's forced illegal operation, the issuing person will bear all the responsibilities and will be subject to criminal liability.
I consciously abide by the above terms. If there is any violation, I am willing to accept financial penalties until I am kicked out of the venue. I am willing to bear all economic losses and criminal liability for any accidents caused.
xxx
Letter of Responsibility for Construction Safety Accidents on xx, xx, 20xx 2
Party A: _______________ Co., Ltd.
Party B: _______________Project Department
In order to implement the "Construction Law", "Construction Project Safety Production Management Regulations" and the Ministry of Construction's "Construction Project Construction Site Management Regulations" and the spirit of provincial and municipal documents related to safety production, the company has added , the responsibilities of construction safety management personnel at all levels in the project department, implement the safety work responsibility system, prevent the occurrence of safety accidents, and formulate an annual safety target management responsibility letter. The specific responsibilities are as follows:
1. Party A’s safety work responsibilities
1. Conscientiously publicize and implement the "Construction Law", "Construction Project Safety Production Management Regulations" and the Ministry of Construction, Provincial and municipal regulations and notices on strengthening safety production and equipment management shall be supervised in strict accordance with the "Construction Safety Inspection Standards" (JGJ59-99), and the project department shall be guided to implement according to the "Mechanical Equipment Management Regulations".
2. Organize and carry out safety production and mechanical equipment inspections on a monthly basis, conduct random inspections from time to time, supervise and guide the project department to rectify potential accident hazards, hold safety production meetings regularly, and study and arrange safety production work , work with the safety supervision station to carry out the installation and acceptance of large equipment. Units and individuals found during the inspection that fail to rectify potential safety hazards have the right to impose financial penalties.
3. Organize and carry out the "Safety Production Month" and the "100-Day Safety and Accident-Free Activity Competition", set up a safety competition activity group, formulate activity plans, and do a good job in summary and evaluation.
4. Work with relevant departments to organize the education and training of special types of work and safety technicians, and be responsible for the training, assessment and certification of machine operators.
5. At the end of the year, the company will commend project departments and project managers with advanced safety production, and give appropriate rewards to project departments that create civilized construction sites at or above the municipal level.
2. Party B’s safety work responsibilities
1. Be sure to conscientiously implement the "Construction Law", "Construction Project Safety Production Management Regulations" and other relevant laws and regulations, and improve and improve various safety regulations System and safety responsibility system at all levels, implement the principle of "whoever works, who is responsible" to prevent the occurrence of safety accidents. If a casualty accident occurs, it must be reported to Party A and the superior administrative department in a timely manner in accordance with regulations, and consciously understand the investigation of the superior administrative department. deal with.
2. Be sure to conscientiously implement the requirements of the Ministry of Construction's "Regulations on Construction Site Management of Construction Projects" and the Provincial and Municipal Construction Bureau's "Notice on the Establishment of Polite Construction Site Activities", and strictly follow the "Construction Safety Inspection Standards" (JGJ59 —99) Carry out safe production and civilized construction management at construction sites, and understand and obey the supervision, inspection and guidance of Party A, carefully organize and carry out civilized construction site establishment activities, and each project department will strive to create a civilized construction site in the city and strive to save the province of civilized construction sites.
3. Carefully organize and carry out the "Safety Production Month" and the "100-Day Summer Safety and Accident-Free Activity Competition" to promote safety standards, establish a smooth construction site, hold safety production meetings and organize safety production inspections on a regular basis , to achieve two guarantees, to ensure that the safety compliance rate is 100% in line with the standards, and to ensure that the software data is 100% complete.
4. Personnel in special types of work must all hold certificates to work, and operations without certificates and license expiration must be eliminated. Party B must have an adequate number of personnel to manage safety. For projects with a construction area of ??less than 10,000 square meters, one full-time safety officer must be assigned. For projects with a construction area of ??more than 10,000 square meters, there must be 2-3 full-time safety officers. For large projects with a construction area of ??more than 50,000 square meters, different safety officers should be assigned. A professional safety management team is formed to conduct safety supervision and management.
5. Strengthen the management of mechanical equipment, be responsible for establishing distribution accounts, conduct regular inspections, repairs, and maintenance. It is strictly prohibited to operate without a license or operate with disease, and timely eliminate mechanical equipment with poor safety and technical performance, and are not allowed to use it. Mechanical equipment without a production license or license, all safety protection supplies, scaffolding steel pipes, fasteners, safety nets, etc. must comply with national standards and have product certificates.
6. Strengthen the management and education of migrant workers, improve labor management and measures, on-site construction personnel are posted on the job, and unidentified people are not allowed to use them. Personnel with poor ideological awareness, bad behavior, and poor physical fitness are not allowed to use them. It is not allowed to be used. New workers are not allowed to work or use it without safety training and pre-job education.
7. Do a good job in safety publicity at the construction site, post safety slogans, hang safety banners, signs and warning signs should be eye-catching and neat, so as to create a strong safety atmosphere on the construction site.
8. Temporary standard power distribution boxes and steel pipe scaffolding must be used during construction in accordance with regulations. Partial projects with greater risks must have special construction plans and measures (emergency rescue plans, basic pit enclosure, formwork support, scaffolding, temporary electricity, etc.) and should be prepared by a safety technician, reviewed by the project technical leader, and approved by the company's technical leader. The construction site must be equipped with a full-time safety officer. Party B should frequently conduct self-inspections on the safety facilities at the construction site. If any potential accidents are discovered, Party B should promptly report to Party A and make immediate rectifications.
9. The project department must improve the safety production responsibility system at all levels, including project managers, project safety officers, project technical leaders, construction workers, material workers, security firefighters, machine managers, warehouse custodians, Work team leader, production worker.
3. Reward and Punishment Measures:
Each project department should complete the construction site establishment indicators as required. Those who complete the indicators will be rewarded, and those who fail to complete the indicators will be punished.
1. Appropriate rewards will be given to municipal civilized construction sites and provincial civilized construction sites established by the project department. If they do not meet the civilized construction site standards, appropriate penalties will be imposed.
2. The project department will be fined 50,000 yuan for every serious injury accident and 100,000 yuan for every fatal accident. All economic losses and legal liabilities will be borne by Party B.
IV. Others
1. This letter of responsibility serves as an attachment to the project construction management agreement and is equally valid as the contracting agreement.
2. This letter of responsibility shall be made in duplicate, one for Party A and one for Party B. It shall be signed and sealed by both parties to take effect and shall be executed in good faith.
Party A: _______________ Party B: ______________
Representative: _______________ Representative: ______________
Attestation: _______________ Date: ______________ Construction Safety Accident Responsibility Letter 3
In order to conscientiously implement the policy of "prevention first, safety first", we will further strengthen construction site safety management, control and reduce casualties, and promote the further improvement of the construction safety production situation. According to the safety responsibility letter and requirements issued by the superior authorities and combined with the actual situation of our company, we decided to issue a safety responsibility letter to the construction site of the project and implement safe construction target management.
1. Fulfill the four musts:
1. Be sure to conscientiously implement the safety production rules and regulations and safe operating procedures, reasonably arrange the work of the team members, and be fully responsible for the work of the team members in production. Safe and healthy.
2. Be sure to carefully carry out self-inspection, mutual inspection, and handover inspection of the project in accordance with safety and quality requirements and inspection procedures. If the inspection fails, it will not be transferred to the next process of construction, and the safety and quality of the process must be strictly controlled.
3. Be sure to limit the use of materials, collect materials within quotas, use materials strictly according to quotas, and reduce material consumption. Don’t use big materials in small quantities, don’t use long materials in short periods, and use mechanical equipment and tools according to operating procedures.
4. All safety technical measures and technical responsibility systems must be implemented, and all drawings, documents, materials, original records, archives, etc. during construction must be complete, authentic, intact, and archived in a timely manner.
2. Do nine tasks every day:
1. Check the safety hazards of the working environment before work and keep records. And make corrections in a timely manner without pushing it to the foreman.
2. When arranging work for the day, safety and quality precautions must be mentioned and records must be kept.
3. Take the initiative to find the foreman to solve on-site management problems such as progress, quality, safety, materials and tools in the responsible area during construction.
4. Team members participate in the construction technology, process, and quality briefing organized by the foreman, organize team members to carefully conduct self-inspections and mutual inspections, participate in sub-project quality inspection and assessment, and participate in sub-project quality assessment Sign the form, fill in various original data as required, and be responsible for the reliability of the data.
5. Instruct workers to fasten safety belts when working at a height of more than 2 meters, and check that workers in the team must wear safety helmets when entering the construction site.
6. Organize internal technical exchanges among team members, and continuously improve the operational technical level of team members. Materials, finished products, components, and equipment that do not meet the design requirements and quality standards shall not be used, and report to the team leader and Responsibilities reported to superior leaders.
7. Organize team members to read the drawings carefully, carry out construction according to design drawings, technical explanations, specifications, process standards, and quality standards, and be responsible for the quality of sub-items and sub-projects of the contracted construction.
8. The materials used on the day should be cleared after the work is completed. Unused materials should be returned to their original places. The mechanical equipment used on the day should be cleaned and maintained according to regulations. The tools used on the day should be cleaned. Take back the warehouse.
9. Regularly educate team members on the ideological education of "safety and quality first". The following procedures are the user's thoughts, improve the operation quality of each member, and hold team members responsible for illegal operations and shoddy work. The right to stop and rework. If quality problems are found, report them to superiors in a timely manner. You are not allowed to deal with them without authorization or conceal them, otherwise you will bear all responsibilities.
3. For the project manager and each construction team, their safety responsibilities are as follows:
1. The construction site project manager (project technical leader) should often study and solve the actual problems in safety production problems and ensure the implementation of the safety production responsibility system. It is also responsible for the deployment and supply of people, finances and materials required for the construction of the project, and timely resolution of difficult problems encountered during the construction to ensure the smooth progress of the project.
2. The company will regularly conduct follow-up inspections on the implementation of the safety production target management responsibility system to ensure implementation at one level and at all levels to prevent formalism and superficiality.
3. The company will strictly evaluate the implementation of this letter of responsibility at the construction site. Those who do well will be commended and rewarded, and those who do poorly will be criticized. If a safety accident occurs due to lax implementation of the responsibility system or failure to conscientiously implement it, the responsibilities must be investigated in accordance with relevant regulations.
4. Have the right to coordinate, supervise, inspect and punish each team's work standards, quality, progress, safety production, polite construction, personnel arrangements, labor use, economic distribution, etc., and have the right to violate project management Institutional behavior has the right to exercise financial compensation and dismissal.
5. Each team and team strictly controls safety and quality, so that no quality or safety accidents occur. Achieve standardized management of process operations, quality, and safety, promptly solve problems that arise during construction, and report to the foreman immediately if they exceed their own authority. The time from discovery to problem solving (reporting to the foreman) should not exceed 10 minutes.
6. Ensure the progress of the construction period, strictly implement safety technical disclosure, and strictly implement process quality operating procedures. Ensure that the work area is cleared upon completion of the day, materials in the responsibility area are stacked neatly, and the environment is safe and tidy.
7. It is strictly prohibited to use flammable and explosive items in the construction site, and smoking is strictly prohibited; smoking is strictly prohibited in the no-smoking area.
8. There should be no obstacles near the electrical box at the construction site, and private pulling of wires is prohibited.
9. Fire-fighting equipment equipped at the construction site must not be used for other purposes, and there must be no obstacles near the fire-fighting equipment.
10. No mechanical casualties or fire accidents.
11. Comply with the safety management system, participate in construction site safety production meetings, and implement meeting decisions.
12. Be sure to wear a safety helmet and hat strap when entering the construction site.
13. Each construction personnel shall bear the following responsibilities: major quality accidents; responsibilities for construction delay; major safety accidents; major public security disaster accidents.
14. The construction personnel of this team should be registered and the "three-level safety education" record of the construction personnel should be kept. Those who have not received safety education are not allowed to enter the construction site.
15. Personnel without identity documents, persons over 50 years old and under 18 years old, those who are infirm, suffer from heart disease, high blood pressure, epilepsy, high myopia and other contraindications are not allowed to work on the construction site.
16. When a fire occurs in an area prone to fire, effective preventive measures should be taken before construction.
17. Educate the employees of the unit to abide by the rules and disciplines, and not to give illegal orders or operate illegally. If any casualties occur due to construction workers violating rules, safety disciplines, or safe operating procedures during construction, the losses will be borne by the construction workers. Personnel is responsible.
21. Due to quality rework caused by construction personnel's illegal operation, command, and process operations, the material cost and rework fee must be compensated.
22. Managers at all levels will be responsible for the quality rework of process operations, construction organization design, instructions and other documents issued by the operating level due to violations of scientific management or due to the existence or management problems of the issued documents themselves. The person responsible and the responsible person shall be equally responsible for the compensation of material costs and rework costs according to their positions.
23. For safety accidents that occur due to illegal command, work dereliction of duty, etc., the responsible person shall bear all legal responsibilities and financial penalties.
There is only one copy of this agreement, which will be retained by us and will take effect from the date of signature. It is valid until the completion of this project.
Company representative: ________
Responsible person: ________
_________year________month________day_______year_______month_______ _Daily Construction Safety Accident Responsibility Letter 4
In order to complete the high-pressure jet grouting piles constructed by our team with high quality and efficiency, and to ensure the personal and equipment safety of employees, each construction unit and all construction management personnel must put safety first , with the awareness of quality first, take safety production measures, eliminate safety hazards, take safety precautions, organize production in strict accordance with technical disclosures and construction specifications, ensure safe, high-quality, and smooth completion of the construction of this project, and prevent safety accidents and quality problems during construction ACCIDENT.
In order to clarify the responsibilities of each unit and each production management personnel and ensure the safety and quality of the jet grouting pile project constructed by this soft foundation project department, each construction unit and foreman on duty hereby sign this safety agreement Quality Responsibility Letter.
1. Safety and quality responsibilities of construction units
Each unit must strengthen production management, improve construction quality, ensure safe production, often summarize experience and deficiencies in construction, and strengthen awareness of safe production, Strengthen production quality management, strengthen equipment maintenance, and ensure reasonable and economical use of materials.
(1) Construction safety responsibilities and requirements
1. Safety production responsibilities and requirements.
A. The person in charge of each unit is required to conduct employee safety training and skills training and guidance before production, establish awareness of production safety, prevent accidents, explain safety requirements and take safety measures carefully.
B. Carry out production strictly in accordance with the construction specifications and technical requirements of high-pressure jet grouting piles, eliminate safety hazards, and ensure safe production.
C. The main engine operator of each unit should be familiar with the performance and operation methods of the pile driver, hold a certificate to work, be able to closely cooperate with the auxiliary workers in construction, and have the potential to take emergency measures in case of emergencies; the main engine operator The operator must be a professional and skilled person, and other non-professional personnel are strictly prohibited from starting the machine without authorization; the main machine operator is not allowed to leave the machine during construction, otherwise it should be shut down; it is strictly prohibited to operate the pile driver due to fatigue or drunkenness.
E. When constructing the pile driver at night, ensure clear lighting around the pile driver.
F. When shutting down after get off work, the pile driver should be parked in a safe place, the loaded parts should be relaxed, the high-pressure pipe should be relieved and flushed, and protective measures such as braking, anti-skid, and windproof should be installed.
G. In case of heavy rain, heavy snow, dense fog and strong wind, operations should be stopped.
H. It is strictly prohibited to go out without permission from the person in charge of each crew. Vehicles and personnel who go out must pay attention to their own safety.
I. It is strictly forbidden for all personnel to have conflicts or fights with local people.
J. All personnel are strictly prohibited from bathing in the river privately;
K. When the weather is hot in summer, each unit should always prepare tea, cooling and heatstroke prevention medicines, etc.
L. Strengthen food hygiene in each canteen, prevent food poisoning, and maintain sanitation of the living environment;
Each unit must eliminate illegal operations and take responsibility for all accidents caused by illegal operations and intentional injury. Each crew assumes all responsibilities. Groups and individuals who violate the above safety management regulations or violate the "National Safety Construction and Production Regulations" and cause safety accidents shall be responsible for all economic responsibilities and compensation responsibilities. Those who violate regulations or blind construction and cause serious safety accidents will be prosecuted. Financial and Legal Responsibilities.
It is agreed that all units in Meishuilin will be managed by Meishuilin itself, and Meishuilin will be responsible for all safety accidents.
2. Safety production measures.
To achieve safe production and ensure the personal safety of personnel and equipment from damage, the following safety measures must be taken carefully during production.
A. The person in charge of each unit must give a pre-shift safety speech before starting the unit, explain the safety requirements, construction specifications and technical requirements, do a good job in safety protection, hang up safety signs, and employees must wear safety cap to enter the construction site;
B. Detailed inspection of drilling rigs, grouting pumps, generators and other machinery and equipment, and careful inspection of high-pressure pipelines, high-pressure valves, power lines, and water supply pipelines; the safety pin in the safety valve must be Conduct pressure tests to eliminate safety hazards and prepare for safe production.
C. During construction, operators of drilling rigs and high-pressure pumps are required to operate in strict accordance with the operating requirements of each equipment, strictly guard against reckless behavior, and take precautions to prevent accidents involving machine injuries.
The drilling rig and high-pressure pump must be operated by dedicated personnel, and the pressure gauge should be checked regularly.
The drilling rig must be placed stably and vertically to the ground to prevent the drilling rig from tipping over.
Drilling rig operators must cooperate with auxiliary workers and high-pressure pump operators to prevent the drilling rig from injuring people and preventing high-pressure jets from injuring people.
When installing and removing the drill pipe, be sure to make sure that the drill rig operator is ready, the drill pipe has completely stopped rotating, and the auxiliary tool has been notified before loading and unloading. The grab handle on the pad fork must be welded and the welding must be secure to prevent Hurtful.
The end of the drill pipe holder must be welded with a non-slip end, the drill pipe must be placed flat on the drill pipe holder, and the drill pipe holder must be placed stably to prevent the drill pipe from falling and crushing personnel.
Check the high-pressure safety valve and high-pressure pipes frequently to prevent high-pressure flow from injuring personnel.
Do a good job in safe electricity use. Do not pull wires without permission. Protect the distribution box and install leakage protection devices. Wires are not allowed to be exposed. The joints are firm and well protected to prevent leakage from hurting people.
D. Shut down the machine in time at the end of production, remove sludge, inspect and maintain equipment, put away pipelines and power lines, and provide cover.
(2) Construction quality responsibilities and requirements.
1. Each unit must strictly carry out construction in accordance with the construction specifications and technical explanation requirements of rotary grouting piles and the production requirements issued by the production management personnel, including pulping concentration, spraying time, spraying pressure, and re-spraying construction. The pile length, pile radius, shotcrete drilling speed, pile number and quality, cement consumption, and diesel consumption must all meet the requirements.
Each unit must protect the cement, add cement in strict accordance with the pulping concentration required by the production, mark the depth of the pulping barrel, add the specified amount of water first, then add cement, stir well and put it into the secondary mixing tank. When mixing the cement slurry, it is strictly prohibited to add water and cement while putting the slurry into the secondary mixing tank. Frequently use a density meter to detect the concentration of the cement slurry to ensure that the concentration is above 1.5 and meets the concentration requirements.
Each unit must strictly control the amount of diesel used, protect oil, and eliminate waste; engines that are not in use after get off work or when shutting down for meals and maintenance must be shut down; each unit must purchase its own briquettes or gas for cooking, and is strictly prohibited from being alone Generators are used to generate electricity for cooking, afternoon power generation and night lighting power generation when not producing (during production, only lead wires can be drawn from the generator in production). Only multiple units can use one generator at the same time. It is required that no more than two generators are generated at a time. Hour. Anyone who wastes fuel in violation of the above regulations will be fined 200 yuan each time.
2. Each unit must cooperate in setting out pile positions under the guidance of the foreman on duty. The unit will be responsible for any losses caused by placing piles without permission; during construction, if the production management personnel find that the unit does not perform construction according to the requirements, If a pile is found not to meet the requirements, the construction unit will be fined. The construction quantity of five piles with the same required depth will not be calculated as a penalty and will be deducted at the time of settlement; each unit is found to have insufficient pile length and insufficient shotcrete volume. Those who waste cement and diesel oil for five times will be deducted from the construction amount and will be cleared of appearance penalties.
3. Each unit must drive each detection pile according to the requirements of the production management personnel. The on-site foreman must be notified to record and construct the detection piles under his supervision. The location of the detection piles must be arranged as required. Complete the required quantity and mark it.
For units that violate the above requirements and fail to make rectifications after repeated warnings, shutdown and rectification measures may be taken, and all losses caused shall be borne by the unit.
4. Pile quality and testing responsibilities and requirements.
1) Each unit must ensure the quality and depth of each detection pile. Each unit of other engineering piles must ensure the quality and depth of each pile required for construction.
2) During Party A’s inspection and third-party inspection, the construction crew that extracted the piles shall be responsible for digging the core-pulling or static load inspection pile heads in a timely manner as required, and shall send personnel to cooperate in making inspection preparations , responsible for filling the holes after core pulling, no additional charges are allowed.
3) When each randomly inspected test pile fails, half of the testing business expenses incurred will be borne by the pile construction unit, and the unit's labor cost of 3,000 yuan will be deducted; the supervisor who supervises the construction of the pile will be fined The foreman will be fined 200 to 500 yuan depending on the severity; therefore, if Party A is fined or additional piles are added and piles are driven again, the construction crew will bear the corresponding responsibilities.
If ordinary engineering piles are extracted, the core extraction depth during core extraction does not reach the required depth during construction and the pile quality is unqualified, the responsibilities of all parties will be handled in the same manner as if the pile is unqualified.
2. Safety and quality responsibilities of foremen
On-site foremans must do a good job in "safe construction", establish the idea of ??"quality first, safety first", organize and coordinate the labor force , materials, equipment, water, electricity and other production factors, do a good job in construction work, ensure the smooth completion of production tasks, ensure safe production, and ensure the conservation of materials.
(1) Responsibilities and requirements for production safety.
1. Foremen on duty must have awareness of production safety, give safety speeches to the units before work, guide each unit to conduct safe production, frequently check whether various safety measures are in place, and urge each unit to eliminate safety hazards , supervise rectification, and make records and report them in a timely manner.
(2) Production quality responsibilities and requirements.
1. The foreman on duty must establish a high sense of quality responsibility, strengthen supervision of the production process of each unit, and supervise and verify whether the construction of the unit is carried out in accordance with technical requirements and construction specifications.
2. The foreman on duty must guide the laying out of pile positions, frequently check whether the pulping concentration reaches above 1.5, and check the drilling depth of the unit, drilling speed, shot time, shot pressure, and re-shot During construction, ensure that the pile length, pile radius, pile quality, etc. of each pile meet the technical requirements.
3. The foreperson on duty must guide, arrange, and monitor the entire process on site to lay and mark each inspection stake.
4. The foreman on duty is required to keep daily construction records, truthfully record the actual conditions during production and report them for statistics in a timely manner.
5. The monitoring unit uses cement, diesel and other materials rationally, takes good protection and eliminates waste; ensure that both cement consumption and diesel consumption meet the requirements.
6. During Party A’s inspection and third-party inspection, if the test piles randomly inspected by core pulling or static load are unqualified, the foreman supervising the construction of the pile will be fined 200 to 500 yuan depending on the severity;
If ordinary engineering piles are extracted, the core extraction depth during core extraction does not reach the depth required during construction and the quality of the piles is unqualified, the duties of the foreman will be treated in the same way as if the piles are unqualified.
3. This safety and quality responsibility letter will take effect upon being reviewed by the project leader and issued to the construction crew and foremen.
4. The right to interpret this safety and quality responsibility letter belongs to the project leader and on-site leader, and will be archived and retained by the Finance Office.
Project leader review: _______________ On-site person in charge: _______________
Signature of the person in charge of the responsible unit: _________
1# construction unit: _______________ foreman :_______________
2# Construction crew: _______________ Foreman: _______________
3# Construction crew: _______________ Foreman: _______________
4# Construction Crew: _______________ Foreman: _______________
Construction crew: ________ Foreman: _________
Date: Construction Safety Accident Responsibility Letter 5
1. Responsibility goals for safe production and civilized construction
Five preventions: prevent major casualty accidents, eliminate fatal accidents, eliminate major mechanical accidents, eliminate major traffic accidents, and eliminate major fire accidents.
First control: The annual injury rate is truly controlled below 10‰.
Three eliminations: eliminate illegal commands, eliminate illegal operations, and eliminate inertial accidents.
First creation: Create a safe and civilized standard construction site.
2. Responsibility for production safety
1. Conscientiously implement the policy of "safety first, prevention first", earnestly implement various rules, regulations and measures for production safety, and assist the project manager to grasp Good safety production work.
2. Actively participate in safety production work meetings, make reasonable suggestions on safety work, and assist the project manager in organizing safety production activities and safety inspections.
3. Managers must be on duty in a timely manner and not leave their duties during duty, keep records of problems they discover while on duty, report them in a timely manner, and propose solutions to solve problems properly.
4. Managers must be serious and responsible in their work, manage boldly, take the lead and urge the use of personal protective equipment, do not give orders in violation of regulations, and correct illegal operations at any time.
5. Assist the project manager to promote, educate and manage production safety, promptly summarize and promote advanced experience and specific measures in safety management, and ensure the smooth progress of safety work.
6. For hidden dangers and unsafe factors raised by relevant superior departments, relevant personnel should be promptly urged to make rectifications.
7. Those who take risks and violate regulations should be promptly stopped and educated
Project manager:
Constructor:
Year and month day;
- Related articles
- What is the meaning of soft sister (what is soft sister (including many))
- What are the good colleges and universities in Anhui?
- What are the origins of New Year's Day, Spring Festival and Lantern Festival?
- The behind-the-scenes production of my superman girlfriend
- On the morning of June, 2022 17, Wenzhou Yueqing epidemic prevention and control emergency drill notice.
- Is it true that Wen Biquan's four-piece 48 yuan?
- How to write 202 1 highlights of trade union work innovation?
- Slogan life
- Teaching plan design of "sending garbage home" social activities in kindergarten middle class
- What about Xinyu Hu Lin Real Estate Development Co., Ltd.?