Joke Collection Website - News headlines - Civilized construction management measures on site?
Civilized construction management measures on site?
1. On-site location This content is the responsibility of the foreman of the Engineering Department. Establish a civilized construction responsibility system, divide areas, clarify management personnel, and implement a listing system; within one month of the start of construction, prepare the Beijing Municipal Civilized and Safe Construction Site Implementation Measures for unit projects in accordance with the company's "Beijing Municipal Civilized and Safe Construction Site Management Measures" and report to the company's safety Ministry of Environmental Protection. The traffic roads and pavements within the construction site are all hardened, flat and solid, so that loess is not exposed to the open air. A drainage system will be installed on the road surface, and a dedicated person will be assigned to coordinate the traffic on site and divert the vehicles on site in a timely manner. Scattered debris, garbage and dirt inside and outside the building should be cleaned up in a timely manner. Do not pile materials and debris on stair steps, rest platforms, balconies, etc. The safety net in use must be clean and tidy, and any damage must be repaired or replaced in time. The site and workers' operating surfaces must be clean and tidy, and the site must be clean and tidy after work, and materials must be stacked neatly. Open defecation is strictly prohibited on site. Do a good job in protecting finished products. Avoid long running water and bright lights at the construction site. There are eye-catching warning signs and promotional slogans on site. Each stage of the construction site is consistent with the construction floor plan according to the construction stage. 2. Material management: This work content is the responsibility of the material clerk of the material purchasing department. Establish and improve on-site material management responsibility system, construction site material storage management regulations, on-site warehouse management regulations, material entry and exit inspection and acceptance system, quota requisition system, etc., and conscientiously implement the acceptance, storage, distribution, return and recycling of materials, etc. Procedures, establish and improve original records and various ledgers. Various materials on site should be uniformly arranged according to the construction plan according to the general contracting site at each stage, neatly classified and stacked in a line, debris and garbage should be cleaned regularly, the site should be kept clean, and material labeling should be clear and accurate. The storage area for materials should be flat and compact, with drainage measures in place. Each subcontracting and construction department must have a person in charge of the responsible area and have clear signs. Necessary protective measures should be taken to prevent rain, moisture, sun, frost, fire, and damage. Valuables, flammable, explosive and toxic items should be stored in a warehouse in a timely manner, with a dedicated warehouse for dedicated management and clear signs. It is strictly prohibited to stack or store bagged materials such as cement or bulk materials such as sand and gravel against the wall. Cement, white ash, etc. must be stored in inventory. The ground where formwork, square timber, steel pipes, steel, steel bars, blocks, etc. are stored should be hardened and the drainage should be smooth. The stacking should be stable and standardized. The height should not exceed 1.5 meters. At least one end should be aligned with one line. The formwork, square timber, steel pipe, etc. Steel, steel bars, cement, lime, etc. are required to be elevated by 25cm. To do a good job in material conservation, we must have technical conservation measures and strict management systems. Material saving measures should be prepared from both technical and on-site management aspects. There is a garbage station at the construction site. Construction waste should be sorted, recycled and removed in a timely manner, and a garbage separation station should be set up at the construction site. 3. Machinery management is the responsibility of the engineering department mechanics. On-site mechanical equipment should be stored at fixed points according to the floor plan. Machinery with oil leakage must be equipped with an oil pan. The on-site machinery department is equipped with operating procedures, management systems and responsibility signs, and has a dedicated person in charge. Operators must abide by the safe operating procedures of the machinery, conduct regular inspections and maintenance of the machinery and keep records. Earnestly implement the handover system for machinery and equipment and keep records of handovers. The safety protection devices for machinery and equipment at the construction site are guaranteed to be complete, sensitive and reliable. The machinery is clearly marked and numbered, and the safety devices are complete and reliable. There are installation and acceptance procedures for various mechanical equipment, and safe operating procedures and signs of the person in charge of the equipment are hung in obvious places. All machinery is in good and safe operating condition. Operation while sick is strictly prohibited, and maintenance is prohibited during operation. The power supply must be cut off when operators leave the machine or when there is a power outage during operation. The mechanical equipment (owned or leased) used at the construction site shall be managed throughout the entire process of installation and use, with disclosure before installation, acceptance before use, and inspection during use. The operation of mechanical equipment must be ensured by dedicated personnel and certified personnel, strictly implement the job responsibility system, and strictly implement the "cross operation method" of cleaning, lubrication, tightening, adjustment, and anti-corrosion.
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:What is L0G0?
- Next article:What are the forms of clean energy introduced by clean energy industry?
- Related articles
- Differences between Chinese and western anti-epidemic models.
- Planning idea of aviation characteristic town of Jingmen Love Station?
- Outdoor parent-child activity planning
- Activity plan of walking briskly
- Which electric vehicle charging pile is smarter on the market?
- Slogans to prevent smog
- The topic of writing a composition is to care for flowers and plants.
- Many articles summarizing the activities of World Hepatitis Day on 7.28
- Six-letter English words starting with sl
- How many sets of test papers are there for the 2016 National College Entrance Examination Chinese Examination Paper?