Compared with other regions, there are no special requirements.

Normative materials are enough.

First, the responsibility system for production safety

1, safety production guarantee system

2, departments at all levels, personnel safety production responsibility system

3, safety production responsibility system assessment

4, full-time security officer certificate

5, each type of work safety technology operating procedures

6, the superior file notice, etc.

Second, the safety management objectives

1, safety management objectives

2, security responsibility target decomposition

3. Safety contract

4, safety responsibility target assessment

Third, the construction organization design

1, construction organization design

2, management certificate

3. Safe filing

4. Safety measures

Fourth, safety technical disclosure

1, safety technical disclosure system

2, safety technical disclosure records

Verb (abbreviation for verb) security check

1, safety inspection system

2, the superior department of production safety inspection records

3, regular safety inspection records

Six, safety education

1, safety education system

2, safety education records

3, level 3 safety education records

VII. Activities in security team

1, security team activity system

2. security team activity record

Eight, special operations related certificates

1, special operation management system

2, special operations personnel related certificates

Nine, accident control counter measures

1 accident pre-control measures

2, inductrial injury accident management system

3, inductrial injury accident files,

4. Monthly report of industrial accidents

X. safety sign

1, site safety sign layout

2. Registration of safety signs and slogans

XI。 Foundation pit and formwork

1, foundation pit support scheme

2, template construction scheme

3, template engineering inspection and acceptance records

4. Form removal application form

Twelve, scaffolding and limb protection

1, scaffolding construction scheme

2, limb protection measures

3, scaffolding material sampling records

4, scaffolding disclosure

5, "three treasures and four mouths" inspection and acceptance records

6, scaffolding acceptance inspection records

Thirteen. Building electricity consumption

1, construction electricity organization design

2, construction electricity management system

3, grounding resistance test records

4. Failed to save the trial jump record.

5, electrician maintenance, inspection records

Fourteen, tower cranes and small and medium-sized machinery and equipment

1, tower crane installation and removal scheme

2, tower crane operation procedures

3, tower crane personnel certificates

4, tower crane inspection certificate, certificate, etc.

5, tower crane acceptance record

6, mechanical management system

7, small and medium-sized machinery in acceptance record