222 flood control notice model essay (selected 6 articles)
In rainy season and flood season, in order to effectively strengthen the work of production safety in flood season, prevent all kinds of accidents, and ensure the safety of production and the safety of employees' lives and property in flood season. The following is the "222 flood control notice model essay (selected 6 essays)" compiled by me for your reference only. Welcome to read this article. Chapter 1: Notice of Flood Control and Flood Prevention in 222
All departments:
At present, it has entered the rainy season. In order to effectively strengthen the work of safety in production during the flood season and prevent all kinds of accidents, according to the spirit of the instructions of the state, provinces, cities and companies on wind prevention, flood prevention and lightning protection, we will adhere to the principle of "safety first, prevention first, comprehensive management and preparedness", clarify responsibilities and implement measures. The specific work matters are hereby notified as follows:
1. Requirements for flood control, wind protection and lightning protection in the factory area
1. Emergency preparation:
1. All departments should listen to the weather forecast, notice and other information in time to make emergency preparations. (2) The production department should prepare for flood control, set up a flood control team, and check the implementation of flood control materials (sand, bags, shovels, etc.), and be on call in case of flood.
2. Inspection in flood season:
(1) The production department shall conduct self-inspection on its outdoor electrical equipment, pipelines, lines, electricity facilities, etc., and solve the problems before the flood season. Focus on the inspection of leaks and cracks in the walls of houses, report and maintain them in time, and organize personnel to remove silt and accumulated water from drainage pipes;
(2) For the parts that are easily damaged by strong winds and easy to leak rain, we should report them as soon as possible and make a rectification and reinforcement plan. After being approved by the company, we will carry out reinforcement and renovation, so as to enhance the ability to resist strong winds and heavy rains and ensure that there will be no problems in the flood season.
(3) Prepare a standby water pump in the area where water may enter in advance. Once water enters, immediately install a submersible pump to drain water in time. Check the sandbags and drainage pumps in the pump room of water meter verification station to ensure that nothing is lost before the flood season.
(4) all departments should arrange special personnel to check whether the doors and windows are locked and whether the power supply is cut off before coming off work. Prevent fire and water intrusion.
[5] All departments should arrange electricians to check the lightning protection measures in the responsible area according to the situation to ensure that the lightning protection facilities and leakage protection are in good condition.
3. Emergency measures:
In case of flood, you should immediately report to the company office, cut off power and switch off the brake according to the situation, prepare emergency lighting facilities, organize personnel to drain water in time, evacuate personnel, and set warning signs to prevent accidents of electric leakage and personal injury caused by accumulated water.
4. Personnel education:
All departments can train employees on flood control knowledge according to the actual situation, and make clear the preventive measures for key parts and the measures to be taken in case of emergency.
2. Requirements for flood control on the construction site
1. Requirements for electricity consumption in flood season:
(1) In case of rain, the stacked materials on the construction work surface must be covered tightly with rain-proof materials, and the wooden floor should be placed to prevent the materials from soaking, corrosion, shrinkage and deformation and accidents caused by water inflow;
(2) It is forbidden to pile flammable materials near various power and lighting lines. Indoor lighting and on-site mobile lighting have reliable moisture-proof measures, and distribution boxes and switch boxes have rain-proof measures. Non-electricians are not allowed to use electrical equipment and privately change lines.
(3) all kinds of electrical equipment used in the open air should be placed in a dry place with a high position. The power switch box shall be rainproof. The welding machine should be placed in a waterproof, moisture-proof, sun-proof and well-ventilated shed. The shell of the welding machine must be well grounded, with a separate switch. When opening and closing, wear insulating gloves and operate sideways.
2. Construction requirements in flood season:
(1) The ground of the stockyard (such as steel yard, timber yard, steel pipe yard, etc.) in the construction site is higher than the ground of the site, and drainage treatment is carried out.
(2) The stability of foundation pit slope must be checked frequently during the rain period construction. In case of slope cracks or the possibility of collapse, reinforcement should be carried out in time. After the hidden dangers are eliminated, the construction can continue.
(3) On the construction operation surface, the rainwater will be cut and irrigated by special personnel according to the position of the sump in the project, and the water will be drained from the sump to the site drainage pit with a water pump.
(4) Anti-skid treatment shall be taken on the scaffolding for construction and the pedestrian passage, and the laid scaffolding shall be checked for firmness and reliability, and anti-skid strips shall be added.
[5] Full-time electricians often regularly check the flexibility, reliability and safety of the leakage protection devices in each distribution box, and rectify the problems in time to ensure the normal operation of the distribution box during construction.
3. Windproof requirements on the construction site:
(1) When the operators carry out inspection, repair and maintenance work on high places, they should avoid doing it in windy weather. If necessary, they should set up safety ropes and take protective measures.
(2) After the high-altitude operation is completed, all parts, tools and wastes should be cleaned up together to avoid personal injury and material injury caused by strong wind.
(3) security officers should strengthen patrols in strong winds, check whether the doors and windows of the houses in the area are closed, and whether signs, signs and banners are in danger of being blown off. If hidden dangers are found, they should be reported and rectified in time.
(4) scaffold operation is not allowed when the wind exceeds level 6.
(5) Before the strong wind comes, it is necessary to arrange the workers to evacuate to the safe area in time, and pay attention to personal safety. [6] Before the arrival of strong wind, inspect, lick and temporarily reinforce the areas and major equipment under its jurisdiction, such as towering independent machinery, scaffolding, templates, temporary facilities and enclosures. Small machines and tools and sporadic materials piled on the floor and roof should be piled up and reinforced, and things that cannot be fixed should be moved to the building in time, and aerial workers should be evacuated to safety in time. After the strong wind, the formwork, steel bars, especially scaffolding and power lines should be carefully inspected immediately, and the problems should be handled in time, and the work can be resumed only with the consent of the person in charge at the scene.
once, strengthen the safety management of temporary facilities. It is necessary to conduct a comprehensive safety inspection of temporary facilities such as dormitories, offices, warehouses and fences on the construction site. If there are hidden dangers, measures should be taken, and the reinforcement must be strengthened. If personal safety cannot be guaranteed, the personnel should be evacuated and dismantled in time to prevent collapse accidents.
4. Lightning protection requirements for the construction site:
(1) In case of thunderstorm weather, especially after hearing thunder, the safety management personnel should go to the site for inspection, immediately correct the problems found, and remind the operators to pay attention to lightning protection at the same time, stop the potentially dangerous operations when necessary, and evacuate the construction personnel to the safe area.
(2) It is not advisable to use mobile phones, walkie-talkies and other communication tools in open areas in thunderstorm weather. Don't make or answer fixed telephones, and try to use hands-free telephones.
(3) In thunderstorm weather, indoor personnel should not use faucets, stay away from metal pipes such as water pipes, heating pipes and distribution boxes, and close doors and windows.
(4) During construction in thunderstorm weather, never take shelter from the rain near power supply, trees and poles. 5] Construction personnel are prohibited from scaffolding construction in thunderstorm weather.
[6] After a thunderstorm, conduct safety inspection and do a good job in daily maintenance of facilities. After a thunderstorm, check whether the overvoltage protector on the power supply and signal line of electrical equipment such as computers is damaged, and replace it in time if it is found to be damaged.
once a lightning disaster occurs, it should be reported to the relevant departments in time, so as to deal with it in time and avoid being struck by lightning again.
5. Duty requirements for inspection in flood season:
(1) Strengthen the safety duty system during rain application, and provide safety education for field workers before rain application to overcome paralysis. Report the danger in time and organize the emergency rescue work.
(2) Strengthen the on-site safety construction inspection during the rain. During the rain, the on-site safety officer is responsible for checking and implementing the on-site safety protection facilities and mechanical rainproof measures, that is, the implementation of lightning protection and grounding facilities, and make inspection records, and report and solve problems in time.
(3) after the storm, organize relevant personnel to inspect and maintain the engineering scaffolding, etc., and eliminate the discovered safety hazards in time. Continue to ask the construction team to strengthen the implementation of the pre-shift speech system for construction personnel, clearly emphasize the safety precautions for construction in the rain period, and improve the self-safety awareness of construction personnel.
(4) Strengthen the inspection of the implementation of rain-proof, lightning-proof and drainage measures in the on-site stockyard. Communicate and implement the preventive measures and disclosure requirements formulated at the site carefully, so as to ensure that the management tracking is in place.
III. Emergency Response
1. All departments should make emergency response in different levels according to the meteorological information released by the Meteorological Center and factors such as its nature, severity, controllability and influence scope.
2. In principle, emergency response is required to be divided into four levels: IV (blue), III (yellow), II (orange) and I (red) to deal with general, large, major and extraordinarily serious natural disasters.
3. When there is a Class IV (blue) warning, all departments should arrange personnel to inspect the factory building, prepare emergency materials, clean drainage pipes, ditches, construction sites, check the electricity consumption, etc. according to the division of labor, and the department head will decide to start the emergency response according to the situation.
4. In case of Class III (yellow) warning, all departments shall arrange personnel to be on duty for 24 hours while implementing Class IV (blue) warning requirements, and report the danger as soon as possible, and the department head shall decide to start emergency response according to the situation.
5. In case of Class II (orange) and Class I (red) early warning, all departments should arrange all emergency team members to be in place and report to the company to start emergency response while implementing the requirements of Class IV (blue) and Class III (yellow) early warning.
IV. Responsibility Requirements
1. Each department must put this work on the work schedule of production safety and set up a special group to conduct unified command.
2. Each department should formulate a perfect emergency plan, set up a leading group and report it to the company's safety supervision office for the record.
3. The contents of the emergency plan must specify the list of team members, list of materials and equipment, responsibilities of team members, contact numbers of team members, etc.
4. It is forbidden to misappropriate all kinds of flood control, windproof and lightning protection materials.
5. The person in charge of each department must be the first person in charge of the group, and be fully responsible for flood control, wind prevention and lightning protection. If the disaster relief and rescue work is not handled and controlled in time, resulting in potential safety hazards and accidents, the accountability system for the person in charge shall be implemented.
6. During the flood season, members of emergency teams of all departments must turn on their phones 24 hours a day to ensure smooth communication, and to ensure that abnormal situations in the field are eliminated and controlled in time. Problems in flood control work should be reported in time, and those who fail to perform their duties in violation of regulations should be dealt with seriously after investigation.
7. For matters not covered in the notice, please refer to the relevant safety management system of the company.
all departments are requested to seriously implement the above notice, immediately carry out hidden dangers investigation and rectification work, and report the implementation of rectification and related emergency plans to the safety supervision office in writing before 16: on X.
Safety and Quality Supervision Office
2xx x x x day II: Notice of Flood Control and Flood Prevention in 222 Model essay
Comprehensive agricultural service centers in various towns and streets:
In order to conscientiously do a good job in flood control and disaster relief, according to the deployment requirements of provincial and municipal flood control and drought relief headquarters on flood control and typhoon prevention, the Municipal Bureau of Agriculture and Rural Affairs decided to organize flood control and typhoon prevention inspection, and the relevant matters are hereby notified as follows:
1.
II. Inspection contents
Investigation on flood prevention and typhoon hazards of key facilities such as high-efficiency cash crops, vegetable greenhouses and agricultural demonstration parks (bases); Maintenance and reinforcement of vegetable greenhouses and dredging of drainage channels; Seed, fertilizer, diesel oil and other relief materials, as well as drainage machinery and other flood control and disaster relief materials and equipment preparation.
iii. inspection methods
all towns and streets are requested to carry out the inspection of flood control and typhoon prevention in a solid manner by means of on-the-spot inspection, spot check, etc. according to the actual situation and in combination with the weak links and problems existing in the flood control and typhoon prevention work in previous years.
IV. Work Requirements
1. All towns and streets should attach great importance to the inspection of flood control and typhoon prevention, fully implement the responsibility of flood control and typhoon prevention, further clarify the inspection contents, carefully organize and implement them, adhere to the problem orientation, and do a good job in source prevention. The Municipal Bureau of Agriculture and Rural Affairs will send an inspection team in the near future to carry out comprehensive inspections on towns and streets to ensure the safety of flood control.
2. All towns and streets should earnestly strengthen organization, coordination, supervision and guidance, and carry out flood control and typhoon prevention inspections from early morning to early morning in strict detail in accordance with relevant procedures and prescribed time limits. It is necessary to identify the shortcomings and outstanding problems in flood control and typhoon prevention, urge the establishment of rectification work accounts, clarify rectification responsibilities and measures, and do a good job of looking back.
3. after the inspection of flood control and typhoon prevention, all towns and streets should summarize the organization and development of flood control and typhoon prevention inspection in time, form written materials, fill in the summary table of agricultural flood control and typhoon prevention inspection and rectification, and report it to the planting department of the Municipal Bureau of Agriculture and Rural Affairs before X.
Municipal Bureau of Agriculture and Rural Affairs
2xxx x x day 3: 222 Notice of Flood Control Model essay
Each construction project department:
According to the latest weather forecast issued by XX Meteorological Bureau, heavy rain and torrential rain are coming in our city, which is likely to cause natural disasters, so typhoon prevention and flood control are advised. In order to ensure the absolute safety of personnel and property of our project management department, ensure the safety and smooth progress of the project, make the project pass the flood season smoothly, and minimize the impact of the rainy season on the construction. According to the requirements of the higher authorities, the project management department is required to make specific arrangements for flood control and flood prevention during the rainy season:
1. The project management department is required to set up a leading group for flood control and flood prevention to be responsible for organizing flood control and flood prevention in an all-round way.
the office of flood control and flood control command leading group is located in the security department of the project department, and the security officer of the security department is responsible for collecting the daily weather forecast information and informing the members of the flood control team of the weather forecast. When the higher authorities release flood warning information, coordinate the relevant departments and units to do a good job in flood warning and response, and implement the relevant flood control emergency measures of the higher authorities.
second, highlight key points and intensify efforts to eliminate dangerous situations.
it is required that all construction project departments must attach great importance to it, strictly strengthen the prevention work, quickly check the disaster-prone points one by one, find out the situation of the construction site, and focus on the risk elimination and danger elimination work. The key points to be grasped are as follows:
1. The parking position of large mechanical equipment should be reinforced;
2, the site drainage system dredge;
3. Site materials and temporary electricity utilization should be covered, etc.
Third, strengthen the responsibility and adhere to the duty inspection system.
the flood control leading group of each project department should strictly implement the day and night duty system, and adhere to the 24-hour site inspection duty system during the rainy season and flood season. Team members should stick to their posts, not leave their posts without authorization, keep alert at any time, observe carefully, especially pay close attention to dangerous areas, and report possible dangers to the project manager department immediately. In view of extreme weather changes, do a good job of "before rain, during rain and after rain" inspection. Once a dangerous situation occurs, quickly start an emergency plan, immediately organize emergency rescue, prevent the accident from expanding, minimize losses, and ensure the personal safety and property safety of personnel.
fourth, add flood control facilities.
- Related articles
- Corporate culture of Shanghai Weizheng Testing Technology Co., Ltd.
- How did the fire brigade know the location of the fire when it went to the police? I asked how the dispatching room of 1 19 conveyed the location of the fire to the frontline soldiers.
- Safe production public welfare posters-safety, safety slogans, safety posters! Suitable for chemical plants, please help provide. .
- Which province does Jiangshan Pucheng belong to?
- Advanced deeds materials of company departments
- Create a smoke-free campus banner
- What is there to do in Huayang Scenic Area?
- The hand-drawn anti-epidemic poster is simple-the simple hand-drawn anti-epidemic poster is simple and beautiful
- Idioms of radiology service concept
- When is the anniversary of Heda University?