What are the specific measures to control dust on the construction site?

1. control points 1. 1 whether the dust control management system of the project department is sound and implemented depends on implementation.

1.2 Whether the funds for dust control are implemented, whether they are earmarked and whether they are allocated and used in time.

1.3 Whether the construction waste cleared at the construction site is cleared and piled up according to the specification requirements.

1.4 When the earthwork enters and exits the construction site, whether the groove edge and wheels of the vehicle are washed clean, and whether the shelter and cleaning work are done well.

1.5 Whether dust-proof measures such as fencing and covering should be taken for materials that are easy to generate dust, such as cement, lime soil, sand and gravel. , piled up in the construction site.

1.6 Whether the equipment liable to generate dust, such as woodworking machinery, on the construction site is placed in a relatively closed operation shed, and whether the generated sawdust and waste materials are cleaned up in time.

1.7 Whether sprinkling water or other dust-proof measures are taken when cleaning the site.

2. Control measures 2. 1 This project has established the environmental responsibility system with the project manager as the first responsible person, and established and improved the dust control leading group and management network (the specific list and network are attached) with the participation of contractors, supervisors, construction units and all labor teams.

2.2 The construction unit shall implement the funds for dust control, and the construction unit shall ensure that the funds for dust control are earmarked (managed by comrades).

2.3 The construction organization design scheme shall be reviewed and signed by the relevant functional departments of the Project Department. After the project department seals and confirms, the chief engineer of the company and the person in charge of the functional department will examine and sign it, and report it to the supervisor for the record.

2.4 Establish the responsibility system and system for dust control, and establish the dust control ledger in stages.

2.5 The dust control measures and commitments of the Project Department shall be publicized in a prominent position around the construction site.

2.6 Designate comrades to be responsible for dust control management on the construction site, and establish dust control files, work summary, implementation plan, meeting minutes, publicity materials, etc.

2.7 educate and publicize the knowledge and importance of environmental protection and dust control for all personnel involved in the construction of this project.

2.8 Decompose and implement the responsibility of dust control, that is, the project manager → on-site construction director → on-site dust control director → the length of each construction work piece → the heads of various professional subcontractors, labor subcontractors and ZuoYeDui → workers, so as to implement and control the dust control system in this site layer by layer.

2.9 According to relevant regulations, the fence around the construction site should be set at a height of not less than 3 meters, made of red bricks, painted with cement mortar, then painted with white paint, and slogans such as environmental protection should be written in red font on the fence.

2. 10 temporary enclosure facilities shall be no less than 2m, and shall be firmly made of colored steel plates.

2. 1 1 The frontage working surface and temporary residential area are fully enclosed with green dense mesh safety net.

2. 12 The main roads on the construction site shall be paved with reinforced concrete pavement with a thickness of not less than 20cm, and the ground surface of the site shall be hardened. If it is not hardened due to construction reasons, it should be covered with melon seeds or green nets so that the soil is not exposed.

2. 13 Materials that are easy to generate dust, such as cement, piled up on the construction site should be closed for management, and bare materials are not allowed to be piled up. Lime soil and sandstone should be reliably enclosed and covered with green dense mesh at any time.

2. 14 If the construction waste and engineering muck cannot be removed from the site within 24 hours, a temporary storage yard shall be set up, and dust-proof measures such as enclosure, covering and heat preservation shall be taken around the storage yard.

2. 15 bulk materials and construction waste should be cleaned up and transported in a sealed way when it is more than 6m3, and construction waste and engineering dregs cleaned up on the construction site should be cleaned up and transported in bags or sealed ways.

2. 16 If there is any vacant land on the construction site that has been idle for more than three months, the exposed ground shall be temporarily afforested or covered with green nets.

2. 17 Before the transport vehicle leaves the construction site, the groove edge and wheels of the vehicle must be washed clean with high-pressure water gun equipment, and dust-proof measures such as enclosure and covering should be taken. It is forbidden to use compressed air to clean the soil on vehicles and the ground.

2. 18 The construction sewage and mud on the construction site must be discharged after being settled by the tertiary sedimentation tank, and the special person shall be responsible for regular cleaning.

2. 19 When cleaning construction waste or waste materials such as floors, scaffolding, high-rise platforms, equipment and other materials, water spraying and dust absorption measures shall be taken. It is forbidden to use methods such as turning bamboo basketry, beating with a spatula, and blowing dust with an air compressor. It is forbidden to dump the floor directly when cleaning up the floor garbage and throwing it at high altitude.

2.20 All commercial concrete, commercial mortar and dry powder mortar are used in this project. A small amount of concrete and mortar below 30m3 can be stirred by itself, but practical dust-proof measures must be taken.

2.2 1 within 30 days after the completion of the project, level the site and surrounding areas, remove the accumulated soil and sundries, and temporarily afforest or cover the exposed ground with a green net.

2.22 From the commencement of this project to the completion of the project, dust prevention measures must be taken for the construction work involving dust in this project according to the requirements of this scheme.

2.23 The operation teams and individuals who violate the dust control measures in this scheme will be punished according to the relevant regulations of the company and the project department, and those responsible for adverse effects will be expelled from the construction site of this project and may not be re-employed.