Joke Collection Website - News headlines - Scaffolding requirements for capping beam construction

Scaffolding requirements for capping beam construction

Scaffolding part and bearing support of capping beam construction must be set separately. Construction scaffolding generally adopts double-row floor-standing scaffolding, and a working channel with a width of about 1m is set on both sides of the bottom die. The inside and outside of the working channel must be provided with edge protection and closed with dense mesh safety net. For the capping beam with higher height, the scaffold should be provided with multi-layer operation channels accordingly. Ensure that the protective height of scaffolding is higher than the working channel surface1.2m..

Set separately

Scaffolding part and bearing support of capping beam construction must be set separately.

Double-row landing scaffold

Construction scaffolding generally adopts double rows of landing scaffolding, and a working channel with a width of about 1m is set on both sides of the bottom die.

♂? Border protection

The inside and outside of the working channel must be provided with edge protection and closed with dense mesh safety net.

Multilayer working channel

For the capping beam with higher height, the scaffold should be provided with multi-layer operation channels accordingly.

It is forbidden to dismantle the fence.

When lifting the top formwork and reinforcement, it is forbidden to dismantle the protective pole of the scaffold at will.

Reliable grounding

Scaffolding must be reliably grounded.

Acceptance and listing

Scaffolds that have been erected must be qualified and listed before they can be put into use.