I. Basis and scope of compilation:
(1) compilation basis
1, Technical Specification for Design and Construction of Expressway Traffic Safety Facilities (JTJ74-94)
2. Technical Specification for Highway Engineering Construction Safety (JTJ76-95)
3. Design documents of the 10th contract section of Yantian Port Branch Line of Shenzhen Ji-He Expressway
4. Relevant national, provincial and municipal safety laws and regulations
(2) Compilation scope:
Pile Foundation of Yantian Road Overpass Bridge and Yong 'an South Road Overpass Bridge in 10th Contract Section (K 1+500 ~ K2+450) of Yantian Port Branch Project of Ji-He Expressway.
Second, the project overview:
Yantian Road Flyover Bridge and Yong 'an South Road Flyover Bridge are located in Yantian Port, with the starting and ending pile numbers of K1+582.492 ~ K1+927.495, the center pile number of K 1+740, the total length of the bridge is 345.003 meters, and the span is 4x 30+(30+40 Bridge section: (0.5m+ net19.75m+0.5m) x2; Seismic intensity: designed according to seven degrees and fortified according to eight degrees.
Third, the preparation of the program:
Causes of safety accidents
The main causes of safety accidents in pile foundation construction are as follows:
(1) falling objects on the ground or at high altitude
(2) Power consumption
There is something wrong with the lifting tool.
(4) lifting tools and muck fall off.
⑤ Blasting
(6) Poisonous gas in the pile hole leads to suffocation.
In view of the above safety accidents, our department has formulated the following safety construction regulations and taken necessary measures.
(2) Safety construction measures:
First of all, we must strictly implement the relevant provisions of Technical Specification for Highway Engineering Construction Safety (JTJ076-95) and take the following measures:
(1) Workers engaged in pile excavation should choose strong young men, who must undergo safety operation training such as health examination, underground, high altitude, electricity utilization, hoisting and simple mechanical operation, and can only enter the construction site after passing the examination.
(2) Before the blue prints.the design construction drawings and pile hole excavation, carefully study the geological data, pay attention to possible quicksand, piping, water gushing and harmful gases, and formulate targeted protective measures. If you have any questions about safety construction, report them to the relevant units in time.
(3) During the construction of pile hole excavation, firstly investigate the changes of the ground and adjacent slopes. When the pile hole construction platform is close to the slope, it is necessary to reinforce the slope, remove the boulder on the slope, and set intercepting ditch and safety net on the upper side to prevent the rainwater from soaking the slope and the boulder from rolling down. The excavated earthwork should be shipped out in time. Mud and sundries shall not be piled up within 2m around the orifice. In order to prevent people and things on the ground from falling into the pile hole, guardrails and safety nets must be set around the pile hole (except where the wellhead is dug). Aperture cooperation personnel should concentrate on closely monitoring the situation in the hole, actively cooperate with the personnel in the hole, and never leave their posts during construction. When passing tools and articles up and down in the cave, it is forbidden to throw them; Strictly prevent orifice objects from falling into pile holes.
(4) The installation and removal of all power supplies and electrical appliances on the construction site must be operated by certified electricians; Electrical appliances must be strictly grounded and connected to zero, and leakage protectors should be used. Switch box and power distribution room are special, with rain-proof box cover and canopy, and equipped with fire-fighting facilities. Electrical equipment must have a certificate of approval before it can be used after installation.
(5) All the equipment, facilities, devices, tools, accessories and personal labor protection articles on the construction site must be inspected frequently to ensure their intact and safe use. The electric hoist and slag bucket (hanging cage) used by workers and staff to go up and down the pile hole must be qualified mechanical equipment, equipped with automatic locking safety devices, and fastened with safety ropes and safety belts to prevent sudden power failure. Please do not use artificial rope to transport people or step on the pile hole under the flange of retaining wall. Electric hoist adopts push-button switch, and special personnel are arranged for strict inspection before and after work, and sufficient lubricating oil is added every day to ensure flexible and accurate switch; The chain is free from damage, safety buckle and deadlock; Wire rope without broken wires. The support should be stable and firm, and its safety lifting ability should be tested before use. A ladder or safety rope and ventilation pipe must be placed in the pile hole. With the increase of excavation depth, the ladder or safety rope and ventilation pipe will extend to the working face as an emergency standby. Hoisting equipment must be qualified, and can only be installed and used after inspection.
(6) The steel wire rope and pulley for transporting construction dregs shall be installed firmly, and the steel wire rope for transportation shall be no less than (14 mm) and the pulling force shall be no less than 10KN. Before use, tensile test should be carried out, and lubricating oil should be coated every time to reduce the friction between steel wire and pulley. Wire rope should be tested for tension frequently, and it should be replaced immediately if it is unqualified. If the wire rope is depilated or slippery, it should be replaced immediately; The diameter of the slag bucket shall not be greater than half of the pile diameter and the height shall not be greater than1m. The earrings of the slag bucket shall be welded firmly, the hook shall have anti-slip insurance, and shall be fastened with steel wire rope, and can be used only after passing the test. The slag stone in the slag bucket should be placed at the bottom, and the mouth edge should be kept at the height of 10cm to prevent the leakage of muck. When transporting, the starting height should be about 0.5- 1.0m, then stop and transport manually.
(7) Rock blasting in the hole adopts shallow hole loose blasting method; When blasting, experiments should be carried out outside the hole to determine the hole depth, explosive dosage and loose area of different rock strata, and the construction blasting in the hole can be carried out only after the test is qualified. Electric detonators should be used for blasting, and fuses should not be used for initiation; Single-eye blasting is used for blasting, and multi-eye blasting is not allowed. The hole is covered with soil bags, and the wall of the hole is surrounded by formwork and supported and fixed. When blasting, all operators in the hole should remove the blasthole and confirm that there is no one outside the pile hole and near the orifice before blasting; Ventilation and smoke exhaust after blasting in the hole shall be no less than15min, and the air volume shall be no less than 25l/s.
(8) When the excavation depth of the pile hole exceeds 5m, water should be accumulated in the dry pile hole before the construction starts every day, and air should be blown into the hole with a blower or a large fan for 5 minutes to discharge the turbid air in the hole, and toxic gas in the hole should be detected. Generally, instruments should be used for detection, or simple methods should be used; If small animals (such as rabbits or mice) are put into cages, they should be left at the bottom of the pile hole for at least 10 minutes. The staff can only enter the cave after checking that the ecology of small animals is normal. When the depth of the hole exceeds10m, the ground should be equipped with special equipment to supply gas to the hole, and the air volume should not be less than 25l/s, and the air supply should be increased by drilling holes at the bottom of the hole.
(9) The operators in the pile hole shall abide by the following regulations: ① Safety helmet and insulating rubber shoes must be worn; (2) it is forbidden to work after drinking; Smoking is prohibited in the cave; No open flame is allowed in the cave; (3) The hole should be rotated every 4 hours, and the operation with water should be rotated for no more than 2 hours; (4) When excavating complex soil layer, probe the bottom of the hole with a hand drill or a steel bar not less than φ 16mm every 0.5 ~/m, and check whether there are caves and sand gushing below the bottom of the hole. After the safety is confirmed, you can continue to dig; ⑤ Pay close attention to all the dynamics in the hole, and stop the operation immediately and evacuate quickly when finding bad omen such as quicksand, water gushing, deformation of retaining wall and peculiar smell gas; ⑥ When the pile hole is dug below 5m, a semi-circular protective cover, made of steel (wood) plate or dense mesh steel (wire), should be set on the retaining edge about 3m above the hole bottom. When getting up and down the bucket, the operator must stand under the protective cover, stop digging and pay attention to safety; When lifting large stones, all workers in the hole should be evacuated to the ground before lifting; ⑦ Wet drilling should be adopted, and ventilation, dust prevention and personal protection should be strengthened; ⑧ If blasting is carried out in the hole, all operators must evacuate to the ground before initiating; When blasting, the orifice should be stamped; After blasting, the exhaust gas in the hole must be removed by air extraction, air supply or water spraying, and the operation in the hole can only be continued after toxic gas is detected; Pet-name ruby construction midway after pumping, must first cut off the special power supply on the ground, workers can work in the hole.
Four, manual digging pile safety construction matters needing attention:
(1) The site management personnel shall explain the geological conditions and groundwater conditions of the excavated piles carefully to the construction personnel, and put forward possible problems and emergency treatment measures. We should be fully prepared mentally and have enough materials and machinery to take emergency measures. It is necessary to formulate safety measures and regularly check and implement them.
(2) There shall be no more than two people working under the hole. Wear safety helmet and gloves when working, and wear raincoat, rain pants and boots when there is water. An electric bell or walkie-talkie should be placed in the hole to ensure the signal connection between the workers under the hole and the people on the hole. Hammers, hoes, stones and iron bars must not be placed around the ground.
(3) underground personnel should pay attention to observe the change of hole wall. When the retaining wall collapses or cracks, it should be reported in time and support measures should be taken. In case of danger, contact signals should be sent out in time so as to evacuate quickly. And take effective measures to eliminate the danger as soon as possible.
(4) The ground personnel should pay attention to the contact signal under the hole, which is sensitive and quick. Always check whether the brackets, pulleys and ropes are secure. When hoisting, it should be hoisted stably, and the hoisted earthwork should be unloaded at a place 2 meters away from the orifice.
(5) During the construction period, the electrical equipment shall be pumped, illuminated and ventilated. Only one brake and one leakage protector should be equipped. Three-core rubber wires should be used for power supply lines, and the wires should be overhead and not dragged on the ground. And often check whether the wires and leakage protection are in good condition.
(6) When pumping water from the hole, the drain pipe shall be more than 5 meters away from the orifice, and the drainage on the construction site shall be ensured.
(7) Dig the pit on the same day and pour the retaining wall on the same day. When personnel leave the construction site, they should cover the orifice and set warning signs such as warning red light. Before opening the hole cover, remove harmful gas and test it before operation.
(8) Dig a hole with a depth of 6 6- 10/0m, and ventilate at least 1 time every 1 hour, and keep ventilation in the hole with special ventilation equipment above10m.
Five, civilized construction:
(1) Set up a high-quality construction team, constantly strengthen internal management, improve the ideological consciousness of employees, and make all employees realize that this project is not only a local key project with high quality requirements, tight construction period and great construction difficulty, but also attracts attention from all sides and is highly political.
(2) Stimulate workers' enthusiasm for work, strengthen information communication between different types of work, different teams and different posts, and make necessary coordination, so that the construction site is always permeated with the atmosphere of unity, cooperation, equal competition and harmonious coexistence.
(3) Do a good job in construction propaganda and agitation to promote civilized construction on the construction site. The construction site should have fixed construction safety technical slogans, engineering signs and construction progress schedule. Respect the supervision engineer, enthusiastically accept the inspection and guidance of the supervision engineer, and actively report the progress and quality of the project.
(4) Construction wastewater and domestic sewage shall not be discharged into farmland, cultivated land, irrigation canals and reservoirs. It is strictly prohibited to discharge into the quoted water source. During the construction, keep the site clean and tidy, and clean up the construction garbage in time.
(5) The construction machinery should prevent serious oil leakage, and it is strictly forbidden to directly discharge the oil pollution generated in the operation of the machinery without treatment, or directly discharge the oil sewage when maintaining the construction machinery.
(6) Waste land with sparse vegetation should be selected for digging piles to dig out waste residue, and slag dams or walls should be built at the lower part and corners of waste residue to prevent soil erosion. Abandoned slag should try to avoid destroying or burying low trees and farmland.
(7) Strengthen the education of construction personnel to protect natural resources and wild animals and plants, and prohibit poaching and cutting down trees at will.
Six, manual digging pile safety management:
Manual digging pile is a highly dangerous type of work in bridge construction and unpredictable. Then, how to manage the safety of manual digging pile construction. This is a subject that every construction manager must face seriously. In view of the previous manual digging pile foundation construction in our department, the management process is summarized in stages. Overall, the safety management steps of the project department are as follows:
Preparations before construction are ready:
(1) Study the engineering geological exploration report and master the first-hand information.
(2) Prepare the construction scheme of manual digging pile.
(3) Formulate safety protection measures predictably.
(4) Other departments work together, such as mechanical and electrical equipment and materials.
(2) When new workers enter the site, three-level safety education is in place:
(1), presided over by the project manager, provides targeted three-level safety education for new workers in this type of work, so that each worker can master the operating rules and safety precautions of this type of work and make workers clear the basic principle of "production must be safe and safety promotes production".
(2) Send safety knowledge papers for assessment to confirm the effect of safety education, except for special operators.
Members are specially trained and required to hold relevant certificates.
(3) security team technical disclosure in place:
(1) In addition to the pre-shift safety activities organized by the team, the foreman (builder) in charge of this type of work also makes targeted safety technical disclosure to the team in written form and performs the signing formalities.
(2) The full-time safety officer of the project summarizes the contents of educational disclosure and explains them to each member of the team in detail again. Everyone is required to operate, and everyone must abide by the safety discipline, relevant national policies and regulations and the safety management system of the project department.
(four) whether the supervision, inspection, re-education and assessment in the construction process are in place:
(1) During the construction, the safety officer and foreman played a supervisory role, found the young seeds of the accident there, organized personnel to eliminate them in time, and emphasized the prevention of similar incidents from happening again.
(2) During the construction period, in addition to requiring the construction team to carry out routine daily pre-shift self-inspection (mainly checking whether the leakage protector fails, whether the cradle body and rope, safety hook and brake switch are damaged or out of control, whether the submersible pump motor and cable are normal or broken, etc.). ). The safety officer also conducts irregular review and carefully observes the underground operation. The foreman made an original record of the depth of each meter of the operation team, and immediately ordered the team to carry out rectification by personnel, time limit and measures when discovering the hidden danger of the accident, and implemented the rectification content.
(3) Re-educate some workers who have a weak sense of safety during construction.
(4) During the construction period, the operation team shall be assessed once a day, and a reward and punishment system shall be implemented. The main assessment contents are: (1) preventing falling from high places; (2) prevent objects from hitting; (3) Safe power consumption of submersible pump; (4) Proper use of seat belts, helmets, safety ropes and safety hooks; (8) Inspection and acceptance of construction machinery, etc.
(5) Work summary and improvement work in place:
(1) Summarize the overall work through the weekly safety meeting of the project department, draw lessons, define the responsibility objectives, and eliminate the hidden dangers of accidents.
(2) Improve the deficiencies in the work, take effective measures to remedy them, and strengthen prevention.
(3) brainstorm, accept constructive suggestions from all sides and take practical actions.
To sum up, all the staff of our department go all out to formulate safe and applicable safety management scheme and safety protection measures, and resolutely control the safety accidents of pile foundation at 0.
Seven, safety accident emergency treatment preparation measures
(A) Common safety accidents of manual digging piles
(1) falling objects on the ground or at high altitude
(2) Power consumption
There is something wrong with the lifting tool.
(4) lifting tools and muck fall off.
⑤ Blasting
(6) Poisonous gas in the pile hole leads to suffocation.
(2) Preparation measures for emergency treatment of safety accidents
In view of the common safety accidents in this project, which mainly occur in the well, the following measures are taken.
1. rescue tools: the construction wellhead is equipped with safety ropes, artificial cradles, hanging baskets, safety belts, safety helmets, anti-virus appliances, ventilation pipes and tool carts.
2. Set up a safety rescue team: 2-4 young people, site medical staff and full-time site safety officers are selected to form a rescue team, and all construction workers are on standby. Take the safety officer as the leader of the rescue team, and be fully responsible for the rescue work of safety accidents.
3. Rescue:
4. In case of falling injury or wall collapse in the well, contact the upper and lower walkie-talkies to understand the injury, immediately organize personnel to rescue, stop other wellhead operations, dismantle wellhead equipment, place artificial cradles and hanging baskets, put in safety ropes, notify medical staff and vehicles to the wellhead, and notify ambulances to select strong people to go down the well when necessary. On the way down the well, keep in touch at any time and observe whether the surrounding protective wall is in danger of further collapse. If so, emergency protection measures should be taken.
5. When a poisoning accident occurs in the well, immediately stop the operation near the wellhead, transfer the blower and ventilation pipeline near the wellhead to the accident well for ventilation, and immediately organize personnel to wear gas masks to go down the well for rescue. After the personnel are rescued ashore, they will be given artificial respiration by medical staff and sent to the nearest hospital by emergency vehicles.
6. When an electric shock accident occurs in the well, cut off the power supply urgently, organize personnel to rescue the people in the well from the shore, and the medical staff use the standby vehicle to rush to the nearest hospital for emergency treatment.
(3) emergency response plan for safety accidents
In order to do a good job in the emergency treatment of production safety accidents in this pile foundation manual digging project and minimize the loss of life and property caused by dangers and accidents, the following scheme is formulated.
1, accident emergency treatment:
(1) saving lives is above everything else;
(2) the rescue and report at the same time, report step by step. First, after receiving the report, the rescue was carried out nearby;
(3) the local government obeys the overall situation, and the lower level obeys the higher level;
(4) graded responsibility and close cooperation;
(5) Minimize losses and prevent and mitigate secondary losses.
2. All departments of the Project Department can urgently requisition vehicles, equipment and personnel of the Project Department and each construction operation group according to the needs of handling dangerous accidents, and all members of the Project Department and each construction operation group must unconditionally obey the dispatching and requisition. Construction teams and individuals involved in emergency treatment can request appropriate compensation from the project department according to relevant regulations.
3. After the dangerous accident, the person in charge of the operation team and the person in charge of production safety of the project department should immediately rush to the scene of the accident and report to the main leaders of the project department in time. After receiving the dangerous situation, the project department should immediately set up a leading group for handling dangerous situations and accidents, and immediately rush to the scene.
The emergency leading group includes:
⑴ Team leader: the main leader of the project department;
(2) Deputy team leader: safety engineer;
(III) Team members: members of the safety committee of the project department and relevant personnel temporarily appointed.
4, emergency leading group, emergency coordination group main responsibilities:
(a) to carry out the work of the project department, put forward specific measures for emergency treatment, and be responsible for reporting relevant information.
(two) to guide and supervise the emergency handling work, and coordinate and solve major problems in the emergency handling work.
(three) grasp the dynamics of emergency handling, timely adjust and deploy emergency measures.
5. According to the degree of safety accidents, the emergency response leading group shall set up emergency response offices for dangerous accidents, such as on-site rescue group, after-treatment group, communication contact group, logistics support group, operation stability group and cause investigation group, and define the responsible person and contact person.
6. In the emergency treatment, the relevant departments of the parties should be responsible for this work before arriving at the scene.
7. After a dangerous accident, the accident unit shall immediately call for help from the relevant departments and carry out self-help. Other operation groups should actively assist and support when calling for help.
8. communication. The staff of the communication liaison group should adhere to the day and night duty system, make a good record of duty and arrange emergency treatment.
9. On-site rescue. On-site rescue team staff should take the principle of "saving lives above all else" to actively treat casualties, minimize casualties and losses, and do everything possible to prevent and mitigate secondary losses.
10, clean up. The person in charge of the accident should deal with the aftermath as soon as possible. Adopt the method of unified management and decentralized reception, and actively do a good job in the ideological work of all staff. Formulate compensation standards for accident handling in a timely manner according to regulations, and actively do a good job in accident handling compensation.
1 1. Cause investigation. We should do a good job in accident investigation and evidence collection, investigate the scene of the accident, investigate and analyze the reasons, and do a good job in the registration and inspection of its witnesses.
12, logistics support. According to the needs of emergency response, mobilize relevant materials to ensure the urgent need of emergency response and provide all living security for emergency response personnel.
13, stable operation. We should do a good job in ideological stability, maintain the normal order of production, work and life, and ensure the orderly development of daily work.
14, work report. After the emergency treatment, report the emergency treatment in writing step by step. The report must be realistic, and no fraud or concealment of specific details is allowed.
15. According to the actual situation of participating in emergency response and the rescue effect, the project department will allocate reward funds for emergency response of dangerous accidents from the special safety funds, which will be used to reward advanced units and individuals for emergency response.
16. If it is verified that in the emergency response work, people will pass the buck, delay the time limit or lie about the effectiveness of the rescue, informed criticism will be given, and the main person in charge will be held accountable for serious cases; If a crime is constituted, criminal responsibility shall be investigated by judicial organs according to law.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd
- Previous article:Slogans and inscriptions
- Next article:The Deeds of Winners of the May 4th Youth Medal in 222
- Related articles
- What brand of children's basketball shoes is better?
- Advocating simple propaganda words
- Neijiang city construction slogan
Who was shocked by the alternative sprint slogan "Go and study"?
"My day three provinces; Is it high? Rich or not? Handsome? No, go and study! " This is a
- Happy birthday to my father-in-law
- Model essay on the planning scheme of kindergarten food festival (three articles)
- How to write a notice about the addition of hello bicycle storage points
- The theme slogan of the motherland in my heart
- Xingqiong Railway KFC Linkage Slogan
- Work summary of township safety production
- Student Financial Aid Slogan