Work summary of sewage treatment plant

The hard work has come to an end. Looking back on the work during this period, while achieving results, we also found the shortcomings and problems in the work. It is time to write a work summary and analyze the past This is a period of work. So how is a general work summary written? The following is a summary of the work of the sewage treatment plant that I collected for everyone (5 general articles), I hope it can help you. Work summary of the sewage treatment plant 1

I am a member of the operations department. I am very happy and honored to be able to report on my work status this year as we bid farewell to the old and welcome the new.

I am a new employee of the sewage treatment plant. This year’s work practice has given me the opportunity to witness the growth and progress of our plant. Looking back on this year’s work, I feel a lot of emotion. Under the correct guidance and careful care of the factory leaders, our factory continues to advance along the line of scientific development, gradually becoming mature, and making outstanding contributions to the environmental protection cause of Nanshelang Sewage Treatment Plant. As for me personally, I have also been improved and improved with the progress of the factory, and my theoretical level and technical management potential have greatly improved. Next, I will summarize my work from the following aspects, and sincerely hope that leaders and colleagues will provide guidance.

1. In terms of work attitude

I have a correct mind, seek truth and be pragmatic, and can treat work with a motivated attitude, meticulous, dedicated and dedicated. I know that my work is glorious, great and noble. In this era of vigorously promoting scientific development and harmonious society, low carbon, green, clean and environmental protection are the eternal themes. The recommendations for the Outline of the Twelfth Five-Year Plan for my country's national economy and construction also proposed that building a resource-saving and environment-friendly society should be an important focus in accelerating the transformation of the economic development model. Therefore, with a simple attitude, I work diligently, always be at the forefront, and value work above all else in my mind.

2. In terms of work performance

I strive to be the best, strictly control, and constantly optimize management methods and ideas. Since the operation of our factory, we have continuously carried out equipment debugging. I have become familiar with new equipment and new operating procedures in the shortest time, so that the new equipment can play its role to the greatest extent, improve work efficiency, and ensure the various processes in the work. It is safe and smooth, creating a zero error rate and successfully completing the year-end target! Of course, this is closely related to the close cooperation with colleagues. The unity and harmony of the entire factory staff are also an important driving force in my work.

3. I would like to take this opportunity to analyze my own shortcomings and advantages to clarify the direction of my future work.

I am an ordinary employee. In the process of working and communicating with young employees, I feel the vigorous vitality and vitality of young people, their high scientific and cultural quality and The potential of proficiently learning and applying new technologies has made me realize the gap in myself. In the new year, I will continue to strengthen my learning, keep pace with the times, and innovate ideas. At the same time, we will continue to maintain our advantages of rich experience, calmness and hard work, improve methods, increase efficiency, and ensure the safety and efficiency of the sewage purification process.

Looking back on the past, there have been many ups and downs; looking forward to the future, we are full of confidence. I believe that under the leadership of the factory leaders and with the support of my colleagues, I will continue to work hard and strive to create better results. I hope you will provide supervision and guidance! We also believe that our sewage treatment plant will achieve new glory! Finally, I sincerely wish all leaders and colleagues good luck in their work in the new year! May all go well with you! In good health! Happy family!

The above is a summary of my work, thank you all! Work summary of the sewage treatment plant 2

Time flies, time flies, and xx is about to pass in the blink of an eye. Looking back on the work of the past year, with the support and help of the company leaders and colleagues, I strictly demand myself . In accordance with the company's requirements, I have completed my own work well, which has enabled me to make new progress in both theory and practice. I have fundamentally got rid of the phenomenon that I could only work hard in the past and did not know how to sum up experience. This year’s work status is summarized as follows:

1. Daily work

1. Love your own job, have a correct work attitude, be serious and responsible, and be able to treat everyone correctly and seriously A job.

Repeating the work of inspecting, switching on and off equipment, and cleaning every day seems very tedious, and I don't even have rest during holidays, but I have no complaints. Work requires some sacrifices, so what the heck. No matter how big or small, if you don't take small things seriously, they will have irreversible consequences. The work is trivial, but in order to do a good job, I am not afraid of trouble, ask leaders for advice, learn from colleagues, explore and practice by myself, study relevant business knowledge seriously, and constantly improve my theoretical level and comprehensive quality. Stick to their posts and strictly require team members to abide by labor disciplines and various rules and regulations. Completed various tasks assigned by the department leaders seriously, on time, and efficiently.

2. At the same time, he also actively cooperates with colleagues in other departments to do a good job, and can take over when other colleagues are busy. For example: In the work of cleaning the garbage in the pump room of the factory, the original plan was to ask outsiders to clean it, but because of related reasons, they did not do it. Therefore, under the leadership of the factory leaders, the entire factory staff cooperated carefully, and it took two days to clear the pump. The house was cleared of rubbish and maintenance on the water pump was carried out. There are also the maintenance of the 3#4# biological pool, the rectification of the coarse grid, the maintenance of the guide rod scraper of the 1# secondary sedimentation tank, the installation of lightning protection facilities in the factory area, and the installation of the 5# pump at the Nanmentang Pumping Station. Cut off the incoming water, contact the centrifuge manufacturer, and cooperate with the maintenance department to repair the 1#2# centrifuge so that the concentration workshop can resume normal mud production as soon as possible. Install and debug the pump dry protection device to make the equipment in the concentration workshop safer and more secure to use and operate. And we can handle small problems that arise during production operations in a timely manner. For example, when river water backs up on rainy days, emergency solutions can be made in time to ensure the normal indicators of the factory.

2. Learning

Discuss and study at weekly team meetings, understand and listen to the spirit of various meetings at any time, and actively offer advice and suggestions, timely discuss and solve problems in daily work Various problems. Actively learn sewage treatment professional knowledge. Don't be afraid of trouble when encountering problems, ask leaders for advice, learn from colleagues, explore and practice on your own, and constantly improve your theoretical level and overall quality.

3. Style

Be able to abide by rules and disciplines, unite colleagues, be truthful and pragmatic, optimistic and progressive, and always maintain a rigorous work attitude and meticulous work style. Be diligent, work hard, be thrifty and endure hard work, and always be honest and do things diligently.

In one year of work and study, the main gains are as follows:

(1) Study with an open mind, be diligent in practical operations, integrate theory with practice, and be able to skillfully operate the position. Work.

(2) Complete other tasks assigned by leaders at all levels carefully, on time and efficiently. At the same time, I also actively cooperate with colleagues in other departments to do a good job. 4. Existing deficiencies and improvement methods.

Despite certain progress and achievements, there are still deficiencies in some aspects. For example, there are not many creative work ideas, individual work is not perfect enough, I am careless at work, and I still know too little about theory.

In the days to come, I will bring my solid work style, serious work attitude, and mature work experience into my work, and continue to overcome the shortcomings in my work. Strive to be an excellent employee and make greater contributions to the company! Summary of the work of the sewage treatment plant 3

In the first half of the year, the construction of county sewage treatment facilities carefully followed the provincial and municipal requirements, under the leadership of the county party committee and county government, and with the assistance and cooperation of relevant departments, On the premise of ensuring project quality and project progress, the construction authorities will intensify work efforts, improve working methods, and scientifically dispatch. The project progressed smoothly through the solid work of the construction unit. The progress and quality reached the expected goals, and the work was affirmed by the city and county.

1. Strengthen leadership and strengthen measures

Since the project started on August 1, 20xx, due to the complex landform of the factory site, the preliminary foundation treatment was difficult, and there was a lot of rain last winter. , causing great difficulties to the project progress. The foundation treatment took three months, and the main project was postponed to the end of November. At the same time, the pipeline network construction was not started until mid-December due to various reasons, so only about 30% of the project was completed by the end of 20xx. In accordance with the requirements of the city and county, it is necessary to ensure that the project is fully completed in June 20XX. The time is tight and the task is heavy.

To this end, the county party committee and county government require further strengthening leadership and strengthening measures.

Implement a monthly on-site dispatch system for the main leaders of the county party and government, and a weekly supervision system for the deputy county magistrate in charge. The construction department will put the work on the bureau's agenda, and implement the director responsibility system. A deputy director will be responsible for the project full-time and at the same time. The construction unit will report to the competent department every day, and the competent department will report to the main leaders of the county every week. Under the premise of ensuring quality, the project progress is effectively promoted.

2. Reasonable arrangements and obvious results

The sewage treatment plant implements shift operations during construction and is fully rolled out. The pipeline network implements multi-section simultaneous construction. As of December 20XX, the project completion status is: the sewage treatment plant has been fully completed, with a total investment of 28 million yuan, and the completion acceptance was completed on August 12, 20XX. The sewage interception pipe network was fully completed, with a length of 11 kilometers, a total investment of 16.22 million yuan, and completion acceptance on October 27, 20XX. After the completion of the project, the joint debugging of the factory was completed on July 22, 20XX, and the trial operation phase was entered. By November 10, the basic work of personnel recruitment and contract signing had been completed. The sewage treatment plant collects 6,500 tons of sewage per day. After treatment, the COD concentration of the effluent is 34.5 mg/L, the pH value is about 7-8, and the ammonia nitrogen is 8 mg/L, all of which meet the emission standards.

3. Strengthen supervision and strictly control funds management

The estimated budget for the construction of sewage treatment facilities is 41.503 million yuan, of which the estimated budget for the construction of sewage treatment plants is 26.3289 million yuan (21 million yuan for civil engineering, 5 million yuan for equipment), and the estimated budget for pipeline network construction is 15.1741 million yuan. Currently, 37.03 million yuan of funds are in place, including 7.5 million yuan of pipeline network reward funds. As of November 1, 20XX, the total payment funds were 29.836 million yuan; of which 23.3 million yuan was paid for the project, 3.73 million yuan for equipment, and 2.806 million yuan for other funds (including 15.2 million yuan for the sewage treatment plant and 8.1 million yuan for the pipe network) )

In terms of fund management, we strictly follow the "Interim Law on Fund Management of Provincial and County (City) Sewage Treatment Facilities Construction Projects". Specifically, the county accounting center will open a special account and arrange special personnel to carry out the work. For accounting, urban construction, financial banks, etc. arranged for special personnel to review. After review, the county government in charge signed and appropriated the funds. The financial accounting system for sewage treatment facility construction projects was strictly implemented.

Strictly implement the "Interim Regulations on Cash Management" promulgated by the People's Bank of China, reasonably verify the inventory limit of cash according to the actual needs of the project department, and pay the acquisition and construction costs below the limit. It is strictly prohibited to use idle notes to enter the treasury and arbitrarily misappropriate cash. . The cashier must balance the book balance of the cash journal every day, and the financial manager conducts regular or irregular checks on the cash on hand. The invoice must be signed by the person handling it, reviewed by the accountant, approved by the project manager, and submitted to the construction authority for review before it can be reported.

In the next step, we will further strengthen supervision, strengthen the operation and management of sewage plants and pipe networks, and ensure that the sewage treatment plant is signed on time and put into normal operation. Work summary of the sewage treatment plant 4

Recently, our company has set off the climax of the "three studies" activity of "learning politics, learning technology, and learning law". We will carry out this activity in depth and combine it with sewage treatment Let’s talk about the actual situation of the factory and talk about some of your own experiences. As the backbone of water pollution control, sewage treatment plants have a very important impact on improving a city's environment, attracting investment, developing tourism, and improving people's living standards. In the new era, doing a good job in the operation and management of sewage plants is to improve service levels to meet the requirements of market economic development, and to protect the environment, remove pollution, and ensure the sustainable development of the city's social economy. Let’s talk about some experiences on further improving the management of sewage treatment plants based on the “Three Studies”.

1. Current Situation of Sewage Treatment Plant

Xinyang City Sewage Treatment Plant was officially put into operation in XX. The operating funds were allocated from the government and the daily treatment capacity was 100,000 cubic meters. For the city, this scale has basically accepted the sewage discharged into the pipe network from the urban area. The second phase of the project and the reclaimed water reuse project are currently under preparation. The construction of this project will play a strong role in promoting the economic development of Xinyang City, urban ecological environment protection, and rational utilization of water resources. Focusing on the construction and development of sewage treatment plants on the one hand and internal management on the other hand have become the characteristics of our plant management work under real circumstances.

The sewage in the service area of ??our factory is mainly domestic sewage, mixed sewage composed of large public construction projects (hotels, restaurants) and some industrial wastewater. Since domestic sewage accounts for a large proportion, not only does the sewage have greater temporal unevenness, but also the composition of the sewage, such as the concentration of suspended solids is high, the concentration of organic matter is low, and the water quality fluctuates greatly.

Compared with ordinary urban sewage treatment plants, sewage treatment is more difficult and costly. Moreover, most of the equipment in our factory is imported. Although it has good reliability, it consumes a lot of power, has high maintenance rate and maintenance costs, and objectively increases the cost of sewage treatment. We should do a good job in operation management, save energy and reduce consumption, and adapt to the requirements of energy saving and emission reduction. Adhering to total quality management and paying attention to every aspect of the entire process of production management, no matter local or detailed, to achieve maximum savings and optimal operation is to ensure the efficient and economical operation of the entire plant and continuously promote the operation and management of sewage treatment plants to a new level. , the primary means to reach a new level.

2. Comprehensively promote goal management

Management is the carrier of goals, and goals are the realization of management value. Management without goals is blind and at a loss; goals without management are empty. Only the organic combination of specific goals and management methods can the effectiveness and profitability of management be achieved. Goals can be divided into stage goals and overall goals. Stage goals serve the overall goal. Only when goals are decomposed into all aspects of specific work can the purpose and significance of management be achieved.

The fundamental goal of sewage treatment plants is to control water pollution and protect the water environment. Decomposing the goals into specific aspects of management work means that the company sets tasks and targets for each department, conducts self-development and self-management, and jointly strives to achieve the principle of maximizing benefits. Objective management formulates different quantitative standards according to different majors and departments, and evaluates them in the form of cost indicators. Such as: water treatment unit cost planning indicators; production equipment maintenance cost planning indicators, etc. The basic principles for setting indicators are to ensure the normal operation of sewage treatment, strengthen water quality compliance rate, strengthen water treatment capacity and equipment utilization rate, strengthen safety production rate, equipment integrity rate, verify daily electricity consumption and total annual electricity consumption, and complete water treatment The goals of various equipment and maintenance and replacement tasks assigned that year are clear, so that managers and those under management can be motivated and each employee can be motivated to work. Economic responsibilities and various expenses are implemented on a dead basis, excessive waste is punished, and savings are rewarded, which strengthens employees' sense of ownership and helps promote the improvement of the economic benefits of the entire factory.

Objective management lies in timely and correct guidance and continuous innovation. We should always compare the operation and management level of our factory with that of brother units across the country, find gaps, catch up with the advanced, vigorously improve the entire factory, strive to reduce water treatment costs, and standardize management systems and procedures. It is necessary to establish the awareness of goal management among all employees of the company, implement it one by one in each specific work, and realize rewards and punishments.

3. Strengthen management innovation

Management innovation refers to creating a new and more effective resource integration paradigm. This paradigm can be a new and effective management of resources to achieve organizational goals. The whole process management can also be the detailed management of more effective allocation of new specific resources. The proposal and implementation of a new management method may improve production efficiency, save natural resources, coordinate interpersonal relationships, or better motivate employees, etc. These will help to effectively integrate organizational resources to achieve predetermined goals.

Management innovation is to proactively meet the challenges of the market economy, otherwise, it will only be eliminated by the rapidly developing market economy. Due to the shortcomings that have formed over the years and people's tolerance, sewage treatment plant management innovation cannot be achieved overnight, nor can it be achieved in one step. It can only be adapted gradually and accelerated. Establishing a management innovation system, promoting efficiency through management, promoting efficiency through management, and developing towards management are the cornerstones of our factory's operation and management model.

After years of practice and exploration, combined with factory conditions, our factory must establish an effective incentive and restraint mechanism. The first is to improve the supervision mechanism at all levels of the company, departments, teams and groups, so that target management can be followed and followed in a systematic manner. The second is to establish and improve the three-level assessment system based on the management system. Middle-level cadres and team leaders will be assessed every six months, and employee position wages will be assessed once a month, and assessment files will be established. The assessment results serve as the basis for job appointments, job mobility and performance salary levels.

The purpose of the implementation of the three-level management and assessment system is to put pressure on cadres and make strict demands on themselves, so as to strengthen the consciousness of employees and increase their enthusiasm. This improves overall work efficiency.

Management is productivity, and the management of human resources is the foundation of management innovation. As an important factor in management, labor force is the most active and active factor in the production process, which determines whether productivity is advanced and whether it adapts to the development of the market economy. How to scientifically allocate human resources, maximize people's enthusiasm and creativity, and improve people's overall quality are the goals that management innovation constantly pursues. The most effective way to implement dynamic combination in allocating human resources is to achieve "one specialty and multiple abilities" and comprehensively develop compound talents.

With the continuous improvement of our plant’s sewage collection system and the completion of the sewage treatment process, the workload of sewage treatment has doubled. To this end, our factory should organize centralized training for sewage treatment workers, laboratory workers, sludge workers, maintenance workers and other types of workers every year, and strive to have each employee hold multiple employment certificates and be able to interchange among various types of work; each employee is required Familiar with all production links of the factory and able to adapt to work in various positions. Through dynamic optimization and combination, a mobile and competitive employment mechanism has been gradually formed, truly achieving multi-purpose expertise and maximizing individual talents, so that labor resources can be effectively utilized, labor costs can be saved, and sewage treatment costs can be reduced. Adapt to the needs of enterprise development after restructuring.

4. Promote technological progress through management

Modern economic theory and practice have proven that technological innovation and technological progress are important forces for the growth and development of enterprises. The development process of the sewage treatment industry has always relied on science and technology to advance. How to spend the least money to improve treatment quality has always been the purpose of industry research in the water treatment sector. From the perspective of sewage treatment technology, from the traditional activated sludge method to the dozens of various treatment processes now, people are constantly exploring ways to achieve the best treatment results with the least energy consumption for different sewage properties. result.

The input and output of technological progress and technological innovation is an uncertain process, which is affected by many factors. In addition to factors in the technical field, management efficiency and methods are an important influencing factor. Therefore, the process of technological progress and innovation is not only a technical issue, but also a management issue. Management can reduce uncertainty in the process of technological progress and improve the efficiency of technological innovation.

The management process refers to the process of raising and solving problems in production activities. Some problems can be solved through personnel adjustments and improvement of personnel quality, but some can only be achieved through technological progress. For example: Our factory was built early, and many factors such as the coarse grating of the pretreatment equipment and the pollution interception conditions of the pipe network in the water treatment process caused a large amount of scum to enter the water collection well and even the oxidation ditch, affecting the subsequent treatment process. The emergence of problems has caused great difficulties in daily management. Therefore, only by technological transformation and rectification of the baffles of the coarse grids and strengthening the slag cleaning of the pipe network can the oxidation ditch be slag-free. The advancement of technology has led to changes in traditional management methods, and management has developed in the direction of intelligence and technology. There is no need to doubt that technological progress will have a negative impact on the improvement of management levels.

The difficulty of management affects the selection of sewage treatment processes and determines the direction of technological development. Carrousel technology is simple to operate and has high stability in sewage treatment, which is more convenient for operators. At the same time, the rapid development of industrial automation level has driven the progress of sewage treatment, making the operation, maintenance and management of Carrousel technology convenient. It is easy to implement and still has long-term use value in the sewage treatment industry.

5. Conclusion

Further deepening the "Three Studies" activities, strengthening management work, and exploring new ways of managing sewage treatment plants. New ideas are a long-term task. Let us join hands to combine management with energy-saving and consumption-reducing transformation, improve the quality of management personnel, ensure the operation quality of sewage treatment plants, and bring the management of sewage treatment plants to a new level. Work summary of the sewage treatment plant 5

Under the care and guidance of leaders at all levels, the XXX sewage treatment plant has completed the stable and up-to-standard operation of the sewage treatment plant with the hard work and collaborative cooperation of all teams and groups.

The operation status of Keqi sewage treatment plant in 20XX is now reported as follows:

1. Completion of energy conservation and emission reduction in Keqi sewage treatment plant

Keqi sewage treatment plant strictly follows the company and superior regulations In accordance with the requirements of construction, environmental protection, finance, water conservancy, discipline inspection and other departments, strict management and unremitting efforts ensured the stable operation of the sewage treatment plant to meet standards. From January 1, 20XX to the end of December 20XX, Keqi Sewage Treatment Plant treated 4.23 million tons of wastewater, with a treatment load rate of 77./3%, an average daily treatment capacity of 11,600 tons, and an average inlet water COD The concentration is 450.4 mg/L, and the average effluent COD concentration is 65.0 mg/L, achieving a chemical oxygen demand reduction of 1,630 tons; the incoming water ammonia nitrogen average concentration is 58.2 mg/L, and the effluent ammonia nitrogen average concentration is 24.8 mg/L, achieving ammonia nitrogen emission reduction of 151.3 tons. ; The effluent indicators all meet the national secondary urban sewage discharge standards.

The online monitoring data of XXX Wastewater Treatment Plant is connected in real time with the Chifeng Municipal Environmental Protection Bureau monitoring platform, and is regularly submitted to the superior environmental protection department, construction department, and development and reform department for daily, weekly, monthly, quarterly, annual verification, etc. Materials; welcome multiple inspections by the inspection team of the Ministry of Environmental Protection, the inspection team of the Autonomous Region Environmental Protection Department, the Eastern Inspection Center inspection team, the Chifeng Municipal Environmental Protection Bureau inspection team, the Chifeng Municipal Environmental Supervision Team, the Chifeng Municipal Environmental Monitoring Station, the banner government, and the banner agency. . Successfully complete the tasks assigned by environmental protection, construction and other departments at all levels.

2. Equipment operation in each workshop of Keqi Sewage Treatment Plant

After 5 years of operation, Keqi Sewage Treatment Plant has experienced unstable equipment aging, frost heaving in winter, and unstable incoming water quality. , excessive sediment and other reasons, the frequency of equipment failure increases and the wear and tear is serious. For example, due to unstable water quality in the water inlet grille room and the first pump room, the instantaneous flow rate is not easy to control, and excessive sediment and debris cause the grilles to not operate normally, which has affected the normal and stable operation of the sewage treatment plant. Resulting in reduced sewage treatment efficiency. In order to ensure that the sewage stably meets the standards, our factory has organized personnel to carry out dredging and maintenance many times in response to equipment failures, especially water inlet grille failures, sewage lifting pump failures, fan failures, etc. Ensure the normal operation of the equipment. All the installed COD online monitoring equipment and ammonia nitrogen online monitoring equipment have been compared, monitored and accepted. The comparison results are in compliance with relevant laws and regulations and have passed the acceptance of the Chifeng Municipal Environmental Protection Bureau.

3. Laboratory aspects

The water quality laboratory of Keqi Water Company conducts tests on drinking water and sewage according to the company's requirements. ***Inspected drinking water source wells, water purification plants, and pipe network terminal water 58 times; completed 7 sewage self-inspection items (water temperature, PH, COD, ammonia nitrogen, SS, dissolved oxygen), and conducted online monitoring of sewage After the system fails, manual supplementary data testing is performed. The inspection results are all in line with national standards.

4. Progress of sewage treatment plant upgrading and pipe network expansion projects, reclaimed water reuse and sludge treatment projects.

The total investment of the Keshi XXX sewage treatment plant upgrading and renovation project was 99.464 million yuan. In 20XX, the standard upgrading and renovation project was completed including the comprehensive equipment room, integrated water production workshop, MBBR pool renovation, compound hydrolysis tank, and sludge pump. Building and other construction projects, completing cable laying, equipment procurement and installation, etc. Entering the commissioning and operation stage, and completing environmental protection acceptance before the end of the year.

5. Work Plan for 20XX

Based on the operation of equipment in each workshop in 20XX, in 20XX our factory plans to repair some equipment with long running time and high failure rate (such as blowers, Grilles and water pumps) to carry out professional maintenance work; it is planned to carry out professional maintenance work twice a year (once in May after the temperature warms up and once in October before winter) to carry out sedimentation inspections on the water inlet grille room, water inlet pump room, biological filter and second pump room. Clean up the sediment to ensure the normal operation of the grille and sewage lifting pump; strengthen laboratory management, increase testing items and testing frequency, and ensure the quality of experiments; study hard to understand sewage treatment technology, new national standards, new methods and sewage Learn about laws, regulations, etc.

Efforts should be made to enhance the professional quality of employees and improve their personal abilities to ensure that the sewage treatment plant is operating stably and up to standards. Ensure the stable operation of the sewage treatment plant in accordance with the requirements of the company and superior authorities, and contribute to Keqi's energy conservation and emission reduction.