Joke Collection Website - News headlines - Civilized construction technical organization measures?
Civilized construction technical organization measures?
What are the specific contents of civilized construction technical organization measures? Zhongda Consulting will answer them below.
In order to ensure that the project is carried out safely, with high quality and efficiency in a good environment, the company adopts standardized on-site management, formulates safety and quality measures, implements various measures, and pays close attention to employee education to ensure that all personnel are safe , in a civilized environment.
The project site is located on Wuhan Avenue in Laifeng County. It is a key civilized unit in Laifeng County, so civilized construction is particularly important. The project civilized site management goal is: state-level civilized construction site. In order to ensure that the project is carried out safely, with high quality and efficiency in a good environment, the company adopts standardized on-site management, formulates safety and quality measures, implements various measures, and pays close attention to employee education so that all personnel can construct in a safe and civilized environment.
1. Contents of the construction site The construction site fence must be tightly closed, complete, strong, and beautiful, with a flat top, a straight facade, and a height of not less than 2.5m. Set up a unified style of construction signage at an obvious place on the gate, and set up "five pictures and one sign" inside the gate. The content should be detailed and the handwriting should be neat, standardized and clear. Drainage measures must be taken at the construction site, and the roads on site must be smooth, solid, and smooth. Garbage inside and outside the building should be cleared and disposed of in a timely manner. Various placards at the construction site must be processed and produced in a unified manner. The fonts must be written in correct specifications, neat and beautiful, and always kept neat and intact.
2. Materials and tools at the construction site. Various materials and tools at the construction site should be stored in strict accordance with the designated locations on the construction floor plan. They should be classified and stacked neatly and stably according to specifications, so that they are aligned at one end and in one line, and the blocks are formed into blocks. Ding Chengxing,:: The height should not exceed 1.5m. Sand, stone and other bulk materials should be built with clearly marked partition walls, with clear boundaries, and should be stacked without mixing. For the storage of materials at the construction site, necessary rainproof, moistureproof, sunproof, antifreeze, fireproof, explosion-proof, damage-proof and other measures should be adopted based on the material properties. Valuables, flammable, explosive and toxic items must be stored in a timely manner and managed by a special warehouse. , add obvious signs and establish strict procedures for receiving and returning materials. All construction operations must ensure that materials are cleared after the work is completed. Garbage stations should be set up at the site according to the location on the floor plan, and timely centralized sorting, recycling, utilization, and transportation should be carried out. Water and electricity should be conserved at the construction site to eliminate the phenomenon of long running water and constant bright lights. . The construction site strictly implements quotas for receiving materials, and the procedures for receiving and returning materials should be complete. There should be strict inspection systems and necessary registration procedures for materials entering and leaving the site, and a sound material saving ledger should be established.
3. Environmental sanitation at the construction site The construction site must always be kept clean and hygienic. Transport vehicles are not allowed to bring sediment out of the site, and must not leave it scattered along the way. Offices and worker dormitories must be kept clean and orderly, sanitary, and free of dirt and sewage. Domestic garbage should be piled up in a centralized manner and removed in a timely manner.
4. Environmental protection at the construction site: Various forms of environmental protection publicity and education activities should be carried out at the construction site to continuously improve employees' environmental awareness, organize regular studies, conduct assessments and inspections and keep records. Special garbage buckets should be used for vertical lifting of construction waste. Throwing in the air is strictly prohibited. Construction waste should be sorted and transported out of the country in a timely manner. During the windy season at the construction site, designated personnel will be assigned to sprinkle water to prevent dust from flying around the site.
5. Take the following measures to minimize interference to the environment and surrounding residents. (1) Reasonably arrange night construction projects to effectively control construction noise. Construction workers are not allowed to make loud noises or hit other objects to reduce man-made noise. (2) On-site layout: The mechanical processing room is built with lime sand brick walls, and there are no windows on the walls. (3) Reasonably arrange effective working hours from 6 a.m. to 22 p.m. and use low-noise vibrators when pouring concrete to reduce disturbance to residents at night. (4) Try to arrange transportation of materials during the day to reduce the noise of transportation machinery at night. (5) For construction workers, they are not allowed to make loud noises at night, handle with care during construction, and are strictly prohibited from hitting objects.
(6) According to the special circumstances of the construction of each sub-project, certain closure measures will be taken to reduce disturbance to residents. (7) In case of special circumstances, post a notice in advance to obtain the understanding and support of residents in neighboring units.
6. Fire protection measures at the construction site Establish and improve the fire protection management system, assign dedicated personnel to take charge, conduct unified management, and truly achieve "safety first, prevention first". According to the actual conditions of the construction site, prepare effective fire protection plans, organize regular education and training for volunteer fire fighters, and master the knowledge of fire prevention and fire extinguishing and the correct use of fire fighting equipment.
The fire roads at the construction site must be smooth, a strict management system for fire, electricity and flammable and explosive materials must be established, and night duty and patrols must be strengthened to eliminate fire hazards. Fire hydrants at construction sites, woodworking workshops, warehouses and other areas where flammable materials are present must be clearly marked and equipped with sufficient fire-fighting equipment. It is necessary to strengthen the management of workers in each team, control the number of personnel, and sign a public security and fire protection agreement. Non-construction personnel are not allowed to enter the construction site. In special circumstances, entry must be approved by the person in charge of the security department. There should be clear fire prevention publicity signs on site, and employees should be educated on security and fire prevention once a month. At the same time, volunteer fire brigade should be trained, fire prevention work inspections should be organized regularly, and fire prevention work files should be established. Electricians and welders engaged in electrical equipment installation and electric and gas welding and cutting operations must have operating licenses and fire licenses. Before starting a fire, nearby flammable materials must be cleared, and fire watchers and fire-extinguishing equipment must be provided. The fire permit is valid on the same day. If the fire location changes, the fire permit procedures must be re-applied. Smoking is strictly prohibited in warehouses and places where flammable and explosive materials are stored. .
For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd
- Previous article:Health life, health education composition how to write at the beginning?
- Next article:What is the slogan describing the railway station?
- Related articles
- After listening to "Growth Thinking" shared by teacher Li Yunlong, I discovered that growth is not that difficult.
- How to write the host speech for financial salon activities
- Holiday community slogan
- Grand slogan
- Where is Yichang City, Hubei Province located?
- Beijing: Citizens are advised to "sit less" during the Spring Festival. Should sitting be banned in other areas?
- Looking for the lost baby banner slogan
- What are the four campus defenses?
- Spring Festival parent-child theme activity planning template?
The Spring Festival began in the early years, and everyone went back to visit relatives and friends and was busy for a year. The 23
- Pray for the oath to commemorate the December 29th Movement, which should be simple and suitable for collective oath.