Joke Collection Website - News headlines - What is the physical supervision of production safety at engineering construction sites?
What is the physical supervision of production safety at engineering construction sites?
1. The method and content of the physical supervision of production safety at the construction site
Our station combines inspections with key inspections for the physical supervision of production safety at the construction site, and conducts comprehensive inspections on the construction site. The orientation and the whole process are scored in accordance with JGJ59-99 "Safety Inspection Standards for Construction". The focus of supervision and inspection is:
1) Safety management: Supervise and inspect whether the safety assurance system is established and implemented, and various safety production The implementation of the management system on site and the filing of safety management data.
2) Scaffolding:
(1) Approval of construction plan, disclosure before erection, acceptance after erection;
(2) Steel pipes, fasteners, etc. Material;
(3) Pole foundation, the tie between the frame and the building;
(4) The setting, erection, spacing and scissor braces of each pole;
(5) Scaffolding boards, protective railings and closure within the frame;
(6) Unloading platform, channel;
(7) Attached lifting Scaffolding must be erected and used in accordance with the Ministry of Construction's "Interim Regulations on the Management of Attached Lifting Scaffolding in Construction".
3) Foundation pit support:
(1) The construction plan has targeted and operable procedures for approval;
(2) Pit wall support And its monitoring, pit edge load;
(3) Edge protection, personnel access, drainage measures;
(4) Earth excavation, operating environment.
4) Formwork project:
(1) The construction plan has targeted safety measures, approval and acceptance procedures;
(2) Whether the support system is in accordance with Plan erection;
(3) Construction load control;
(4) Formwork storage and removal methods, and operating environment.
5) "Three Treasures" and hole edge protection:
(1) The quality of the "Three Treasures" (safety helmet, safety net, and safety belt) meets the standards and is used correctly;
p>
(2) The protective facilities at the edge of the cave (staircases, elevator shafts, reserved openings, passageways and edges) are standardized and tooled.
6) Construction electricity:
(1) Power distribution device meets standards;
(2) Grounding and zero protection system;
(3) Three-level power distribution, two-level protection, one machine, one gate, one leakage box;
(4) Power lighting, distribution lines, safety voltage;
(5) Electricity consumption files.
7) Material hoist (gantry frame, tic-tac-toe frame):
(1) frame body production, frame body stabilization, hanging basket;
( 2) Limit safety device;
(3) Wire rope and transmission system;
(4) Floor unloading platform protection;
(5) Installation acceptance , contact signal.
8) External elevator: (Elevator for people and goods)
(1) Acceptance certificate and operation certificate;
(2) Ground entrance and exit, floor Protection of the discharge port;
(3) Safety devices, load control, frame stability, contact signals;
(4) Installation and disassembly plans, acceptance procedures, repair and maintenance Records;
(5) Electrical safety and lightning protection devices.
9) Tower crane:
(1) Acceptance certificate and operation certificate;
(2) Safety devices, including torque limiter and ultra-high limiter limiter, luffing limiter, traveling limiter, co-rotation limiter, hook pawl and winch drum safety device, etc.
(3) Wall-attached device and tower body stability.
(4) Command and operation, contact signals;
(5) Installation and disassembly plans, acceptance, inspection, and maintenance records;
(6) Electrical safety and safety in multi-tower operations.
10) Construction machinery:
(1) Installation and acceptance procedures;
(2) Safety protection devices of machinery;
(3) Electrical safety, protect the neutral line connection and use of leakage protector.
11) Lifting and hoisting:
(1) Construction plan and approval procedures;
(2) Safety status of lifting machinery and safety of lifting operations Key points;
(3) Operator certification status;
(4) Protection for lifting operations at high altitudes.
12) High-altitude operation projects: including edge operations, hole operations and independent suspended operations.
(1) The main protection for edge operations is to set up protective railings. The railings should be composed of upper and lower horizontal bars and railing posts. The height of the crossbar from the ground is 1.0-1.2M for the upper bar and 0.5-0.6M for the lower bar. The railing pole should be able to withstand an external force of 1KN from any direction. Safety doors should be installed.
(2) When operating at the entrance, solid covers, protective railings, dense safety nets or other anti-fall facilities must be installed depending on the specific circumstances.
(3) At the construction site, when working in the open air with a height of 2M and above, firm footholds such as operating platforms, scaffolding or hanging baskets must be set up before construction can begin.
(4) When up and down operations are performed simultaneously in the same vertical direction to form cross operations, a safety protection layer must be installed in the middle.
(5) Safety helmets, full belts and safety nets should be used correctly.
13) Civilized construction:
(1) On-site fencing: the height, stability, cleanliness and beauty of the fencing;
(2) Closed management: gate and door signs and doorman management;
(3) Construction site: roads are hardened, smooth, and have drainage measures;
(4) Material stacking: stacked neatly according to the plan and marked with classification ;
(5) On-site accommodation: separate from the operation area, and the dormitory meets sanitary requirements;
(6) On-site fire prevention: there are systems, measures, and facilities;
(7) On-site signage: There are standardized and neat signboards, safety slogans, publicity boards, etc.;
(8) Living facilities: There are canteens, toilets, bathrooms and other facilities, and they meet health requirements;
p>
(9) Health first aid: There is a clinic or health box, and there are first aid health care measures;
(10) Community services: There are people-friendly and convenient measures, and comprehensive public security management.
14) Fire prevention: The construction unit shall establish a fire safety responsibility system at the construction site, determine the person responsible for fire safety, and formulate various fire safety management systems for fire, electricity, and the use of flammable and explosive materials. Operating procedures, set up fire exits, fire water pumps, equipped with fire fighting facilities and fire extinguishing equipment, and set up obvious signs at the entrance to the construction site.
2. Supervision and handling of hidden dangers (accidents) in engineering safety production
1) If during the supervision and inspection it is found that the responsible parties of the project construction have violated the safety production regulations, our station will Issue a "Project Rectification Notice". If the safety production assurance system at the construction site is imperfect, there are many hidden dangers, and supervision and inspection problems are not rectified effectively, or if the safety production behavior of all parties participating in the construction seriously violates laws and regulations, and if the conditions for partial suspension of construction are met and the construction needs to be suspended, the construction shall be suspended in accordance with the regulations. Requirements and procedures, issue a "Notice of Partial Suspension (Suspension) of the Project", etc., and order corrections. For projects that have been partially suspended (suspended), before resuming work, the responsible unit should fill in the "Rectification Completion Report". If the review meets the requirements, the quality supervision station will issue a "Resumption Notice". Our station will record, regularly summarize, and disclose to the public any bad behaviors discovered by responsible entities and relevant institutions during supervision and inspection. If the safety production behavior of each responsible entity constitutes a violation of laws or regulations and requires administrative penalties, it shall be reported to the superior construction administrative department for administrative penalties.
2) Disclosure and tracking rectification system for major construction safety hazards.
Major hazard sources at the construction site include: major hazard sources at the construction site and major hazard sources in the areas surrounding the construction site. During the supervision process, a general survey and registration of major hazard sources in construction projects will be carried out to understand the number and distribution of major hazard sources, and the list of major hazard sources in construction projects, rectification measures and management status will be regularly announced to the public.
3) Interview system for major construction project safety accidents (accident hazards).
For projects where serious accidents occur, or projects where the safety production guarantee system at the construction site is imperfect, there are many hidden dangers of major accidents, and supervision and inspection problems are not rectified effectively, or the safety of the parties participating in the construction is responsible For projects with serious illegal or illegal production activities, the site manager of our station will interview and admonish the responsible persons of the construction units and other relevant responsible entities of the above-mentioned projects, and the records of the interviews and admonitions will be made public to the public and reported to the superior construction administration. competent authority.
4) If serious injuries, deaths, mechanical equipment and other major accidents occur during the construction process, they should be reported to our station and the relevant competent authorities within the specified time, and the site should be protected. Late reports, concealed reports, Those who damage the accident scene will be punished according to relevant regulations.
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:What are the ancient poems about Oracle Bone Inscriptions?
- Next article:Lantern Festival theme name eight words
- Related articles
- Sixty slogan sentences calling on everyone to pay attention to garbage classification are summarized
- 212 classic advertising language daquan
- Basic terms of UAV
- Who is responsible for water leakage in hotel shower room?
- Will the traffic police check the truck sticker?
- Slogans for rural and township cultural construction
- Children dance, China culture and praise string words
- Activities in various parks in Yantai during the Spring Festival-Lantern Festival
- Usage of full flip and partial flip
- Sun marriage certificate issued a circle of friends sentence clean literary short sentence official statement certificate short sentence