Construction organization design of metal curtain wall

Template for Construction Organization Design of Metal Curtain Wall: Chapter I Comprehensive Description

I. Overview of the Project

Project name:

Project location:

Quality standard:

Time limit plan;

Requirements for commencement and completion dates:

Project content:

Two. Compilation description:

This construction organization design is specially prepared for the external eaves curtain wall project of this project, and it is a comprehensive outline for standardizing and guiding curtain wall projects with different structures of this project, from construction preparation to completion acceptance. In order to standardize the whole process of this project from engineering design, material procurement and control, curtain wall product processing and manufacturing, transportation, on-site construction to completion acceptance, advanced production and processing technology and equipment are adopted to produce high-quality products that meet the quality requirements of this project, so that the construction can be organized according to scientific laws, the normal construction order can be established, various construction preparations can be made in time, and the timely supply and use of various building materials, construction machinery and labor force can be ensured. This construction organization design is specially formulated to coordinate the relationship between various related types of work in space arrangement and time arrangement, ensure the smooth progress of construction, complete the construction tasks on time and with good quality, and ensure the engineering quality.

According to the characteristics of curtain wall construction in this project, according to the relevant national codes and regulations, this project has carried out a comprehensive investigation and study from the early stage, and comprehensively considered the early stage preparation from the aspects of design, material procurement plan, production and processing progress, transportation construction preparation, construction technology, curtain wall cleaning, maintenance and after-sales service, and strived to dedicate a boutique curtain wall project with the most advanced and reliable organization, management, design, construction and after-sales service.

Three. Construction management control target

1. Quality objective

According to the company's internal control standards, the construction will be accepted according to the current national standards to ensure that the project quality meets the national excellent acceptance standards.

2. Time limit of project objectives

On-site construction day effective construction day.

The construction period shall meet the requirements of the owner and the general contractor for the overall goal of the construction period. Our company guarantees that the project will enter the site immediately after it meets the construction conditions. Before entering the site, if conditions permit, we will measure and set out as soon as possible, deepen the construction design, purchase materials and process them into semi-finished products, so as to prepare for the construction in the site and ensure that the project is completed on schedule.

3. Security objectives

Safety standards to ensure that major safety accidents are zero.

4. Civilized construction objectives

Strive for "civilized model construction site" and strive to:

1) Civilized construction requires complete temporary facilities, reasonable layout and clean site.

2) Site materials shall be neatly stacked and clearly marked.

3) After the work site is finished, the materials shall be cleaned, and garbage and waste materials shall not be discarded at the work site.

4) Employees are civilized in speech and do not fight.

5) Comply with the general requirements of the general contractor for civilized construction.

5. Service objectives

In line with the principle of customer first, carefully organize the construction and win the trust of the owners with sweat and wisdom.

Four. Construction progress plan (see attached table for details)

1. Construction operation surface

According to the position of curtain wall and the characteristics of each curtain wall, all working faces of curtain wall should be constructed at the same time.

2. Preparation before construction

According to the actual situation of the project and the requirements of the owner, our company promises that the curtain wall site installation time is 30 days, the curtain wall keel and glass will be processed into semi-finished products within 10 days after entering the site, and all kinds of auxiliary materials and weather-resistant glue will be purchased in the warehouse to ensure the normal supply of materials. Therefore, the following preparations must be made before construction:

1) Sign the construction contract as soon as possible after winning the bid, and determine the material varieties and manufacturers, so as to facilitate material procurement.

2) As structural adhesive, weather-resistant adhesive and materials in direct contact with profiles, double-sided adhesive tapes, etc. Compatibility test is required, the test period is 40 days, and the order period of profile, glass and aluminum plate is 15 days, so it is best to sign the construction contract as soon as possible to avoid the influence of material procurement, test period and material processing on the curtain wall construction period.

3. Project construction arrangement

If we win the bid and have the construction conditions, we will immediately arrange the construction team to enter the site for construction. The survey and setting-out team will be responsible for the survey and setting-out work, determine the initial installation position of each construction section, and ensure that the work of each construction section does not interfere with each other.

5. Standards and specifications to be followed in construction.

Technical specification for exterior eaves decoration engineering of building curtain wall DBJ08-56-96

Technical specification for application of architectural glass JGJ 1 13-97

Tender documents and minutes of Q&A meeting of curtain wall project of Baohuagong Bonded Warehouse in Tianjin Airport.

Technical specification for glass curtain wall engineering JGJ 102-2003

Code for quality acceptance of JGJ glass curtain wall engineering/139-200 1

Quality acceptance standard for architectural decoration engineering (GB502 10-200 1)

Joint sealant JC/T882-200 1

Tempered glass and semi-tempered glass for curtain wall GB17841-1999.

Code for fire protection design of buildings GB-200 1

Code for seismic design of buildings GBJ08-9-92

Code for Lightning Protection Design of Buildings (GB50057)

Code for Design of Steel Structures GBJ 17

Classification of physical properties of building curtain wall GB/75225-94

Aluminum alloy building profiles GB/T5237

General specification for anodic oxidation and anodic oxidation film of aluminum and its alloys (GB803 1)

Carbon structural steel GB/T700

Chemical composition of aluminum and aluminum alloy processed products GB/T3 190

Low alloy high strength structural steel GB 1597

Float glass GB 1 16 14

Safety glass building fireproof glass GB15763.5438+0-2005438+0

Silicone building sealant GB/T 14683-93

Continuous hot dip galvanized steel plate GB/T3280-92

Cold rolled stainless steel plate GB/T380-92

Test method for air permeability of building curtain wall GB/T 15226

Test method for wind pressure deformation performance of building curtain wall GB/T 15227

Test method for rainwater permeability of building curtain wall GB/T 15228

Technical requirements for high-quality carbon structural steel GB/T699

Hot Hole Round Steel, Standard Part of Carbon Structural Steel GB/T7 15

Technical requirements for alloy structural steel GB/T3077

High quality structural steel cold-drawn steel GB/T3078

Structural steel with high weatherability GB/T4 17 1

Carbon steel covered electrode GB/T5 1 17

Low alloy steel covered electrode GB/T5 1 18.

Carbon structural steel and low alloy structural steel hot rolled steel sheet and strip GB/T9 12

Carbon structural steel and low alloy structure hot rolled thick steel plate and strip GB/T3274

Mechanical properties of fasteners, bolts, screws and studs GB/T 3098+0

Mechanical properties of fasteners and nuts GB/T3098.2

Mechanical properties of fasteners Stainless steel bolts, screws, studs and nuts GB/T3098.6

The related promises of intransitive verbs to the owners;

In order to show our company's sincerity in bidding for this project, we solemnly promise to the construction of the external eaves curtain wall project of Xishuanghu Project in Donghai County as follows:

A) Quality objective: to reach the excellent acceptance standard according to national specifications.

B) Progress goal: ensure that the cornice decoration project lasts for days, and ensure that the implementation of the whole building construction plan will not be affected by our progress.

C) Safety commitment: put an end to accidents, ensure construction safety and strive for a civilized construction site.

D) If our company wins the specimen project, our company will ensure that a project team with rich construction experience and strong organizational management ability will manage all aspects of the project on behalf of the company, fully implement the project method construction, and at the same time ensure that the project is completed on time and with good quality with a perfect logistics support system.

E) In the construction of this project, unless specified or allowed by the owner, our company will make full use of its own labor force and will never subcontract this project in whole or in part to other construction enterprises. Scientific management, overall arrangement, ensure the progress, adhere to the "safety first, quality first", civilized construction, and ensure the established time limit and quality objectives.

F) The warranty period of this project is two years.

Chapter II Construction Organization

A, the project construction organization

Two. Composition, responsibilities and powers of the project management organization

1. Project Headquarters

8? The project headquarters shall be presided over by the deputy general manager in charge, formulate the project management plan and determine the purpose of project management.

Standards and guidelines, formulate the project quality plan, and ensure that the project runs in accordance with ISO900 1 quality assurance system.

8? Responsible for project contract negotiation, contract signing, contract performance and related matters.

8? 5. Make timely and appropriate project decisions on behalf of the company, mainly including bidding decision, personnel appointment and removal decision, and major

Technical scheme decision, financial work decision, resource allocation decision, construction progress decision, contract change decision, etc.

8? Keep in touch with the owner, supervision company, design institute and general contractor, and coordinate and solve various problems at any time.

Guarantee the interests of the owners.

8? Responsible for coordinating the internal affairs of the company, holding regular coordination meetings and solving the internal problems of the project management department in time.

2. The functions of the project manager

8? Entrusted by the project headquarters, comprehensively manage the project construction process and be fully responsible for the quality, safety, civilized construction, construction period and project cost of the project.

8? 5. To carry out the relevant national, municipal laws, regulations and policies, and implement various management systems of the enterprise;

8? 5. Responsible for the daily work of the project department;

8? 5 according to the construction progress, adjust the capital flow, the supply of materials and equipment, the use of human machinery and other plans.

8? 5. Organize to formulate the responsibilities, authorities and project management rules and regulations of all kinds of managers in the project construction management organization, and supervise them.

Supervise the implementation;

8? 5. Implement the terms of the economic responsibility letter that the deputy project manager is responsible for;

8? 5. Effectively control the construction of engineering projects, implement relevant technical specifications and standards, and actively promote the application of new technologies.

Ensure project quality and construction period, realize safe and civilized production, and strive to improve economic benefits;

8? Plan, organize, direct, coordinate and control the project by using modern management science and new technologies.

Management objectives;

8? 5. Preside over the project construction and quality meeting, and sign the completion report;

8? 5. Organize and guide the production and operation activities of this project, and allocate and manage the production factors such as manpower, funds, materials and machinery and equipment entering the project;

8? 5. Arrange the construction team to ensure the related certificates;

8? 5. Be responsible for setting the project quality objectives and implementing them;

8? 5. Report the work of the project department to the project headquarters and the engineering director, and manage the project according to the relevant regulations of the company;

3. The functions of the chief engineer of the project

8? 5 under the leadership of the project headquarters, responsible for the construction drawing design of this project.

8? Responsible for the technical management of this project, organize the review of major technical schemes, and solve major technical problems in the construction process.

8? 5. Be responsible for technical guidance and monitoring of the whole construction process, supervise the implementation of ISO900 1 quality system, and organize the blue prints.the design of construction and technical disclosure.

8? 5. Preside over the technical meeting of the project and handle the work related to the design change.

8? Maintain regular communication with the owner, design unit and supervision company to ensure that the requirements and instructions of design and supervision are implemented in all types of work.

8? 5. Organize technical backbones to carry out scientific research on key technical problems of this project, and implement processing, fabrication, construction and installation techniques to ensure the smooth progress of construction.

8? 5. Responsible for organizing the inspection of various performance indexes of glass curtain wall.

4. General scheduling function of the project

8? Responsible for organizing and scheduling the personnel, equipment and materials processed in the factory during the production process.

8? Responsible for organizing and scheduling production, under the premise of ensuring quality, fully complete various production tasks such as aluminum profile processing, glass processing, steel structure processing and outsourcing parts processing.

8? 5. Be responsible for ensuring that materials are transported in place in time according to the requirements of construction progress, so as to ensure the construction period.

8? Responsible for the signing, management and performance of foreign processing contracts.

5. Functions of fire safety group

8? Assist in the leadership of safety management, study and implement the principles, policies, decrees and rules and regulations of labor protection and safety production;

8? 5. Participate in reviewing the safety technical measures plan of construction organization design, and be responsible for urging relevant personnel to implement it;

8? 5 Go deep into the construction site for safety inspection, solve the safety problems in production, stop illegal command and operation, and have the right to stop work and rectify when the problem is serious;

8? 5 * * Cooperate with relevant departments to do a good job in safety skills training, assessment and certification of special operations personnel;

8? 5. Carry out safety publicity activities, summarize and popularize advanced experience in safety production, and conduct safety education for employees;

8? 5. Carry out fire prevention education, improve employees' fire prevention awareness and take effective fire prevention measures.

8? Equip and manage fire prevention facilities, and immediately take emergency measures and report to relevant departments in case of danger.

6. Functions of Engineering Technology Group

8? 5. Be responsible for the technical management of the project, complete the production process and installation process of this project, all kinds of tests and acceptance work, as well as the technical document processing of design, supervision and general contracting.