Which department should I report to for bad construction projects?
Construction sites often have slogans, safety first, quality first, etc. The importance of project quality is self-evident. Unsatisfactory project quality will cause huge personal and property losses. If the quality of engineering products does not meet certain specified requirements, it is called unqualified quality. When there is a problem with substandard project quality, it must be reported promptly and the project rebuilt, etc. How should one report it?
1. How to report project quality issues
The ways to report project quality include letters, phone calls, visits, etc. Among these complaint methods, the parties concerned must make it clear that they want to report What are the contents of the project, including location, number of floors, nature of the project, quality, structure type, area, start and completion date, etc. It should be noted that when reporting, you must bring samples with quality problems so that you can intuitively Solve project problems.
The construction administrative departments of local people's governments at or above the county level shall supervise and manage the quality of construction projects within their respective administrative regions. The transportation, water conservancy and other relevant departments of the local people's governments at or above the county level are responsible for the supervision and management of the quality of professional construction projects within their respective administrative regions within the scope of their respective responsibilities. Therefore, the quality of the project violated the national mandatory standards and a complaint was made to the construction administrative department of the local people's government.
2. Consequences of unqualified project quality
1. The construction unit shall be responsible for repairs of construction projects that have quality problems during construction or construction projects that fail to pass the completion acceptance.
2. If a construction unit cuts corners during construction, uses unqualified building materials, building components and equipment, or engages in other behaviors that do not follow engineering design drawings or construction technical standards, it shall be ordered to make corrections. , impose a fine of not less than 2% but not more than 4% of the contract price of the project;
3. If the quality of the construction project does not meet the prescribed quality standards, you will be responsible for rework and repair, and compensate for the losses caused; if the circumstances are serious , ordered to suspend business for rectification, lower the qualification level or revoke the qualification certificate.
3. Treatment of unqualified project quality
1. Repair treatment: When the quality of some parts of the project does not meet the specified specifications, standards or design requirements, there are certain defects Defects that can meet the required quality standards after repair without affecting the functional or appearance requirements can be repaired.
2. Reinforcement treatment: mainly for the treatment of quality defects that endanger the bearing capacity.
3. Rework processing: When the quality defects of the project still cannot meet the specified quality standard requirements after repairing, or there is no possibility of remediation, rework processing must be carried out.
4. Restricted use: When the quality defects of the project cannot be guaranteed to meet the specified use requirements and safety requirements after being repaired according to the repair method, and it is impossible to rework, measures such as structural unloading or Decisions to reduce load and limit usage.
5. No treatment: Although some project quality problems do not meet the specified requirements or standards, they are not serious and have little impact on the use and safety of the project or structure. After analysis, demonstration, and There is no need for special processing after approval by the statutory testing unit and design unit. Generally, the following situations do not require special treatment: those that do not affect the structural safety, production process and usage requirements; quality defects that can be remedied by subsequent processes; those that are qualified by the statutory testing unit; quality defects that occur are not up to standard after testing and identification. It meets the design requirements, but can still meet the structural safety and functional requirements after calculation by the original design unit.
6. Scrap treatment: Projects that have quality accidents must be scrapped if, through analysis or practice, they still cannot meet the specified quality requirements or standards after adopting the above treatment methods.
The quality of construction projects is the primary goal of project construction. Projects with unqualified quality cannot be put into use, otherwise there will be endless troubles. If shabby projects are put into use, it will threaten people's lives and safety, and the floors will tilt. Instability can also endanger public safety.
- Related articles
- What is the function of the senior citizen card?
- 5 cases of creative store celebration event planning plans
- A woman riding a bicycle rides a fairy peach: after riding a bicycle, into the pit Peugeot Jiangge 150' s trip to Tibet.
- Menyuan Rapeseed Flower Cultural Tourism Festival will open on July 9th with event schedule attached
- How to do a good job in community party building, community governance and community construction
- Dear Korean experts, help me translate ~ ~ Please ~
- Accounting staff monthly work summary
- What is the slogan of morning exercises?
- Opening speech of sports meeting
- Slogan of National Safety Education Day