Safety regulations for desulfurization, anticorrosion, fire prevention and poisoning prevention?

The desulfurization project has entered the construction stage of anti-corrosion rubber lining and scaling. As the raw materials used in anti-corrosion operations, such as diluent, toluene, acetone and scale finger, are flammable and toxic substances, in order to prevent fire and personnel poisoning accidents, the following safety management regulations are formulated in anti-corrosion construction and strictly observed.

1. Warehouse, stacking area, workshop, anti-corrosion construction equipment and anti-corrosion construction area of anti-corrosion materials are all key parts for fire prevention and poisoning prevention (hereinafter referred to as key parts).

Second, the key parts of anti-corrosion should be kept ventilated, dry and cool, away from open flames and heat sources.

Third, the anti-corrosion construction area must be closed and isolated. Fences or safety warning ropes shall be used around key parts for protection (no less than two safety warning ropes), and eye-catching fire warning signs shall be hung.

Four, the key parts of the lighting must use explosion-proof lamps and safe voltage; The power cord adopts rubber cord with good insulation, and the power cord cannot be pulled privately.

Five, key parts must be equipped with a sufficient number of dry powder fire extinguishers. The absorption tower, GGH and emergency slurry tank are equipped with fire hoses and arranged in the construction area.

Six, the key parts in addition to the equipment and materials used for anti-corrosion, the rest of the flammable materials should be cleared a safe distance, the site is not allowed to store excess anti-corrosion materials.

Seven, anti-corrosion construction units should assign personnel to patrol the key parts in shifts to prevent the fire from approaching the key parts of anti-corrosion, and make inspection records.

Eight, absorption tower and GGH to do a good job of anti-corrosion, in addition to the above measures, but also the exit and entrance flue isolation measures and designated personnel to guard.

Nine, absorption tower, GGH, flue, boxes and tanks before doing anti-corrosion, electric welding and fire welding work must be completed. After anti-corrosion, all anti-corrosion parts shall not be directly welded or ignited to avoid damaging or igniting the anti-corrosion layer.

Ten, because of work needs must enter the anti-corrosion area for electric and fire welding operations, should get in touch with the head of Datang Environmental Protection Project Department and the head of anti-corrosion construction in advance, with their consent, to Datang Environmental Protection Desulfurization Project Department to handle the hot work ticket, and strictly implement the hot work ticket procedure.

Eleven, anti-corrosion work area set up security alert circle, irrelevant personnel are strictly prohibited.

Twelve, who entered the anti-corrosion work area, must consciously remove the fire, and obey the management of security personnel.

Thirteen, fireworks are strictly prohibited in the construction site and fire prevention key parts, and all construction units should manage their own personnel according to the principle of "whoever constructs is responsible".

14. Punishment provisions: the fire safety supervision team will impose a fine of 1 1,000 yuan on the responsible unit for each cigarette end found on the spot; Violation of the above provisions will result in a fine of 1 0,000-11,000,000 yuan for each nonconformity found. Those who refuse to obey will be dealt with seriously once they are found, and will be dealt with according to the seriousness of the case until they are cleared. If serious consequences are caused, legal responsibilities will be investigated in accordance with relevant regulations.

15. During the anti-corrosion period, the anti-corrosion operation construction is the direct management unit of fire prevention, and bears direct management responsibility for fire prevention management. Other construction units must unconditionally accept the management within the scope of their cross-operation. During the construction period, the anti-corrosion construction unit must assign special personnel to patrol the site 24 hours a day.