About warehouse kanban

I don't know if you have ever been exposed to the work related to graphic design in book management bookshelves. If you have, it will be much easier. Generally, warehouse kanban is like a navigator, which gives directions to people. It is equivalent to designing a floor plan for the warehouse (the floor plan that you can see as soon as you enter a government agency or hospital, which will show the departments of each floor). Warehouse kanban is mainly reflected in:

1. Regional planning, first of all, you have to divide all the materials into several large pieces; For example, raw material area, daily consumable area, tool area, semi-finished product area, etc., are classified according to the actual materials of the factory;

2. Each major category is further divided into sub-categories, such as: what are the main materials contained in raw materials? Kanban should show those materials that need to be used frequently, so there is no need to show some small by-products.

3. Your kanban should correspond to the signs of warehouse site management, and there should be a signboard on each shelf, which will reduce your own workload and standardize management. It is also the 6S management mentioned in management.

I hope my answer can help you.

Supplementary answer:

Title: Schematic diagram of warehouse material classification management plan

Steps:

1. First, make the warehouse site arrangement plan (basically in place), divide it into 3 to 5 categories according to the number of hasty materials, and mark off areas on the floor; Divide large areas into sub-categories, and pay attention to leaving 1-1.2 meters of fire exits between each large area;

2. After the shelves are classified according to the regions, the shelves are placed according to the material requirements (how many shelves are needed in each region), and then the names of the materials placed on this shelf are marked on the shelves. Each material is placed separately and marked one by one!

3, according to the site arrangement in place, hand-drawn floor plan, floor plan shows the material area (including fire exits), and then made by computer or hand on the whiteboard, it is best to mark each area separately with different colors.

if you still don't know how to do it, you might as well ask me to do it for you, hehe!