Joke Collection Website - News headlines - What are the regulations for safe and civilized construction management on site?

What are the regulations for safe and civilized construction management on site?

The following is the relevant content on on-site safe and civilized construction management regulations brought to you by Zhongda Consulting for your reference.

1. Purpose

Through prevention and control measures, we will reduce the probability of safety accidents during project construction, improve the image and environment of the construction site, ensure that the on-site sales environment is civilized and tidy, and enhance the company's brand image.

2. Responsibilities

2.1. The company's project department is responsible for establishing project safety and civilized construction management goals, ensuring the company's sales site image, incorporating safe and civilized construction management control measures into the "Project Management Instructions" and organizing their implementation. Organize safety and civilized construction inspections on project sites, and supervise and manage the management of supervision and construction units. Supervise the implementation of safe and civilized construction measures and fees by construction units, and be responsible for processing visas for the implementation of safe and civilized construction measures and fees.

2.2. The supervision unit is responsible for reviewing the safe and civilized construction management measures prepared by the contractor. After passing the review, they will be reported to the project management department for approval and filing. Responsible for the process supervision and inspection of on-site safety and civilized construction management activities implemented by construction units, and witness the implementation of safe and civilized construction measures. Responsible for issuing rectification notices for activities that do not meet the requirements and verifying the rectification results. Report unforeseen safety incidents on site.

2.3. The construction unit is responsible for implementing safe and civilized construction on site in accordance with the relevant construction safety laws, regulations, norms and regulations of the national and local government industry authorities, as well as the on-site safe and civilized construction management regulations and contract requirements formulated by Party A to ensure safe production. Responsible for formulating and submitting safe and civilized construction management measures (construction organization design) and organizing their implementation.

3. Work procedures

3.1. As an integral part of the bidding documents and contracts, these regulations must be disclosed before bidding, quotation, and contract signing before entering the construction site. The construction party is required to use these regulations as a basis and combine them with the relevant construction safety laws, regulations, and specifications of the national and local government industry authorities. , standards, regulations, and prepare and submit special safe and civilized construction management measures based on the specific characteristics and requirements of this project, which can also be incorporated into the construction organization design.

3.2. The construction party (Party B) must prepare the general layout of the site in the construction organization design, and submit the construction organization design to Party A and the supervisor for review and approval before implementation.

3.3. The construction unit is responsible for organizing construction in accordance with approved safe and civilized construction management measures.

3.4. During the construction process, the project department and supervision unit conducted on-site inspections and safety data inspections in accordance with the on-site inspection system. Supervise and manage the process of on-site safety and civilized construction management activities implemented by construction units. Issue rectification notices and penalty notices for activities that do not meet the requirements, and verify the rectification results. Witness and approve the implementation of safe and civilized construction measures.

4. On-site safe and civilized (environmental protection) construction requirements:

The layout of on-site safe and civilized construction measures must meet the following requirements (including but not limited to the following requirements and the parts specified in the contract attachment):

4.1 . Advertisements on construction site entrances, gates, and walls must comply with the unified regulations of Chimelong Company. The entrance door shall be a double-leaf swing door or a track-type sliding door with a height of not less than 1.8m. Double-leaf swing door specifications: door width ≥ 5000mm, height ≥ 1800mm, door leaves are divided into equal parts, one of which is equipped with a small pedestrian door of 1600mm × 800mm. The frame is made of metal angle steel, treated with anti-rust treatment, and double-sided with galvanized iron sheets. The background color of the door should be white, and the name of Chimelong Company should be written on the door leaf. Using standard colors, the character size is about 600mmX600mm (height × width). The door column section is 500mm×500mm, and the height is 2500mm, of which the height of the column cap is 200mm. It is plastered with 1:2 cement mortar and painted twice with white latex paint. A steel structure translucent light box door should be built above the door. The steel structure should be painted twice with anti-rust paint. No less than 8 fluorescent lamps should be installed inside, and the name of the project department should be written.

4.2. The construction site must be closed, and the temporary fence should be built with mixed mortar with a height of not less than 1.8m to ensure a solid structure and a beautiful appearance. The roof of the fence and the internal and external walls must be plastered and whitened with 20mm thick mixed mortar. The exterior is painted twice with white latex paint. Safety and civilized slogans must be written. The company logo and name must be included in the slogans. Party A will do project promotion on the street-facing walls. For promotional purposes. (See attached picture 1 for details)

4.3. Construction entrance image requirements:

The entrance image should comply with the relevant requirements of the local government and be reported to the project management department for review. "Eight signs and two pictures" must be established at the entrance of the construction site, namely, the construction unit introduction, project overview, project organizational structure, project management objectives, civilized and hygienic instructions, fire prevention instructions, six disciplines of safe production, ten safety technical measures, construction general Floor plan, sanitation responsibility map. Otherwise, Party A will make it on behalf of Party B, and the fees will be paid and kept by Party B, and the invoice will be used as the basis for settlement. If lost or damaged, Party B will be responsible for remaking it. There are eye-catching warning signs in construction areas or dangerous areas, and safety protection measures are taken. The specific dimensions are uniformly stipulated by the company:

(1) Sign size: The sign should be set in a rectangular shape, with a minimum size of 1800mm×900mm. It can be supported by steel pipes and angle steel, or embedded in the wall.

(2) Material of the sign: The sign panel is made of organic board, and the frame is made of aluminum alloy or stainless steel. Made according to the requirements of the attached drawing.

(3) The gate must be hardened, and wheel flushing faucets and drainage ditches should be installed at vehicle entrances and exits. The tires of all vehicles leaving the construction site must be washed and dry, and the road surface of the community must not be polluted. Vehicle sewage must be discharged to designated areas. location, and ensure that vehicles with mud must be washed before entering city streets.

(4) Guards must be arranged at the entrance and exit.

4.4. The construction site must be flat and have smooth roads. The site must be cleaned every day and sprinkled with water to ensure it is clean and dust-free.

4.5. The site should have a rainwater drainage system in place to ensure that there is no accumulation of water on site in rainy days.

4.6. Set up color steel plate or other standard temporary office space in the designated office area, and reserve a supervision office as required by Party A.

4.7. The construction site should have men's and women's toilets and shower rooms, with 1.8m high porcelain tiles on the inner wall of the shower room, 1.5m high porcelain tiles on the inner wall of the toilet room, urinal troughs and partitions covered with porcelain tiles, and the on-site toilets must be flush type. , equipped with high-level water tanks, mop pools, screen doors, water supply and drainage facilities. Pay attention to hygiene and keep the toilet clean and pollution-free.

4.8. For temporary closures agreed by Party A, within the specified construction scope, 2.2-meter-high double-layer green new dense mesh fences or color steel plate fences should be used, warning signs and other protective measures should be taken, and dedicated personnel should be assigned to perform daily cleaning to ensure that the project On-site image; traffic arteries adjacent to the construction building must be protected.

4.9. Various construction machines, tools and building materials should be placed strictly according to the layout plan of the construction site at each stage and are not allowed to encroach on the road.

4.10. The construction waste transfer site needs to be set up on the construction site, covering an area of ??6×6m, fully enclosed and protected with colored strips, and the height is not less than 1m. Construction waste must not be thrown down from high places and must be packed in bags and transported to the construction waste transfer site. The transportation of garbage shall be handled by Party B by itself. Sprinkle water when necessary to prevent flying. The construction waste transfer site must be treated on hard ground and drainage measures must be taken. All kinds of garbage at the construction site should be cleaned up on the same day, otherwise Party A will appoint personnel to clean up, and the cost will be deducted from the project payment.

4.11. The mortar and concrete mixing sites, steel bar processing and production sites, carpentry sheds and other temporary facilities set up on the construction site use scaffolding steel pipes, yellow and black paint (500mm yellow and black are used); asbestos tile roofs, and hard floors inside. Considering that there may be water and power outages at the construction site, Party B should prepare its own generators, pools and other facilities.

4.12. When mixing various types of mortar and concrete on site, a mix ratio sign must be hung, and the content must be complete and clear. When using bagged cement, always open the bag from the wrapping opening. They should be stacked neatly and should not be discarded anywhere.

The concrete and mortar mixer should produce a slurry tank and a water sedimentation tank (see the attached picture for requirements). After mixing, the equipment should be cleaned in time and the slurry tank and water sedimentation tank should be cleaned to ensure that the mixing site is clean and there is no accumulation of concrete or mortar.

4.13. Large piles of materials, sand and gravel, are classified and surrounded by bricks on three sides (300-500mm high). They are stacked in a square shape and cleaned at the edges. The masonry materials are classified into stacks and stacked neatly. The broken bricks are cleaned as needed. , bulk materials without feet, ash does not spill out, and slag does not dump randomly. Lime, paper ash, etc. should be loaded into the tank mouth so that they are not spilled and hard to transport. A 300-500mm high masonry should be built around the foundation pit of the ash tank. enclosure.

4.14. Finished steel bars and unprocessed materials should be stacked separately. Steel materials should be classified and stacked neatly according to specifications. Direct contact with the ground is not allowed, and the overhead height should not be less than 100mm. Scraps should be sorted and sorted in a centralized manner, and those that can be used should be used in a timely manner, and those that have no use value should be disposed of in a timely manner.

4.15. Building materials must be stacked neatly, with loose materials in squares and profiles in stacks, and marked as required. Pipe racks, fasteners, U-shaped clips, embedded parts, pads, etc. should be stored in pools. The floor of the material storage yard must be hardened.

4.16. Various bags (boxes) of materials in the on-site warehouse should be stacked into stacks, small and bulk materials should be stored on shelves, and all types of materials should be classified and labeled.

4.17. The cement stacking platform should be no less than 150mm above the ground, and should be paved with rolled materials to prevent moisture, water, and rain.

4.18. The stacking of prefabricated components should ensure that the site is flat, supported as required, and stacked neatly. Transportation and installation should be carried out in accordance with technical requirements to ensure that the components are not damaged.

4.19. Fixed mechanical equipment at the construction site must be cleaned and maintained in a timely manner, and must be protected by scaffolding and operating procedures and equipment signs must be hung. Equipment signs should indicate the person responsible for cleaning and maintenance.

4.20. Materials on each working surface of the construction site should be stacked neatly, and the work should be completed, materials used up, and the site cleared. Garbage on the floors should be cleared and cleaned in time, and materials should not be piled in the stairways to ensure that the place is neat, tidy, orderly and civilized.

4.21. Floor mortar and concrete must be recycled in time, and broken bricks and floor ash should be disposed of in a timely manner as required after cleaning.

4.22. Mortar trucks, ash troughs and other machinery must be cleaned and placed neatly after use for the day.

4.23. It is strictly prohibited to pull or pull wires without permission at the construction site, and it is strictly prohibited to keep lights on or running water. Construction water pipelines are strictly prohibited from leaking or leaking.

4.23. Steel pipe scaffolding is used. Skirting boards need to be installed on the outside of the scaffolding walkway. The height is not less than 180mm. The paint color is yellow and black (250mm alternating). Hard floors are used for water dispersion, and external drainage ditches are provided. The construction operation layer should be enclosed with a fence, the steel pipes of the scaffolding must be derusted and painted with yellow paint (yellow and black for a diameter below 1500mm), and the steel pipes for the diagonal braces of the scaffolding must be painted with yellow and black paint (for a diameter of 250mm and alternating with yellow). Protective sheds should be installed at the main entrances and exits and passages along the building (high-rise buildings should be double-layered). Scaffolding and safety nets must be selected, erected and accepted according to specifications. Vertical poles and large horizontal bars should be horizontally and vertically spaced in compliance with requirements. External frames and safety nets should be flat. , the length of the large and small horizontal bars extending out of the outer frame (safety net) should be neat and beautiful, and the length of the vertical poles and large horizontal bars extending out of the outer frame should not be greater than 100mm. After the scaffolding has passed the acceptance inspection, an acceptance certificate must be hung with records and hung on the outside of the scaffolding. Exterior scaffolding must be suitable for the construction requirements of doors, windows, curtain walls, exterior insulation projects and exterior wall decoration. Requirements under the scaffolding: tamped plain soil, 100 thick 3:7 lime soil, 30 thick 1:6 cement mortar plastering or 50 thick gravel paving.

4.24. The safety nets of the surrounding buildings of the project are new flame-retardant dense-mesh safety nets that meet industry requirements. The dense-mesh safety nets are a one-time amortization, and dilapidated safety nets are not allowed to be used in this project.

4.25. Construction site hardening requirements:

(1) The main road is 6m wide, the base soil is tamped, 150mm thick 3:7 lime soil, 80mm thick C20 concrete, and drainage ditches are set; roads within the construction site and The 100-meter road outside the gate is cleaned every day by dedicated personnel to keep it clean.

(2) The rest of the site is made of 80mm thick ash-crushed gravel and hardened ground.

4.26. When Party B is constructing near power equipment, transmission lines, underground pipelines, sealed and earthquake-proof workshops, flammable and explosive areas, living facilities of surrounding residents, and traffic arteries facing streets, Party B shall propose safety protection measures to the supervisor before the start of construction, and after approval by the supervisor implementation. The electrical boxes, electrical appliances and wiring used on site comply with standards. The color of the box is eye-catching, the door lock is complete, and it is colored and numbered.

4.27. The derrick erection must comply with the specification requirements, and the frame body should be buried in the original soil layer no less than 1m. The four corners of the piles should be rolled firmly, or the concrete foundation should be pre-embedded with foot bolts to connect the frame body and the stabilizing frame body to the building. Two steel wire ropes should be installed on the inside of the top cantilever wall. The frame is surrounded by small eye safety nets on all sides.

4.28. The three insurances and five limits of the tower crane must be complete and effective. The machine is designated and the person is designated and the command is determined. The acceptance qualification plate, equipment technical performance card and on-duty personnel card are hung. The safety and insurance devices of the construction elevator must be complete and effective. The floor entrance and exit door rails are complete and practical. There are two double floors on the ground floor. A protective shed is installed on the first floor, and the acceptance certificate, rated load sign, and operator sign are hung.

4.29. Safety signs: There are safety publicity signs on site. Eye-catching safety publicity signs and appropriate safety warning signs should be installed at major construction sites, operating points and dangerous areas, as well as at main entrances.

4.30. Party B must arrange on-site fire protection facilities in accordance with relevant national regulations and the requirements of Party A and the supervisor, and set up a number of fire extinguishers at corresponding levels or locations. One fire extinguisher per 25 square meters of building area in carpentry rooms, paint rooms, etc., and non-key warehouses and other buildings The area is equipped with two fire extinguishers per 100 square meters of construction area, and each floor of the scaffolding is equipped with fire extinguishers for unified management. Party B must strictly implement the three-level fire approval system, and have dedicated personnel to supervise open fire operations, and be equipped with fire extinguishers and isolation measures. The distance between oxygen and acetylene bottles must meet specification requirements.

4.31. Four entrance protection:

(1) The stair entrance protection adopts ∮48 steel pipe railings, which are painted twice with yellow and black mixed paint.

(2) Make iron railings and protective doors at the elevator shaft entrance, material port, and material platform as required, and paint them with yellow and black paint twice.

(3) The reserved openings are constructed with steel pipes and shelves, a safety net is hung, and the steel pipes are painted twice with a mixture of yellow and black.

(4) The passage protection is built with ∮48 steel pipes, protected by double-layer bamboo fences, and the steel pipes are painted twice with yellow and black mixed paint.

4.32. Edge protection:

(1) ∮48 steel pipes are used around the foundation pit. The ground is firmly fixed and the height is not less than 1.2m. A safety net is hung on the facade. The steel pipes are painted twice with yellow and black mixed paint.

(2) The edge protection of balconies, floors, roofs, ramps, etc. shall be built with ∮48 steel pipes. The perimeter shall be firmly fixed and the height shall not be less than 1.2m. Safety nets shall be hung on the facades and the steel pipes shall be painted yellow and black. Mix the paint twice with each other.

4.33. Construction power system: adopts a three-level power distribution form of main distribution box, distribution box, and switch box. The metal distribution box is required to comply with the "Construction Power Inspection Score" and "Technical Specifications for Temporary Electricity Safety at Construction Sites" Relevant regulations for distribution boxes and switch boxes.

4.34. Green space protection: The green space is protected by steel pipes (painted yellow and black) and safety flags. No smoking allowed. Party B must properly protect the original trees and greening in the construction site in accordance with relevant regulations; if the trees are damaged or die (death caused by unnatural death or force majeure), Party B will bear full responsibility and compensate Party A for the loss.

4.35. There should be signs on the wall at the entrance of each temporary facility. When working on-site, the room should be kept clean and orderly, and items on the desk should be placed neatly. Various management systems should be hung on the wall.

4.36. On-site staff dormitories should be cleaned in a timely manner and kept clean and tidy, with beds, clothes, quilts and other daily necessities placed neatly.

4.37. The on-site kitchen should maintain good ventilation, indoor items should be placed neatly, and no people should be allowed to live there. It should be ensured that there are no mosquitoes, flies, or mouse holes.

4.38. Construction site management personnel should be neatly dressed and wear job badges.

4.39. It is not allowed to urinate or urinate anywhere in the construction site, and no littering of domestic garbage is allowed. Once found, heavy fines will be imposed and the construction unit undertaking the construction in the discovered area will be ordered to be responsible for rectification.

4.40. Graffiti is strictly prohibited within the construction site and on the walls of each floor.

4.41. It is strictly prohibited to pour domestic sewage and leftover food indiscriminately on site, and it is strictly prohibited to discard old clothes, daily necessities and other sundries everywhere.

4.42. Construction waste and domestic waste on site should be classified and stacked in a centralized manner, covered, and removed in a timely manner.

5. Acceptance inspection and penalties:

5.1. Basis for acceptance inspection:

(1) "XX Company's On-site Civilized Construction Management Regulations" and construction contract

(2) Ministry of Construction's "Construction Project Construction Site Management Regulations"

(3) "Measures for the Civilized Construction Management of Construction Projects in ×× Areas"

(4) "Technical Specifications for Safety in Working at Heights"

(5) "Temporary Construction Site Technical Specifications for Electricity Safety"

(6) "Construction Project Safety Protection, Civilized Construction Measures Fees and Usage Management Regulations"

(7) Other related construction regulations of national and local competent authorities Safety laws, regulations, norms, and regulations.

5.2. The construction unit should strictly implement on-site safe and civilized construction management regulations and conduct self-inspection and self-correction in accordance with regulations. Full-time safety officers should be responsible for daily inspections and put forward rectification requirements. The project department and supervisors will organize comprehensive inspections on a regular basis. If the rectification is not timely, they can be based on the problems. Depending on the severity, fines and penalties will be imposed on the construction unit.

5.3. Party A organizes supervision or relevant units to conduct inspections and evaluations once a month in accordance with the "Regulations on Construction Site Management of Construction Projects" promulgated by the Ministry of Construction, combined with the "Measures for the Civilized Construction Management of Construction Projects in ×× Areas" and the on-site management regulations formulated by Party A. If Party B's on-site evaluation score is 75-80 points, it shall make rectifications within a time limit as required by Party A's project director, and pay Party A a penalty of 1,000 yuan each time; if Party B's on-site evaluation score is 70-74 points, it shall make rectifications according to the requirements of Party A's project director The director requires comprehensive rectification and pays Party A a penalty of 2,000 yuan each time; if Party B scores less than 69 points (including 69 points) in the on-site evaluation, it shall stop work for rectification at the request of Party A's project director and pay Party A a penalty of 5,000 yuan. Yuan.

5.4. During the construction process, the project department should promptly organize on-site safety and civilized construction inspections. The supervision unit is responsible for daily process supervision and inspection of the construction unit's implementation of on-site safety and civilized construction management activities, witnessing the implementation of safe and civilized construction measures and fees, and at the same time The project department *** and the person responsible for handling the acceptance of safe and civilized construction measures fees will be reported to the head office as the basis for the final accounts upon completion.

For more information about engineering/service/purchasing tender document writing and production to improve the bid winning rate, you can click on the official website customer service at the bottom for free consultation: /#/?source=bdzd