Summary is a comprehensive and systematic summary of a period of study, work or its completion, which can make your mind clearer and your goals clearer, so you should make a good summary and write a good summary. However, I found that I didn't know what to write. The following is a summary of the personal work of five librarians I collected for your reference, hoping to help friends in need.

On-the-spot personal work summary 1 xx years, I served as the supervision documenter of xx project.

Data is an important control link in engineering. Details such as the quality of materials used in the project, whether the handover between processes meets the requirements, and whether the project is constructed according to the drawings are well reflected in the data. Therefore, as a supervisor librarian, it is very important to collect, review and sort out information. Through this year's work and study, we need to do the following for information management:

A, data precontrol

This is very important and necessary for data management. Engineering construction supervision data is gradually formed by project supervision institutions in the process of project supervision, which is a true and comprehensive reflection of the engineering construction process and plays a vital role in controlling engineering quality. Therefore, if the information does not meet the requirements, the quality of the engineering entity is out of the question. Familiar with engineering data management regulations, fill in the data forms of construction units and supervision units, and classify and file them. The construction unit is required to unify the form format, synchronize with the site progress and file it in time.

Second, master the scope and content of data collection in each stage.

Project Xx is a highway project. With the gradual progress of engineering construction, I timely collect and sort out engineering changes, technical verification, engineering inspection, material application, use certificates of various materials and test reports. After carefully checking whether the information submitted by the construction unit meets the relevant requirements, submit it to the supervision engineer for review and signature. When materials enter the site, do a good job in witness sampling registration account and material entry and exit account, and accurately check whether the quality assurance materials are in conformity with the physical objects and whether there are any materials in violation of relevant regulations. The documents exchanged by all parties have been registered, and the information related to engineering construction, such as engineering changes and technical verification, has been transmitted to every relevant supervisor in time, so that they can keep abreast of the engineering changes. In the process of engineering construction, there are inevitable problems, so we will assist the site supervision engineer to do a good job of supervision contact list and supervision engineer's notice. In the process of project construction, I am responsible for recording the monthly project meeting, and distributing it in time for filing. There are more and more data in the later period, and the engineering data are filed by number, which makes it clear at a glance by classification and filing.

The documents exchanged by the parties are divided into Party A's documents, Party B's documents and government documents. All documents shall be filed in time, and a registration catalogue shall be made.

The supervision meeting is held once a month, and detailed records are made. After the minutes of the meeting are approved by the Director-General, they will be sent to all relevant units immediately, and all parties are invited to sign the text. If any party has any questions or objections after distribution, it shall state them in writing.

Change or replace file format or face-to-face communication. One is to ensure the normal working procedures and efficiency of the supervisor, and the other is to ensure that the resolutions at the meeting can be communicated to all units in the first time to avoid affecting the work due to various factors.

The monthly supervision report is a summary of supervision work and site construction for one month. Arrange the monthly supervision report from 25th to 30th every month and submit it to the owner.

Xx project started in March of 1 year, and was completed on October 30th of 20xx/kloc-0. The compilation time of completion data was from 654381month +065438 to February of 65438. According to the methods and requirements of the Highway Bureau to sort out the data, the procedures of composing papers, threading and binding, coding and cataloging are carried out, with one original and two copies.

Third, strengthen the connection between information and websites.

In the process of engineering construction, I went to the site in time to understand the construction situation and the arrival of materials, and urged the construction unit to do a good job in concealed engineering inspection, material acceptance, material sampling and delivery in time. At the same time, familiar with the relevant construction technology and construction specifications.

Four, strengthen communication and contact with the owner and the construction unit, improve the ability to reach an agreement.

In daily work, cooperate with the whole supervision team, be responsible for collecting, summarizing and sorting supervision data, check whether the data meet the specification requirements by reviewing the data, and assist the supervision engineer to urge relevant units to make rectification in time when problems are found. Through on-site inspection, all kinds of problems and hidden dangers existing in the project are found in time, and records are made to assist the on-site supervision in urging rectification. Report the major problems in the project in time and ask the chief supervision engineer for instructions, so that the problems can be solved as soon as possible.

Fifth, strengthen study.

As a supervision librarian, we should constantly learn new knowledge and be familiar with various construction technical specifications and design requirements. , and in strict accordance with the specification inspection and inspection of construction quality. Because technology and materials are constantly updated, only by constantly learning and supplementing their own shortcomings can we meet the needs of development. Learn with an open mind and learn from other engineering materials. Through mutual communication and learning with other supervision institutions, we can learn from each other's strong points and improve constantly, and truly be a good supervision librarian.

Conclusion of intransitive verbs

Supervising librarians should also learn to be rigorous and meticulous in their work. Don't be careless, save trouble. Everything related to the project and the quality of work is recorded in detail. Ensure that all major issues involved in the project are traceable, and the traceability basis is in the hands of librarians. As a librarian, to improve the sensitivity to "responsibility" and "basis", everything that happens in the project should be well documented, not because of saving money.

Or because of the reasons of both parties, the process of reserving basis is omitted. This often puts the supervisor in a dilemma. When you meet something you can't decide, consult with the director or the director's representative, let them make a decision, and don't make a decision without authorization. In the future work, I will constantly sum up experience, study and exercise, and improve my working ability. Let yourself finish the work better.

The summary time of documentary 2 personal works has passed, and 20xx is about to become the past. The footsteps of 20xx have come quietly, and the new year means a new starting point, new opportunities and new challenges. Looking back on 20xx years, I feel a lot. The work is summarized as follows:

I just came to work in the company in August this year, serving as the documenter of XXX project department. Because I have just joined the work, there are many shortcomings in terms of work ability, interpersonal communication and thinking. But in these respects, the company's leaders and colleagues gave me good guidance and enthusiastic help, which made me adapt to the work quickly. Looking back on my work during this period, I really made great progress in my thoughts, study and work, and grew up a lot.

After a period of study, I learned that the main job of the documenter is to sort out the complete construction materials in time, collect and keep the documents issued by the company and the minutes of the meeting of the project department, and put the documents that have not been specifically sorted into folders according to categories and number them; In addition, do a good job in the distribution, circulation and transmission of various documents and drawings.

In addition, through a period of work, the position of information officer is not as boring as everyone said. In my eyes, it is like a time recorder, which records the bits and pieces of the construction process with information such as picture information and written materials, and records the step-by-step changes of the site appearance. When I saw the original land, let alone the wasteland, turned into the scenery in our eyes, I was very pleased. In this process, I also learned a lot about the formation process and flow direction of information. At the same time, I also learned some construction processes and what is landscape structure, garden floor, garden water supply and drainage and so on.

Of course, there are many careless mistakes in this work. I remember the most ridiculous and careless thing I did was to fill out a project extension statement once. I accidentally wrote 20xx as 200 13. Through this incident, I clearly realized that to be a librarian, the most important thing is to be careful, careful again and careful again. At the same time, these calendars have made me mature, and I should consider all kinds of problems comprehensively to prevent similar mistakes from happening again.

During the period of working on the project, I have clearly realized my own shortcomings. Based on my own shortcomings, I will continue to be strict with myself, earnestly perform my duties with an attitude of "being open-minded, calm, eager to learn and positive" and do every job well with full spirit. If there are any questions I don't understand, I will learn from my colleagues in different majors and ask them for advice. I will try my best to cooperate with the project department to prepare materials, overcome difficulties and work hard to complete the work for the company.

Finally, I thank the company for giving me this opportunity to learn. 20xx is a brand-new year and a year of self-challenge. I will continue to greet the new year's work with full spirit and successfully complete the tasks assigned by the leaders.

The above is a summary of my work. Please give me your advice from company leaders and colleagues. I wish you all a happy New Year!

Summary of three people's work in 20xx documentary. As an engineering documenter, his main job is to follow Pan Moumou to carry out quality inspection and project acceptance supervision at various construction sites, and at the same time, he is responsible for the data collection, distribution, sorting and archiving of two construction sites in Area A and Area B.

The quality of a project is usually measured by the reflection of the engineering entity, but the engineering data is also an extremely important link. Through specific and detailed information, we can reflect the advantages and disadvantages of materials used in the project, the handover situation between processes, the construction situation of the project and so on. Therefore, supervision librarians play an important role in supervision work. As the supervisor of the company, we should be strict with ourselves, take good care of the pass, do a good job in collecting, reviewing and sorting out information, and make due contributions to the development of the company.

According to many years' experience in librarian work, I think and summarize the work of librarians as follows:

First, strengthen information management.

Doing well in data management is a necessary condition for doing well in data management. Because the project construction supervision data is composed of records recorded by the project supervision organization in the process of supervising the project, it is a comprehensive and true reflection of the project construction process and plays an important role in controlling the quality of the project construction. Therefore, if the data can't meet the work requirements, the quality of the engineering entity is virtual.

Therefore, we should attach importance to the management of data ideologically, adhere to the principle of data first, and strive to achieve "data pre-control project quality"

Second, master the scope and data of engineering data collection in each stage.

Third, strengthen the effective connection between information and websites.

Four, strengthen communication and contact with the owner and the construction unit, with the necessary coordination potential.

Fifth, we should strengthen our study.

During these three months, under the care and guidance of leaders and colleagues, through my unremitting efforts, I quickly adapted to the surrounding living and working environment and gradually entered the working state. During this period of work and study, I realized my responsibilities and shortcomings. The work I am responsible for now is summarized as follows:

1. Collection, arrangement and archiving of pre-project data.

2. Communicate with the engineering department in time, do a good job in the management of receiving, sending, replying, archiving and standardizing the distribution of all kinds of engineering drawings of various departments, cooperate with the work of various departments as much as possible, better assist project managers and engineering-related personnel during the construction period, provide them with the required information and do similar work, and submit them for inspection in time.

3. Collect and keep the documents and meeting documents issued by the company and relevant departments, and put the original documents that have not been specifically sorted into file boxes according to categories, so as to provide convenience for consulting documents.

4. Do a good job in the distribution, circulation and transmission of all kinds of documents and drawings of the project department, and archive the original documents. According to the regulations of the project department, the receiving department must sign the registration form of document distribution, circulation and transmission of relevant departments (internal and external), and classify and file the original documents.

During this period of work, the work seems tense and orderly. In the whole work process, I think I am serious, responsible and careful, with a strong sense of responsibility and enterprising spirit, diligent but not arrogant, full of work enthusiasm, and able to complete the work entrusted by the leaders seriously and responsibly; And actively learn all kinds of professional knowledge to improve their comprehensive quality and pay attention to their own development and progress. But at the same time, I also realize that I have many shortcomings: sometimes I don't have enough ability in my daily work, I don't pay attention to restraining myself in words and deeds, and I don't give full play to my initiative in my work. I need to further improve my foresight in my work and flexibility in dealing with emergency affairs. I need to strengthen my study of professional knowledge in peacetime. But these shortcomings, in the future work, I will actively learn more, see more, listen more and ask more questions, and at the same time be diligent in eyes, hands, mouth and legs.

First of all, I would like to thank the company for giving me this job opportunity and making me lucky to be one of them. In the past three months of work, I have learned a lot of knowledge that I have never been exposed to before, and it has also given me a process of exercise and growth.

I have been working for more than two months. During these two months, the leaders of the company and colleagues from various departments enthusiastically helped me, which made me feel cordial and quickly adapted to the new working environment. During this period, by participating in various trainings and activities organized by the region and the company, I have a profound understanding and understanding of our development history, entrepreneurial spirit and culture, and at the same time, I have comprehensively improved my own quality and professional ability, and enhanced my sense of belonging to the company, which has benefited me a lot.

At work, I have been exposed to many jobs that I have never been exposed to before, and I can learn new knowledge and skills every day. The company also arranged people to follow the post. With the careful help of the people and colleagues, I quickly cleared my mind and put myself into the role of work.

My post is documenter, and I am mainly responsible for the data file management, statistical management and office management of engineering projects. Responsible for receiving, counting, registering, distributing, filing and managing all drawings of the project. After receiving and registering the engineering drawings, they will be distributed to relevant units and personnel in accordance with regulations, and signed by the recipient for confirmation. Drawings are folded in batches, and construction engineering drawings such as building plans, elevations, profiles, architectural details, and structural construction drawings are classified and managed according to the order of data catalogue. Collect and file all technical changes, negotiation records, meeting minutes and other materials during construction. Registration, control, sub-management, supervision, sending and receiving, printing, transmission, archiving, archiving and destruction of project documents and materials. Do a good job in the accumulation, sorting, processing, storage and archiving of various materials.

The work of a librarian seems easy, but in fact it is trivial and tedious. It is not easy to do it well. Through many times of self-examination and self-correction, at the same time, many problems and shortcomings that need to be rectified are exposed:

65438+ In the following work, I will strengthen the tracking in this respect and improve the timeliness of document circulation.

2. Lack of professional knowledge: In engineering data management, due to the lack of professional knowledge, I have a poor grasp of some professional vocabulary and concepts, which leads to a decline in the efficiency of data collation. In this regard, I will work hard to overcome and improve work efficiency through my own learning accumulation and the guidance of various professional engineers in the project department.

3. Enhance the awareness of electronic archiving of engineering data: engrave and archive the data regularly to ensure the complete backup of the data and avoid disputes caused by data loss in the future. These shortcomings pointed out the direction of improvement for me. In my future work, I will study rules and regulations and related documents more seriously, master professional knowledge, improve my working ability, strengthen my sense of responsibility and do my personal work in time.

Thank you for your help during my employment, and I hope you can give me more support and advice in my future work, so that I can better improve myself and better adapt to the needs of my work.