Joke Collection Website - News headlines - Seeking the plane layout of water-stabilized mixing station urgently
Seeking the plane layout of water-stabilized mixing station urgently
The layout of each processing plant should be based on the principle of convenient use, safety and the cost of fire prevention and transportation will not affect the normal construction of construction and installation projects. Generally, processing plants should be arranged in the same area, and most of them are on the edge of the construction site. All kinds of processing plants should be arranged in the same area with the corresponding warehouses or yards. Concrete mixing station. According to the specific situation of the project, three layout methods can be adopted: centralized dispersion or combination of centralized and dispersed phase. When the amount of cast-in-place concrete is large, it is appropriate to set up a concrete mixing station at the scene. When the transportation conditions are good, it is most beneficial to use centralized mixing or choose commercial concrete. When the transportation conditions are poor, it is appropriate to use decentralized mixing to make a processing plant. Generally set in the idle area of the construction unit, such as the fan-shaped area where the special line of the storage yard turns or near the off-site. Steel processing plant. Distinguish between different situations and adopt decentralized or centralized layout. For steel bars and large pieces of steel mesh that need cold working and welding, a central processing factory should be set up, and the processing factory should be close to the prefabricated component processing factory. For small machined parts, simply mechanically formed steel bars can be processed in scattered steel bar processing sheds near the place of use. Wood processing plant. According to the workload, processing nature and types of wood processing, it is decided whether to set up several temporary processing grids centrally or dispersedly. General principles.
According to the bidding documents of the circulating fluidized bed air cooling unit project of Zhongneng Electric Fuel Co., Ltd., according to the topography of the project plant and construction site, the temporary construction facilities are arranged in consideration of environmental transportation. Principle of general layout of buildings The general layout of buildings should be compact and reasonable, and the construction land should be reduced as much as possible. Construction facilities shall not occupy permanent production facilities and construction sites as far as possible. According to the characteristics of the project, construction machinery is equipped to meet the hoisting requirements of boilers, steam turbines and air cooling islands. The construction road adopts the principle of combining permanent and temporary. Construction drainage should be fully combined with topographic conditions, and regular drainage facilities should be used as much as possible. Construction water, electricity, fire protection and other facilities should meet the requirements of convenient construction, safe and civilized production, environmental protection and labor protection. Site layout According to the bidding documents and Q&A documents, the construction site is arranged in the north and south areas of Chongqing-Zambia Highway, covering an area of about * * *. In the northern area of Yuzan Highway, there are mainly temporary yards for installing yard, installation shed, materials, equipment warehouse and equipment. The south area of Yuzan Highway mainly includes steel bar processing and component prefabrication yard, construction living area of revolving material warehouse, owner supervision office area, project department office area, company office area and boiler room water pump room. See the construction general layout for details.
Course design task book building general layout plan of primary school teaching building project student name student class major Tiannan Vocational College of Architectural Engineering course design title building general layout plan of primary school teaching building construction site Nanning course design condition scale building area building floor five-story structure frame structure general layout plan of primary school teaching building plan is based on construction drawings, general instructions of architectural design and architectural structure design, design contents and requirements of unit project construction scheme, basic situation on site, arrangement of lifting and transporting machinery, concrete pump of pump truck, hoisting of derrick, etc. Layout calculation of processing shed warehouse and material component yard of mixing station; Determine the area of processing shed warehouse and material component yard of mixing station reasonably. Pavement structure and width shall be selected for transportation road layout, and construction roads shall be arranged reasonably. The layout calculation of temporary facilities determines the area of various temporary facilities and reasonably determines their positions. Reasonably determine the layout of temporary water supply and power supply lines. Require independent completion. On the basis of hand drawing, the design results and submitted materials of the stadium are drawn by computer and submitted to the construction site layout 1.
Precast fences are set up on this site along the demarcation line and other boundaries of the planned red line bid section. The fences are high, and the high fences are built with brick walls on the side of Jingming South Road. The construction site is under closed management. Set a wide entrance and exit at one side of Jingming South Road. Wide roads and turning radii. The road surface from the gate to the office is hardened with concrete, and the thickness of the road surface is set to a single slope. The rest of the pavement is compacted with gravel or earth and stone, and trapezoidal drainage ditch with depth and bottom width is set along one side of the road, and the longitudinal slope is ‰. A steel bar processing yard is set up on site, and the steel bar processing shed adopts a colorful steel plate movable shed. According to the layout of the tower crane, set up a turnover material yard. According to the layout of double cage cranes, a segmented storage yard is set up. There are two mortar mixing stations, sand and gravel storage yard and cement silo. Sand and gravel are stored in the open air on the construction site, and cement is stored in the cement silo. The mixing station should be equipped with steel pipe scaffolding and hand protection shed, and the turnover materials and blocks should be piled up in the open air. The duty room is built of brick walls. The entrance to the office and living area is equipped with seven-figure-one-card archway and publicity column. The archway and the publicity column are made of thick solid bricks. Offices and dormitories use prefabricated houses on the first floor. Material warehouse, laboratory, machine room, power distribution room and cement room are all thick solid bricks. Open-air motor vehicle parking lots are set up in the office and living area. In the structural construction stage, the platform is used for horizontal and vertical transportation.
What are the key points of site layout design? What is the arrangement of vertical lifting and transportation equipment?
(1) The track layout of the track tower crane mainly depends on the plane shape and size of the building and the conditions of the surrounding construction site. Drainage must be done around the track subgrade.
② When arranging and fixing the position of vertical transportation equipment such as derrick gantry, the lifting capacity and service scope of machinery should be considered according to the plane shape and height of the building and the weight of materials. It is convenient to transport materials, organize layered and segmented flow construction, and minimize the transportation distance.
(3) When arranging self-propelled hoisting routes such as crawler-type tire cranes, the size, weight, stacking position, installation height, construction sequence and hoisting method of the plane shape of the building should be considered. The location of the mixing station, whether concrete or mortar, has the limitation of transportation time, so the mixing station should be arranged near the watering place, and there should be corresponding sand yard and cement warehouse nearby. At the same time, the convenience of sand unloading and cement storage should be considered. In addition, the discharge of construction water should be considered around the mixing station. However, in the current construction, Party A requires the use of concrete in the mixing station, rather than on-site mixing. Determination of stacking position of materials and components The stacking place of materials and components should be as close as possible to the place of use or within the lifting capacity of the crane, and transportation should be considered.
The construction scheme of unit project is an important part of the construction organization design of unit project, and it is also the plane planning and spatial layout of the construction site of buildings or structures. Reasonable construction layout is very important for the smooth implementation of the construction schedule, which will directly affect the cost, quality and safety production of civilized construction projects on site. So is the decoration project. The design content and the location and size of underground buildings or structures and various pipelines that have been built or planned on the general plan according to the design content. Mobile crane includes the traveling route of rail crane and the location of vertical transportation facilities. Topographic contour lines are used to measure the position of setting-out piles and the position selected by earthwork. The layout of temporary facilities for construction services includes various materials, including semi-finished plumbing products, electrical and sanitary materials and industrial equipment, the layout of construction roads for warehouses and yards, and the locations of temporary water supply pipelines, power supply lines, steam and compressed air pipelines. Second, the design is based on the construction plan of the architectural decoration project. On the basis of the first-hand information obtained by the architect's on-site reconnaissance, the design should be carried out according to the requirements of the construction plan and construction progress. The design is based on the original information of the construction area.
What are the design points of the site layout? The recommendation of Longwang Construction Forum has not been resolved. The latest discussion is that terrazzo floor is made of plastic instead of copper bars and glass bars. There are no copper bars and glass bars embedded in terrazzo floor. Can I use other strips? Have you ever used the yellow plastic underneath? Have you all switched to this material now? The rainproof measures for long-span maintenance structures discussed in the latest forum have not been solved. This maintenance project is an octagonal structure with a diameter of less than meters. Party A requires the removal and replacement of the roof, so rainproof measures should be considered during the rainy season construction to prevent rainwater from entering the room and polluting the room. The height of this building is 100 meters. The recent forum discussed the unresolved problem of steel bar distribution on the raft. Whether the reinforcement in the raft must meet the requirements of anchorage length like the stressed reinforcement, or whether it can recommend excellent materials that are safe and anchorage-free in building construction. In recent years, the management level of domestic construction enterprises has gradually improved, but accidents in production safety at the construction site still occur frequently, and the situation is not optimistic. These recurring problems should be found in the management system, and the established safety management system should be continuously reformed and improved. How to accurately analyze the problems faced in production management of construction industry, strengthen institutionalized safety management and avoid all kinds of injuries.
Some construction sites are orderly? The rest is a mess? This is directly related to the rationality of construction drawing design. The construction scheme of unit project is the main part of construction organization design. ? What is the design content? What scale is usually used to draw the construction plan of a unit project? Generally, the following contents shall be indicated on the drawings? Location and size of all buildings, structures and other facilities built and planned on the construction site plan? Where are the traveling routes of mobile cranes including rail cranes and vertical transportation facilities? Warehouses and yards for various materials, semi-finished parts and industrial equipment? The layout of all temporary facilities serving the construction includes mixing station, processing shed, warehouse, office, water supply and power supply lines, construction roads, etc. Surveying and setting out piles? Topographic contour? Earth-moving wasteland Safety fire prevention facilities. ? Design Steps The general steps of unit engineering construction drawing design are as follows? Determine the location of the crane. The location of the crane directly affects the location of the mortar concrete mixing station in the warehouse and the layout of roads and hydropower lines. So it should be considered first. Arrange and fix vertical transportation equipment, gantry derrick mast at tower boundary, etc. The construction sections are mainly divided according to the mechanical properties, plane shape and size of the building.
The contents of the layout plan of the construction site (1) The current situation of the construction site includes the connection between the construction enclosure at the construction entrance and the off-site road, and the position, outline, size and floor of all buildings and other facilities on the ground and underground. (3) the location and area of materials and components of temporary facilities for production and living; (4) the location of large-scale construction machinery and vertical transportation facilities, the layout of temporary water and electricity pipe network drainage facilities and temporary construction roads, etc. (5) Fire safety and environmental protection facilities on the construction site. Construction site layout principle (1) On the premise of ensuring smooth construction, the site layout should be compact to save land. Temporary occupation of roads in urban construction should be approved. (2) When arranging the overlay facilities, do not occupy the position of the proposed project to avoid unnecessary relocation. (3) Semi-finished components of various materials shall enter the site in batches as planned, and shall be arranged near the use point as far as possible, or hoisted with the shipment. Minimize the internal transportation distance on site and reduce the secondary handling on site. What are the layout steps of the site layout? In the process of drawing graphics, the small software of building construction site plan drawing integrates many lines commonly used in routine operations. Commonly used graphics include schematic diagram, legend and frame of construction facilities in the functional area of tower crane site.
Three concrete mixing station layout scheme four concrete production technical requirements of mixing station five concrete production preparation scheme six concrete production organization and implementation seven main points for attention in safety production eight main construction personnel configuration accessories 19 main construction machinery configuration accessories 20 project organization accessories 3 1 equipment entry time twelve mixing station layout accessories 43 concrete mixing application form annex 5 this scheme. (3) When the trackless self-propelled crane is used for horizontal or vertical transportation, the material component yard mixing station should be arranged along the crane running route and within the effective lifting range of the crane. In addition, when the volume of the concrete foundation is large, the concrete mixing station can be directly arranged around the edge of the foundation pit. Next to it, the corresponding sand yard will be arranged to realize concrete pouring before transportation and reduce the transportation interval of concrete. Material components must meet the layout of transportation roads. Weifang Beite Construction Machinery Co., Ltd. is a comprehensive backbone enterprise specializing in R&D, sales and maintenance services of building materials machinery such as stabilized soil mixing station, stabilized soil mixing station, concrete mixing station, graded crushed stone mixing station, concrete mixing station, commercial concrete mixing station and water stabilized mixing station. Control the cost plan before the project construction in advance. Before the construction project starts, the cost management personnel stand in the enterprise.
Description ① All kinds of weighing instruments should be checked regularly to keep accurate ② The moisture content of aggregate should be measured frequently, and the number of measurements should be increased in rainy season. The shortest time for concrete mixing shall meet the requirements in the table. Specification for concrete mixing of stone size mixer minimum time
- Related articles
- Can patterns on non-woven fabrics be printed with a photo machine?
- Hosted a class meeting on the theme of Qingming Festival, looking for content.
- Chess achievement slogan
- In order to enhance students' sense of responsibility, design a publicity slogan.
- Healthy diet slogans
- Unit Double Ninth Festival activity plan
- About proverbs
- Audition Family Slogan
- Slogans for protecting communication optical cables
- Publicity slogans for public medical and health undertakings