Joke Collection Website - News headlines - Resumption plan after the Spring Festival

Resumption plan after the Spring Festival

The following are two plans for returning to work after the Spring Festival with very different content structures. Welcome to read them.

Plan for resumption of work after the Spring Festival (simple version)

1. We must attach great importance to post-holiday construction safety management and always adhere to the principle of "safety first, prevention first, and comprehensive management". Guidelines, resolutely overcome loose and paralyzing ideas and blind optimism, further implement the safety production responsibilities of all levels and posts, plan and formulate safety work goals and related work plans as early as possible, and strengthen safety production management.

2. We must pay attention to and do a good job in safety education and training for construction workers before resuming work after the holidays. New workers must receive level three education and are not allowed to work without education. In view of the actual situation of a large number of migrant workers entering the construction site after the Spring Festival, a detailed investigation was carried out to determine the age and health status of the workers who entered the site after the Spring Festival. Those who are sick or older and are not suitable for construction should be transferred out of their jobs in a timely manner. Or persuade to quit. To deal with the possible laxity, inattention, and paralysis among workers after the holidays, targeted safety production education and technical briefings must be carried out, and in particular, induction or job transfer training for newly recruited workers and transferred workers must be strengthened. According to regulations, Ensure that all types of construction workers understand the sources of danger in the areas where they are working, and enhance their awareness of self-protection and prevention. Safety production education must be realistic and pragmatic, pay attention to actual results, and keep relevant education and training records. After the Spring Festival, all units should carry out safety education for employees before returning to work after the holiday, in view of the large number of new workers entering the market and the long downtime of equipment and facilities. In particular, they should highlight the "three-level" safety education and "safety" for new workers. Carry out training and other work to improve the safety awareness and safety skills of employees;

3. Before resuming work after the holiday, the company’s safety director should work with the construction and supervision units to inspect various safety protection facilities and mechanical equipment at the construction site A comprehensive and detailed resumption inspection will be conducted to eliminate hidden dangers. Safety inspections must be truthful and pragmatic, without formality, without going through the motions, and without missing any detail. The focus of the inspection:

First, the safety status and operation of the metal structure connections, safety protection devices and electrical lines of construction machinery and equipment such as tower cranes, construction lifts, and attached lifting scaffolds;

The second is the pit wall support and drainage measures for deep foundation pit projects, the deformation of the soil around the pit and the surrounding environment, and the buildings (structures);

The third is the analysis of more dangerous areas The management status of some projects;

The fourth is whether the temporary power wires are soaked in water, aged, or leaking electricity;

The fifth is the connection parts and stability of the scaffolding, external power protection frame, and formwork support system

Sixth, whether on-site fire prevention, anti-freeze, and anti-slip measures are in place, whether the heating equipment in the staff dormitories has measures to prevent carbon monoxide poisoning, and whether the structure of the temporary dormitories is stable, etc. In particular, for some projects that are highly technical and difficult to detect safety hazards, such as tower cranes, construction lifts, attached lifting scaffolds, and deep foundation pits, professional technicians or inspectors should be entrusted to inspect them and make rectifications according to the proposed requirements.

After the re-examination meets the requirements, the resumption notice must be signed and issued by the project chief supervisory engineer before work can be resumed. If the project has not been inspected or failed to pass the inspection, the construction will be suspended. Individual projects that were ordered to make corrections within a time limit due to serious safety hazards before the holiday must first organize efforts to make rectifications, pass the inspection and acceptance by the enterprise's safety management department and on-site supervision, and report to the quality supervision station for verification before work can resume.

Fourth, we must pay attention to and do a good job in doorman management. In view of the frequent entry and exit of construction sites by workers who resume work after the holiday, it is necessary to strengthen construction site guard management, establish personnel entry and exit logs, strictly prevent suspicious persons and vehicles from entering the construction site, and prevent the occurrence of public security and other cases.

Plan for resumption of work after the Spring Festival (detailed version)

In order to strengthen the safety production management at the construction site, ensure safe construction at the construction site, and eliminate various safety hazards, special Develop a resumption inspection plan and conduct a comprehensive inspection of the project before resumption according to the "Resumption Inspection Plan".

The construction location of the second phase of affordable housing and supporting low-rent housing in the eastern district of Pingluo County is on the east side of the east ring road of the county planning and on the north side of the extension of Tuanjie East Road. The structure is a six-story brick-concrete structure. The construction area is 43574.22㎡.

1. Inspection content

1. Carry out inspections on safe production conditions for resumption of work after the holiday;

2. Strengthen resumption inspections of key links and key parts;

3. Actively carry out safety production education and training activities;

4. Conduct a comprehensive and in-depth inspection of the construction site: civilized construction, construction electricity, safety protection, scaffolding, Check the implementation of formwork, lifting equipment, construction machinery, labor protection, etc.

2. Work objectives

The inspection requires comprehensive, in-depth and detailed inspections. Safety production safeguard measures must be sound, strictly follow the construction safety production technical regulations and standards, thoroughly investigate and manage hidden dangers of accidents, solve existing problems in safety management, and effectively prevent and resolutely curb the occurrence of accidents.

3. Work requirements

1. Raise awareness and organize carefully

It is necessary to fully understand that resumption inspection work is the basic prerequisite and strong guarantee for safe production. The project department It is necessary to combine the own production characteristics and safety production conditions, carefully organize and formulate specific implementation plans, clarify work goals, and make the work detailed, thorough and practical.

2. Strengthen leadership and implement responsibilities

It is necessary to improve the understanding of safe production when resuming work, always adhere to the policy of "safety first, prevention first, comprehensive management", and resolutely overcome blindness We should be optimistic and paralyzed with lax thoughts, and effectively strengthen the safety production work in resuming work after the holidays. Project management personnel should be in place in a timely manner and carefully prepare for the resumption of work at the construction site: ensure that someone is responsible for safety work, safety measures are implemented in place, and safety inspections are comprehensive and meticulous. The project manager is the first person responsible for the project. He must give full play to his enthusiasm and initiative, improve rules and regulations, formulate measures, and implement safety production responsibilities in place.

3. The project department is responsible for this inspection

The project department must ensure that no blind spots are left in the inspection and no future troubles are left in the rectification for this post-holiday resumption inspection; intensify work efforts, Investigations must be recorded, hidden dangers must be documented, and rectification measures must be taken to resolutely curb the occurrence of construction safety production accidents.

4. Strengthen safety training and entry safety education before resumption of work

First, we must conscientiously implement three-level safety education, and organize all personnel at the construction site to conduct centralized safety knowledge education and training before resumption of work. Emphasize the safety precautions after resumption of work, and strive to improve the self-protection awareness of employees. Especially for migrant workers who have newly entered the site after the holidays and transferred to other posts, they must undergo pre-job operational safety training. Those who have not been trained and have failed the third-level safety education , are not allowed to work on duty.

The second is to strengthen safety technical communication and safety education and training. Before the construction of a construction project, the technical personnel responsible for project management of the construction unit shall make a detailed explanation of the technical requirements for safe construction to the construction work team and operators, and have both parties sign and confirm.

The third is to strictly implement the system of working with certificates for special types of workers. Personnel without special operation certificates or expired certificates are not allowed to work, effectively reducing safety hazards from the source and ensuring safe production after the holiday. unfolded smoothly.

5. Formulate a resumption inspection plan and implement the main responsibilities of all parties

Based on the characteristics and construction progress of the construction project, formulate a detailed resumption inspection plan. The person in charge of the construction unit and the project manager You must arrange and inspect it yourself.

Strengthen safety inspections before resuming work in a targeted manner. The inspections must be careful and meticulous, and avoid going through the motions or playing around. For safety hazards discovered during inspections, corrective measures, responsibilities, funds, time limits and plans must be in place to effectively eliminate safety hazards.

6. Strengthen inspections of key parts and key links of projects under construction

First, strengthen safety inspections of tower cranes and other construction lifting machinery and equipment. All types of machinery and equipment on site should be comprehensively inspected, and repairs, maintenance and trial operations should be carried out to ensure safety before they can be put into use.

The second is to strengthen the implementation of the special plan preparation and review system and the safety technical disclosure system for some projects with greater risks.

The third is to strengthen fire safety inspections at construction sites. Focus on checking whether the safety measures are in place at the construction site's woodworking production sites, electrical welding and cutting sites, lumber yards and flammable and explosive goods warehouses. Anything that does not meet fire safety requirements or poses a safety hazard should be rectified immediately.

The fourth is to strengthen the safety inspection of electricity during construction. All accessories in the on-site distribution box and distribution lines should be comprehensively inspected one by one, and any damage or failure should be replaced in time. Fifth, in view of the impact of early rainy days, comprehensive inspections of edge protection, temporary buildings, protective sheds, fences, etc. should be conducted one by one to eliminate potential safety hazards at the construction site in a timely manner.

IV. Work progress

The construction unit, supervision unit, and construction unit *** jointly formed an inspection team to inspect the construction site of this project. During the inspection, a "Hidden Hazard Rectification Notice" was issued to the detected safety hazards, requiring the project department to make rectifications within a time limit, and the rectification of each safety hazard was completed and passed the re-inspection.

In terms of electricity consumption: The project department will conduct a comprehensive inspection of the construction electricity in accordance with the requirements of the three-phase five-wire system. The temporary electricity manager and safety personnel of the project department will conduct inspections of the living area, site and project department dormitories. Carry out one-by-one investigations and promptly correct the phenomenon of private connections that do not meet the official electricity requirements. The power switch and control box check locks are valid, and there is a dedicated person in charge on site.

Mechanical aspects: Check that the mechanical safety devices of the tower crane, steel bar factory, and carpentry room used on the construction site meet the usage requirements, that the tower crane limit is reliable, and that the wire ropes and hooks are not damaged or deformed. A trial run should be carried out before official use. . Various small machinery and handheld electric devices are well insulated and have no leakage.

On-site safety protection: Detailed inspection of the buckles, scaffolding boards, and buckle safety of the scaffolding that has been erected on site, as well as the safety nets and dense-mesh nets in the containment measures are complete and there are no blind spots, and any debris should be reported promptly Clean up. Check that measures to prevent falls from heights are effective.

Fire protection: Inspect all fire protection equipment, replace expired and ineffective fire protection equipment, and inspect fire hydrants, hoses, fire racks, and fire boxes one by one.

Construction site: Check to ensure that water, electricity, roads and drainage are unobstructed. After the efforts of all parties, the preparation work has been completed as follows:

1. The seasonal temperature has met the construction requirements and the construction quality can be guaranteed;

2. The safe and civilized construction has been rectified;

3. Project information, plans and other documents are complete;

4. All on-site mechanical equipment is in place and has been maintained and inspected.

In terms of personnel: conduct safety re-education for new workers entering the site, carry out safety briefings on construction projects after the new year, require special work types to work with certificates, and check that construction personnel have complete and effective personal safety protection equipment.

My project department inspected the following points at the construction site:

1. Machinery safety and on-site environmental protection:

1. The construction site is not covered by green network Comprehensive and timely rectification.

2. Temporary power use:

1. The temporary power lines are normal, the "four one" is achieved, and the equipment is qualified.

2. Some of the secondary boxes on site were not locked and have been rectified to meet the standards.

3. Safety:

1. In border protection, some green nets were blown open by the wind and did not recover in time, but were closed in time.

2. The edge openings are well protected.

IV. Firefighting:

1. Some fire extinguishers at the construction site failed, but they have been replaced and passed.

2. The insulation measures for fire water pipes were not in place in some cases, but they have been insulated and passed the re-inspection.

3. Some construction water pipes are frozen and cracked, and they should be rectified in time.

5. Entrance education:

Educate new workers entering the site, keep education records, and the education rate is 100

All safety project inspections are carried out by the project safety department The department took the lead in organizing and setting up an inspection team, and relevant personnel from each labor service unit cooperated in the implementation.

On-site safety conditions are good: the general contractor carefully inspected, improved, and rectified the safety status of each construction site. Major machinery such as tower cranes, electric welders, mixers, etc. have been debugged and are running well; the stability of the scaffolding foundation and attached wall ties have been inspected one by one; the safety net has been repaired or replaced; the temporary wire box is intact and grounded ; Cave entrances and edge protection have also been reinforced.

The conditions for on-site resumption of work have been met: the on-site garbage has been cleaned up, the construction channels have been smoothed, water and electricity have been connected, sufficient materials have been prepared, the machinery and tools are in good condition, and the food and accommodation for the construction workers have been properly arranged.

Carry out total quality management activities: each process must be "modelled", and achieve "planning beforehand, control during the process, and guarantee afterward" to ensure that every process is of high quality. They are all high-quality products, and high-quality projects are built with high-quality processes.

Further strengthen safety management, resolutely prevent the occurrence of major casualties and fire accidents, and strive to build this construction site into a civilized construction site in Pingluo County.

Scientifically and rationally formulate construction progress plans, ensure sufficient manpower, materials, and equipment, create conditions for organizing cross-operations in process arrangements, seize key nodes and not relax, work overtime, and complete tasks with quality and quantity.

5. On-site management personnel and employees are in place

1. All project management personnel of this project have arrived.

This project is currently mainly carrying out the main construction, and the construction workers who have arrived can basically meet the current construction needs of the project.

2. Safety education and system inspections

After inspection, the safety inspection system has been established and all safety ledgers have been collected. All emergency plans are complete, all operating procedures are in good condition, and inspection records of all mechanical equipment, temporary electricity, and fire-fighting equipment are complete. All special operations personnel involved in each process and mechanical operation must hold certificates and undergo inspections in accordance with regulations.

Our project department has conducted three-level safety education training and safety technical briefing for new employees after the new year on March 20, and signed a safety responsibility letter with each team leader. The statistical work of new special operations personnel after the holiday has basically been completed, and the application process for special operations personnel is in progress.

3. Production safety situation

The project department inspected the production safety on site and in the staff dormitories on March 19, and the conditions were good.

The project department re-erected some of the temporary power lines that were removed before the Spring Festival, inspected the third-level distribution box, the second-level leakage protection switch, etc., and removed some of the wires that were connected and pulled indiscriminately. , the temporary power use on site complies with the temporary power use regulations. During the centralized inspection of temporary electricity use in the staff dormitories, no illegal electrical equipment such as electric blankets, water heaters, and electric woks were found, and the electricity used in the dormitories complied with electricity regulations.

The project department replaced the fire extinguisher with insufficient air pressure found during the inspection of fire protection equipment, and reconfigured the on-site fire extinguisher to basically meet the construction fire protection requirements.

4. On-site civilized construction conditions

The project department has established a full-time civilized construction team to be responsible for the daily cleaning of the on-site enclosure and the repair and replacement of damaged enclosures.

5. Operation status of construction machinery and equipment

There are currently 7 tower cranes and 3 log saws at the construction site. The project department conducted a trial operation on March 15. Each system Operation is normal.

Related reading: